Project: nburkholder     -     Project Summary     - Optional PDF document function     - Multi-sectional PDF
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
332     May 14, 2024 More Canopy Track Attachment Fuselage 3 $0.00    2   
331     May 13, 2024 Rivet F-705 Bullkhead Assembly to Fuselage Fuselage 2 $0.00    0   
330     May 12, 2024 Rivet F-705 Bullkhead Assembly and Skins to Longeron Fuselage 2 $0.00    0   
329     May 11, 2024 Replace Mixture Control Lever and Cable Mount Engine 3 $0.00    5   
328     May 10, 2024 Vist with Technical Advisor Inspection 1 $0.00    0   
327     May 10, 2024 Test Fuel Tank Wings 1.5 $0.00    2   
326     May 05, 2024 Attach and Seal Right Wing Inboard Fuel Tank Rib Wings 2 $0.00    1   
325     May 04, 2024 Right Wing Inboard Rib Wings 10 $0.00    10   
324     May 01, 2024 Fabricate Canopy Slider Track Fuselage 2.5 $0.00    3   
323     Apr 30, 2024 Bend Canopy Slide Spacer Fuselage 1 $0.00    2   
322     Apr 30, 2024 Verify Rubber Baffle Fitment at Cowl Engine .3 $0.00    2   
321     Apr 30, 2024 Mount Nutplates to Lower Cowl Fuselage 1.5 $0.00    2   
320     Apr 28, 2024 Add Filter Air Box Baffle Engine 1.5 $0.00    1   
319     Apr 28, 2024 Move Oil Cooler Right 3/4" Engine 2 $0.00    2   
318     Apr 28, 2024 Fasten Aluminum Backing Tabs to Front Lower Cowl Fuselage 1 $0.00    2   
317     Apr 27, 2024 Lower Cowl Skybolts and Rivets Fuselage 4 $0.00    8   
316     Apr 24, 2024 Mount Skybolts at Right Cowl Horizontal Split Line Fuselage 2.5 $0.00    2   
315     Apr 23, 2024 Prepare Skybolt Flanges for Right Cowl Split LIne Fuselage 3 $0.00    4   
314     Apr 21, 2024 Attach Skybolt Flanges to Lower Cowl Horizontal Split LIne Fuselage 3 $0.00    5   
313     Apr 20, 2024 Prepare Skybolts Along Left Horizontal Cowl Split Line Fuselage 3 $0.00    1   
312     Apr 20, 2024 Install Skybolts on Upper Cowl at Firewall Fuselage 2 $0.00    2   
311     Apr 19, 2024 Trim Lower Cowl Horizontal Split LIne Fuselage 3 $0.00    2   
310     Apr 18, 2024 Trim Upper Cowl and Install Skybolt Fuselage 3 $0.00    2   
309     Apr 15, 2024 Upper Cowl Oil Door Fuselage 2 $0.00    1   
308     Apr 14, 2024 Lower Cowl Attachment Fuselage 3 $0.00    3   
307     Apr 13, 2024 Lower Cowl Fuselage Attachment Fuselage 5 $0.00    2   
306     Apr 12, 2024 Fitting Cowl with Skybolts Fuselage 5 $0.00    5   
305     Apr 05, 2024 Drill Locating Holes for Cowl Skybolt Studs Fuselage 6 $0.00    1   
304     Mar 30, 2024 Prime Skybolt Flanges Fuselage 3 $0.00    2   
303     Mar 30, 2024 Mount the exhaust hangers Engine 1 $0.00    1   
302     Mar 30, 2024 Mount Oil Cooler Engine 1 $0.00    2   
301     Mar 24, 2024 Mount Lower Cowl Vertical Skybolt Flanges Fuselage 3 $0.00    2   
300     Mar 24, 2024 Supertracks Rear Mount Fuselage 2.5 $0.00    2   
299     Mar 23, 2024 Prepare Upper Cowl Skybolt Flanges Fuselage 5 $0.00    3   
298     Mar 22, 2024 Trim and Fit Upper and Lower Cowl Fuselage 4 $0.00    5   
297     Mar 19, 2024 Mount Super Tracks, Lower Cowl Fuselage 4 $0.00    4   
