Project: Duckie     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours # Pictures
187     Apr 09, 2024 Added air filter Engine 2 2   
186     Apr 08, 2024 Added baffling to cylinders #1 and #3 Engine 2 0   
185     Apr 06, 2024 Various Little Updates Paint / Decals 2 0   
184     Apr 06, 2024 Completed Piston/Cylinder Upgrade Engine 10 2   
183     Apr 05, 2024 Continued piston/cylinder upgrade Engine 12 7   
182     Apr 04, 2024 Upgraded pistons/cylinders with High Compression Engine 12 10   
181     Sep 01, 2023 Upgraded Falken FDC to v3 Avionics 20 1   
180     Aug 27, 2023 Finished paint & decals Paint / Decals 20 2   
179     Jun 22, 2023 Made & installed aluminum baffles Engine 4 0   
178     Jun 22, 2023 Tested EGT & CHT sensors for temp differences Avionics 1 0   
177     Jun 22, 2023 Fixed EGT #2 connection Avionics 4 0   
176     Jun 20, 2023 Replaced ELEVATOR springs Controls 2 0   
175     Jun 09, 2023 5 Hour Inspection Inspection 4 1   
174     Jun 07, 2023 Added metal tape covers on front cylinders Engine 1 3   
173     Jun 06, 2023 Added sparrow strainers to elevators Wings 6 1   
172     Jun 06, 2023 Calibrated fuel sensors Fuel System 8 1   
171     Jun 06, 2023 Changed light spring for one side to stronger Controls 1 0   
170     Jun 04, 2023 Prop Balance Propeller 2 0   
169     Jun 03, 2023 FIRST FLIGHT Inspection 1 0   
168     Jun 03, 2023 Swapped tires for better balance & fixed rotor wobble Landing Gear 4 0   
167     Jun 03, 2023 Swapped tires for better balance & fixed rotor wobble Landing Gear 4 0   
166     Jun 02, 2023 Installed air vent Interior Finish 3 0   
165     Jun 01, 2023 Tested Static & Pitot Avionics 2 0   
164     Jun 01, 2023 Labeled fuel fill Paint / Decals 1 1   
163     Jun 01, 2023 Installed, polished and added more screws to spinner Propeller 6 3   
162     May 31, 2023 Polished wing, canard and installed VGs Wings 3 2   
161     May 30, 2023 Fixed safety wiring on prop Propeller 1 1   
160     May 29, 2023 Installed new brake pedals Controls 8 2   
159     May 29, 2023 Label fuel fill Paint / Decals 1 1   
158     May 28, 2023 Checked travel for all control surfaces Controls 2 0   
157     May 27, 2023 Polished canopy glass Interior Finish 8 1   
156     May 27, 2023 Moved GPS for better reception Avionics 2 1   
155     May 27, 2023 Safety wired bolts Propeller 1 1   
154     May 25, 2023 Airworthiness Inspection PASSED Inspection 2 1   
153     May 24, 2023 Connected & installed air filter Engine 3 1   
152     May 24, 2023 Installed Fobo BT pressure gauges Landing Gear 2 0   
151     May 24, 2023 Installed N number, Experimental & Data Plate Paint / Decals 1 2   
150     May 19, 2023 Wrote POH & Checklists Inspection 40 0   
149     May 19, 2023 Redid brake lines Landing Gear 8 3   
148     May 13, 2023 Installed air intake connection to cowling Engine 1 4   
147     May 11, 2023 Installed arm padding & glare shield Interior Finish 4 4   
146     May 10, 2023 Redoing tailwheel geomotry & cleanup Inspection 8 11   
145     May 06, 2023 2nd Taxi Test Controls 8 7   
144     May 06, 2023 Installed canopy gas strut Interior Finish 4 1   