296     Mar 17, 2024 Trim heat muff exit port Engine 1.5 $0.00    3   
295     Mar 17, 2024 Canopy Preparation Fuselage 6 $0.00    6   
294     Mar 17, 2024 Remove Cowl Pipe Mold Fuselage .5 $0.00    1   
293     Mar 17, 2024 Filter Air Box Cable Engine 1 $0.00    2   
292     Mar 16, 2024 Fabricate Work Stand Workshop 5 $0.00    1   
291     Mar 16, 2024 Attach Alternate Air Door Engine 0.5 $0.00    0   
290     Mar 16, 2024 Fiberglass Cowling At Exhaust Pipe Exit Fuselage 1.5 $0.00    4   
289     Mar 15, 2024 Final Cowl Trim Fuselage 4 $0.00    6   
288     Mar 14, 2024 Trim Cowl at Firewall Fuselage 3 $0.00    7   
287     Mar 13, 2024 Canopy Cowl trim lines Fuselage 1 $0.00    0   
286     Mar 13, 2024 Filter Air Box Alternate Air Engine 2 $0.00    1   
285     Mar 12, 2024 Cleco Cowling to Fuselage Fuselage 2 $0.00    3   
284     Mar 12, 2024 Trial Fit Exhaust to Engine Engine 2 $0.00    4   
283     Mar 12, 2024 Rivet Filter Air Box to Top Plate Engine 1 $0.00    1   
282     Mar 08, 2024 Preliminary Cowling Fit Fuselage 3 $0.00    5   
281     Mar 07, 2024 Filter Air Box Fiberglass Engine 5 $0.00    1   
280     Mar 03, 2024 Fabricate Filtered Box Engine 5 $0.00    2   
279     Mar 02, 2024 More Cowl to Prop Spinner Clearance Adventures Fuselage 2 $0.00    1   
278     Mar 01, 2024 Mount Aux Generator and Oil Filter Engine 1 $0.00    1   
277     Mar 01, 2024 Trim Lower Cowl Fuselage 2 $0.00    6   
276     Feb 29, 2024 Attach Nose Bowl Plate to Cowl Fuselage 2 $0.00    1   
275     Feb 26, 2024 More Cowl Preparaton Fuselage 4 $0.00    8   
274     Feb 24, 2024 Cowl Preparation Fuselage 3 $0.00    5   
273     Feb 23, 2024 Fitting Engine Cowl Fuselage 3 $0.00    1   
272     Feb 22, 2024 Spinner Back Plate and Ez Cowl Jig Propeller 3 $0.00    5   
271     Feb 20, 2024 Cut Out Prop Spinner Backplate Propeller 4 $0.00    2   
270     Feb 10, 2024 Remake Exhaust Headers Engine 6 $0.00    5   
269     Feb 08, 2024 Final Exhaust Mockup Fitting Engine 4 $0.00    4   
268     Feb 02, 2024 Finish Wiring and Power Up Avionics 4 $0.00    1   
267     Jan 30, 2024 Refit #2 and #4 Exhaust Primaries Engine 2 $0.00    2   
266     Jan 28, 2024 Mock up #1 and #3 Exhaust Primaries Engine 5 $0.00    8   
265     Jan 27, 2024 Test Fit #2 and #4 Primaries Engine 5 $0.00    8   
264     Jan 26, 2024 Mount Exhaust System Mockup Artifacts Engine 4 $0.00    10   
263     Jan 25, 2024 Mount Left Cable Raceway Wiring 1 $0.00    1   
262     Jan 23, 2024 Mount Cable Raceway Wiring 1 $0.00    2   
261     Jan 20, 2024 Connect OAT sensor to AHRS Avionics 1 $0.00    0   
260     Jan 20, 2024 Update Secondary Battery Wiring Wiring 4 $0.00    3   
259     Jan 19, 2024 Wire Avionics Bus to Airframe Avionics 6 $0.00    2   
258     Jan 14, 2024 Place Avionics Wiring Harness in Airframe Avionics 5 $0.00    2   
257     Jan 13, 2024 Complete Avionics Wiring Harness Avionics 8 $0.00    1   
256     Jan 06, 2024 Create New Wiring Harness Avionics 6 $0.00    1   
255     Jan 05, 2024 Start Avionics Bus Rewire Avionics 2 $0.00    2   
254     Jan 05, 2024 Fabricate mixture cable bushing Engine 2 $0.00    3   
253     Jan 04, 2024 Fabricate prototype bushing Engine 2 $0.00    3   
252     Dec 30, 2023 Test fit Throttle and Mixture cable attachments Engine 4 $0.00    9   
251     Dec 29, 2023 Oil Cooler Firewall Mounting Flange Engine 2 $0.00    2   
250     Dec 24, 2023 Firewall Oil Cooler Mount Engine 4 $0.00    6   
249     Dec 22, 2023 Tentative oil cooler mount Engine 4 $0.00    2   
248     Dec 21, 2023 Adjust Mixture Cable Engine 1.5 $0.00    1   
247     Dec 21, 2023 Wire Starter Motor and Engine Ground Wiring 3 $2.00    5   
246     Dec 19, 2023 Mount Fuil Injection Throttle Body Engine 3 $0.00    2   
245     Dec 19, 2023 Remove all wiring to Garmin Avionics Wiring 2 $0.00    1   
244     Dec 19, 2023 Replace starter motor Engine 1 $0.00    1   
243     Dec 10, 2023 Mount engine to airframe Engine 3.5 $0.00    2   
242     Dec 08, 2023 Right Gear Leg Fairing Landing Gear 4.5 $0.00    3   
241     Dec 06, 2023 Complete Left Landing Gear Fairing Landing Gear 3 $0.00    2   
240     Dec 03, 2023 Start Gear Leg Fairing Fabrication Landing Gear 4 $0.00    1   
239     Nov 26, 2023 Fabricate Left Brake Line Landing Gear 2 $0.00    2   
238     Nov 25, 2023 Fabricate Right Brake Line Landing Gear 4 $0.00    3   
237     Nov 24, 2023 Attach Right Brake Landing Gear 1.5 $0.00    1   
236     Nov 23, 2023 Mount Left Brake Landing Gear 2 $0.00    1   
235     Nov 19, 2023 Attach engine mount and landing gear Landing Gear 3 $0.00    1   
234     Nov 18, 2023 LRU Configuration Avionics 2 $0.00    1   
233     Nov 09, 2023 Power up Avionics Avionics 2 $0.00    1   
232     Nov 06, 2023 Verify bus wiring Wiring 3 $0.00    3   
231     Nov 05, 2023 Verify fuse block wiring Wiring 1 $0.00    1   
230     Nov 04, 2023 Install ADS-B and Transponder Antennas Avionics 5 $0.00    6   
229     Nov 03, 2023 Begin Wiring Checkout Wiring 2 $0.00    1   
228     Nov 01, 2023 Fabricate and Install Antenna Cables Avionics 4 $0.00    3   
227     Oct 29, 2023 Mount Com Antenna Fuselage 1 $0.00    2   
226     Oct 28, 2023 Antenna and Cable Infrastructure Fuselage 5 $0.00    5   
225     Oct 27, 2023 tid bits Fuselage 2 $0.00    2   
224     Oct 23, 2023 Add conduit Fuselage 2 $0.00    2   
223     Oct 22, 2023 Rivet Doubler Plates to fuselage Fuselage 2 $0.00    2   
222     Oct 21, 2023 GPS & ELT antenna doubler plates Fuselage 5 $0.00    6   
221     Oct 20, 2023 Complete Fly LEDs wiring Wiring 2 $0.00    2   
220     Oct 18, 2023 Wiring at Fly LEDs Board Wiring 2 $0.00    1   
219     Oct 16, 2023 Wire rerouting at Fly LED board Wiring 2 $0.00    1   
218     Oct 15, 2023 Wiring cleanup Wiring 3 $0.00    2   
217     Oct 14, 2023 Mount Terminal Blocks Wiring 3 $0.00    2   
216     Oct 13, 2023 Rivet subpanel and instrument panel Fuselage 4 $0.00    5   
215     Oct 10, 2023 Elevator Trim Circuit Breaker Wiring 1 $0.00    1   