143     May 05, 2023 Redesigned, rewelded and reinstalled new rudder pedals Controls 20 1   
142     May 02, 2023 Covered all thru holes with silicone Avionics 1 5   
141     May 02, 2023 Strengthened tailwheel spring Landing Gear 16 4   
140     May 01, 2023 Fixed rudder wobble Controls 3 1   
139     May 01, 2023 Mounted missing plug hoods Avionics 1 2   
138     Apr 28, 2023 Finished brake install Controls 4 3   
137     Apr 28, 2023 Ran static & pitot lines to Falken Instrument Panel 2 2   
136     Apr 28, 2023 Redesigned rudder pedals for strength Controls 3 0   
135     Apr 27, 2023 Installed canopy lock & safety mechanism Fuselage 4 1   
134     Apr 27, 2023 Mounted batteries in tail Instrument Panel 4 2   
133     Apr 23, 2023 Completed a W&B Inspection 2 3   
132     Apr 23, 2023 First Taxi Inspection 4 1   
131     Apr 23, 2023 Installed seat belts Interior Finish 6 1   
130     Apr 23, 2023 Programmed EFIS values Instrument Panel 1 0   
129     Apr 18, 2023 Made bracket & Installed pitch servo Avionics 8 5   
128     Apr 18, 2023 Finished rudder/tailwheel cables Controls 8 3   
127     Apr 16, 2023 Changed valve to fix tire leak Landing Gear 2 0   
126     Apr 16, 2023 Installed aileron servo bracket Controls 4 2   
125     Apr 16, 2023 Installed all tail aft rudder/tailwheel cables Controls 16 1   
124     Apr 15, 2023 Bled brake lines Controls 4 0   
123     Apr 15, 2023 Designed canopy locking mechanism in OnShape Fuselage 2 1   
122     Apr 14, 2023 Finished wiring for AP & ELT Instrument Panel 8 1   
121     Apr 12, 2023 Installed 3 antennas Avionics 4 1   
120     Apr 12, 2023 Resin wiped lower cowling Engine 1 1   
119     Mar 28, 2023 Mounted oil hatch Engine 4 0   
118     Mar 27, 2023 Installed brake calipers & Bled lines Landing Gear 8 4   
117     Mar 26, 2023 Installed Canopy Hinge Fuselage 8 1   
116     Mar 26, 2023 Installed AntiSplat kit Engine 4 1   
115     Mar 26, 2023 Made ELT tray Avionics 4 1   
114     Mar 25, 2023 Torqued Spark Plugs Engine 1 0   
113     Mar 25, 2023 Installed exhaust heat shields Engine 4 2   
112     Mar 23, 2023 Installed exhaust heat muff Engine 1 1   
111     Mar 22, 2023 Finished rough cowling work Engine 40 2   
110     Mar 19, 2023 Torqued & Safety Wired Engine Engine 4 0   
109     Mar 16, 2023 Tidied Up Engine Lines & Wires Engine 4 0   
108     Mar 15, 2023 Completed Plenum Engine 8 5   
107     Mar 12, 2023 Brake Line Install Landing Gear 8 3   
106     Mar 11, 2023 Metal cylinder baffling Instrument Panel 2 3   
105     Mar 11, 2023 Mounted ADC Instrument Panel 1 1   
104     Mar 11, 2023 Cut wheel axles Empennage 1 1   
103     Mar 11, 2023 Lots more plenum and cowling work Engine 40 25   
102     Feb 27, 2023 Plenum & Cowling Layed Ip Engine 40 15   
101     Feb 23, 2023 Installed FlightStick Avionics 3 2   
100     Feb 22, 2023 Mounted new prop Propeller 1 1   
99     Feb 21, 2023 Installed new FlightStick Avionics 4 1   
98     Feb 19, 2023 Adding intakes on cowling Engine 16 9   
97     Feb 19, 2023 Aligned wheel axles Landing Gear 16 4   
96     Feb 17, 2023 Fix avionics connection with new BT hub Avionics 10 2   