214     Oct 09, 2023 Rivet Firewall Recess to Firewall Firewall 1.5 $0.00    1   
213     Oct 07, 2023 Mount ANL fuse block Firewall 2 $0.00    2   
212     Oct 01, 2023 Move pilot stick switch wiring Controls 1 $0.00    1   
211     Oct 01, 2023 Rivet subpanels Fuselage 2 $0.00    3   
210     Sep 30, 2023 Mount manifold and terminal block Firewall 4 $0.00    1   
209     Sep 26, 2023 Complete installing AHRS doubler plate Fuselage 2 $0.00    1   
208     Sep 24, 2023 Fuselage Modifications Fuselage 8 $0.00    6   
207     Sep 22, 2023 More wiring Wiring 4 $0.00    0   
206     Sep 21, 2023 More Wiring Wiring 4 $0.00    4   
205     Sep 17, 2023 Subpanel wiring Wiring 4 $0.00    1   
204     Sep 16, 2023 Subpanel fabrication and current shunt Fuselage 6 $0.00    6   
203     Sep 10, 2023 Fabricate terminal strip mount Wiring 6 $0.00    5   
202     Sep 08, 2023 LIghtspeed ignition wiring Wiring 4 $0.00    5   
201     Sep 03, 2023 GPS keep alive fuse Wiring 1 $0.00    1   
200     Sep 02, 2023 More Panel Wiring Instrument Panel 3 $0.00    2   
199     Sep 01, 2023 Primary Power to panel Instrument Panel 2 $0.00    1   
198     Aug 31, 2023 Lighting and Panel power Instrument Panel 2 $0.00    2   
197     Aug 29, 2023 Flap & ELT Power Wiring 3 $0.00    2   
196     Aug 27, 2023 Instrument Panel attachment bracket Instrument Panel 1.5 $0.00    2   
195     Aug 27, 2023 Wire Copilot Display and Remote GPS/ADS-B Avionics 5 $0.00    2   
194     Aug 25, 2023 Wire EMS Power/Communication Cable Avionics 3 $0.00    1   
193     Aug 14, 2023 Wire avionics power Avionics 4 $0.00    3   
192     Aug 13, 2023 Primary Bus Wiring Wiring 8 $0.00    2   
191     Aug 13, 2023 Power wiring Wiring 8 $0.00    2   
190     Aug 07, 2023 Tech Advisor visit Inspection 1 $0.00    0   
189     Aug 07, 2023 wing tip lens Wings 2 $0.00    2   
188     Aug 06, 2023 Right wing tip lights Wings 6 $0.00    2   
187     Aug 05, 2023 A few wires Firewall 1 $0.00    2   
186     Aug 04, 2023 Primary Battery grounding strp Firewall .5 $0.00    1   
185     Aug 04, 2023 Wing Inspection Panel Nut Plates Wings 1 $0.00    1   
184     Jul 31, 2023 Attach nut plates to right wing tip Empennage 8 $0.00    2   
183     Jul 29, 2023 Right wing tip Empennage 4 $0.00    2   
182     Jul 28, 2023 Empennage intersection fairing Empennage 4 $0.00    3   
181     Jul 27, 2023 Add aircraft ground Firewall 2 $0.00    3   
180     Jul 22, 2023 primary bus avionics fuse block Instrument Panel 2 $0.00    2   
179     Jul 21, 2023 secondary avionics bus fuse block Instrument Panel 3 $0.00    5   
178     Jul 19, 2023 Fitting canopy frame Fuselage 8 $0.00    0   
177     Jul 14, 2023 Fit sliding canopy frame to fuselage Fuselage 8 $0.00    6   
176     Jul 09, 2023 Attach Roll Bar Fuselage 8 $0.00    4   
175     Jul 09, 2023 Add penetrations for cabling and vacuum line Firewall 4 $0.00    2   
174     Jul 07, 2023 Add subpanel supports for avionics and control cables Fuselage 4 $0.00    2   
173     Jul 02, 2023 Attach stick grips Fuselage 2 $0.00    2   