95     Feb 12, 2023 Weight check Inspection 2 1   
94     Feb 12, 2023 Fit cowling Engine 16 8   
93     Feb 11, 2023 Installed elevator trim Controls 10 1   
92     Feb 05, 2023 Make wiring harness and connect TXP&RadioCom Avionics 16 6   
91     Feb 05, 2023 Installed batteries and powered up panel Avionics 8 7   
90     Feb 02, 2023 First engine run … SUCCESS Engine 8 7   
89     Jan 30, 2023 Pickup propeller Propeller 8 4   
88     Jan 27, 2023 Finished panel including decals Avionics 40 1   
87     Jan 23, 2023 Installed prop extension Engine 4 1   
86     Jan 23, 2023 Hung engine Engine 8 5   
85     Jan 22, 2023 Started panel wiring Instrument Panel 16 3   
84     Jan 19, 2023 Installed TXP/ RadioCom tray Avionics 1 1   
83     Jan 19, 2023 Installed headset plug panel Instrument Panel 1 1   
82     Jan 18, 2023 Panel anodized Paint / Decals 1 2   
81     Nov 26, 2022 Started behind firewall wiring Avionics 8 5   
80     Nov 26, 2022 Finished wiring in front of firewall Firewall 8 1   
79     Nov 23, 2022 Finished alternator wiring Avionics 3 8   
78     Nov 22, 2022 More engine wiring Lighting 40 11   
77     Nov 16, 2022 Fix soft spot on passenger side Fuel System 16 3   
76     Nov 16, 2022 Made glare shield Interior Finish 16 2   
75     Nov 08, 2022 Installed various electrical components Lighting 8 5   
74     Nov 07, 2022 Installed fuel lines Fuel System 4 3   
73     Nov 03, 2022 Ran battery / starter wires Avionics 2 0   
72     Nov 03, 2022 Glued in zip tie holders Avionics 1 0   
71     Nov 03, 2022 Installed various SDS EFI parts Engine 4 1   
70     Nov 02, 2022 Installed rudder pedals & toe brakes Controls 4 1   
69     Nov 01, 2022 Painted interior with bilge paint Paint / Decals 8 2   
68     Oct 29, 2022 Primed interior and luggage compartment Paint / Decals 8 3   
67     Oct 29, 2022 Added finger holes Instrument Panel 2 1   
66     Oct 28, 2022 Primed interior Paint / Decals 4 3   
65     Oct 27, 2022 Installed firewall fwd comments Firewall 4 1   
64     Oct 26, 2022 Painted rudder pedals Paint / Decals 2 1   
63     Oct 25, 2022 Installed rudder & break mounts Controls 40 3   
62     Oct 21, 2022 Installed Trim Wheel & Test Fit Panel Controls 8 2   
61     Oct 16, 2022 Fixed bolts for throttle body Engine 3 1   
60     Oct 15, 2022 Installed arm rest hinge Interior Finish 2 1   
59     Oct 14, 2022 Installed bottom tap Fuel System 1 1   
58     Oct 12, 2022 Painted firewall Firewall 4 11   
57     Oct 09, 2022 Worked on CAD design & shopping lists Instrument Panel 16 5   
56     Oct 06, 2022 Test fit panel & rudder placement Instrument Panel 8 7   
55     Oct 02, 2022 Added bell crank in tail Controls 4 2   
54     Oct 01, 2022 Applied 2 extra layers of BID in tail Fuselage 4 3   
53     Sep 29, 2022 Closing main fuel tank Fuel System 40 13   
52     Sep 18, 2022 Weight fuselage Inspection 1 2   
51     Sep 18, 2022 Closed off firewall with boxes Firewall 6 4   
50     Sep 18, 2022 Fiberglassed in header fitting Fuel System 3 5   
49     Jul 28, 2022 Molded new bottom main tank skin, inside fuselage Fuel System 4 4   
48     Jul 27, 2022 Cut out old fuel filler box & pipe Fuel System 2 4   
47     Jul 26, 2022 Cut bottom open for future work Fuselage 2 1   
46     Jul 23, 2022 Designed new fuel system Fuel System 4 1   
45     Jul 23, 2022 Investigated warped floor under fuel tank Fuselage 8 6   
44     Jul 17, 2022 Test hung engine Engine 2 6   
43     Jul 14, 2022 Floxed in header tank donut Fuel System 2 2   
42     Jul 14, 2022 Torqued everything according to SDS manual specs Engine 1 0   
41     Jul 14, 2022 Made bell crank Controls 4 1   
40     Jul 14, 2022 Installed more engine components Engine 6 3   
39     Jul 13, 2022 Continued engine components install Engine 8 1   
38     Jul 13, 2022 Repaired all aileron fairings Fuselage 4 2   
37     Jul 11, 2022 Installed new aileron spacers Controls 4 2   
36     Jul 11, 2022 Installed u-joint for ailerons Controls 8 1   
35     Jul 08, 2022 Tapped fuel intakes Engine 2 3   
34     Jul 08, 2022 Installed main tank fuel sender Fuel System 4 5   
33     Jul 08, 2022 Created arm rest opening Fuselage 4 4   
32     Jun 28, 2022 Made firewall box Firewall 3 1   
31     Jun 27, 2022 Installed oil screen cover Engine 1 1   
30     Jun 27, 2022 Made & Installed Reflexor Controls 16 6   
29     Jun 27, 2022 Cleaned and installed all control surfaces Controls 8 4   
28     Jun 25, 2022 Test fit reflexor Controls 4 4   
27     Jun 25, 2022 Installed control surfaces Controls 4 2   
26     Jun 25, 2022 Assembled rudder pedals Fuselage 3 1   
25     Jun 25, 2022 Primed interior Fuselage 8 3   
24     Jun 22, 2022 Installed new oil filter adapter Engine 1 1   
23     Jun 21, 2022 Cleaned, sanded & primed inside cockpit Fuselage 1   
22     Jun 21, 2022 Removed t-tail bumps Empennage 8 4   
21     Jun 19, 2022 Installed engine mounts Firewall 8 1   
20     Jun 17, 2022 Installed REAL pushrod tubes Engine 5 1   
19     Jun 17, 2022 Trimmed firewall more Fuselage 2 1   
18     Jun 17, 2022 Made baggage hole covers Fuselage 4 2   
17     Jun 16, 2022 Test fitted engine mounts Fuselage 4 5   
16     Jun 15, 2022 Removed rudder pedals & tabs Engine 3 1   
15     Jun 15, 2022 Removed oil screen housing Engine 1 1   
14     Jun 14, 2022 Drilled engine mount center holes Firewall 3 1   
13     Jun 14, 2022 Mounted alternator gear assembly Engine 1 1   
12     Jun 14, 2022 Microed canopy seam Fuselage 1 1   
11     Jun 14, 2022 Installed baggage tray lip Fuselage 3 1   
10     Jun 13, 2022 Remounted tail section Fuselage 2 2   
9     Jun 12, 2022 Mounted new tailwheel Landing Gear 3 1   
8     Jun 12, 2022 Cut brake opening Landing Gear 3 0   
7     Jun 12, 2022 Installed tires Landing Gear 3 3   
6     Jun 11, 2022 Installed 2 of 4 new pushrod tubes Engine 4 2   
5     Jun 06, 2022 Fiberglass Day Fuselage 10 7   
4     May 08, 2022 Removed elevator & rudder controls Controls 4 2   
3     May 08, 2022 Removed corroded ailerons Controls 4 4   
2     May 03, 2022 Moved plane inside Workshop 3 5   
1     May 03, 2022 Bought Duckie Workshop 1 1   
------------ -------------
Totals1219    478   





NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.