172     Jul 01, 2023 Test fit panel Fuselage 4 $0.00    3   
171     Jun 30, 2023 Avionics Wiring Avionics 4 $0.00    2   
170     Jun 29, 2023 Left Wing Tip plate nuts Wings 2 $0.00    1   
169     Jun 25, 2023 Transponder Backshell Avionics 3 $0.00    1   
168     Jun 24, 2023 Complete backshells Avionics 3 $0.00    1   
167     Jun 20, 2023 Wing Inspection Covers Wings 3 $0.00    2   
166     Jun 18, 2023 Complete left wing lens cap Lighting $0.00    2   
165     Jun 09, 2023 Start mounting left wing tip lights Lighting 3 $0.00    3   
164     Jun 07, 2023 Audio Panel wiring Avionics 2 $0.00    1   
163     Jun 07, 2023 Rivet wing tip stiffener rib Wings 1 $0.00    2   
162     Jun 05, 2023 Install wing tip ribs Wings 3 $0.00    2   
161     Jun 04, 2023 Fit left wing tip Wings 4 $0.00    3   
160     Jun 04, 2023 Attach left aileron to wing Wings 4 $0.00    4   
159     Jun 03, 2023 Attach aileron hinge brackets Wings 3 $0.00    3   
158     Jun 02, 2023 Begin panel wiring Avionics 2 $0.00    1   
157     Jun 02, 2023 Ailerons and Flaps delivered Wings 1 $0.00    4   
156     Jun 01, 2023 Panel wiring preparation Avionics 3 $0.00    0   
155     May 28, 2023 Mount Alternate Air Door cable pass through Fuselage 2 $0.00    2   
154     May 28, 2023 Fabricate secondary battery hold down strap Fuselage 3.5 $0.00    6   
153     May 28, 2023 Fabricate new avionics tray rails Avionics 4 $0.00    7   
152     May 27, 2023 Test fit secondary battery box Avionics 8 $0.00    2   
151     May 27, 2023 Cut avionics subpanel mounting hole Avionics 3 $0.00    3   
150     May 26, 2023 Battery box for secondary bus Avionics 8 $0.00    1   
149     May 23, 2023 Avionics and display mounts Instrument Panel 3 $0.00    6   
148     May 21, 2023 Complete match drilling forward top skin Fuselage 4 $0.00    3   
147     May 19, 2023 Fabricate panel mounting angles Instrument Panel 1.5 $0.00    2   
146     May 19, 2023 Test fit forward upper fuselage skin Fuselage 1 $0.00    3   
145     May 19, 2023 Rivet left wing lower outboard skin Wings 3 $0.00    1   
144     May 18, 2023 Replace right wing vent line Fuselage 2 $0.00    1   
143     May 18, 2023 Begin riveting left wing lower outboard skin Wings 2 $0.00    0   
142     May 14, 2023 Replace left wing tank vent line Fuselage 2 $0.00    2   
141     May 14, 2023 Prepare left wing skin Wings 4 $0.00    11   
140     May 14, 2023 Discover leading edge wing ding Wings 1 $0.00    1   
139     May 13, 2023 Rivet wing skin Wings 6 $0.00    2   
138     May 12, 2023 Assemble main tires and tubes on rims. Wings 2 $0.00    3   
137     May 12, 2023 Fuselage cutout for gear legs and drill mounting holes Wings 4 $0.00    8   
136     May 11, 2023 Install left wing aileron and flap gap seals Wings 3 $0.00    2   
135     May 10, 2023 Mount Left Wing Aileron Brackets Wings 2 $0.00    5   
134     May 07, 2023 Mount ADS-B receiver and more Avionics 8 $0.00    9   
133     May 06, 2023 Mount Lightspeed Ignition Modules Engine 6 $0.00    3   
132     May 03, 2023 Right wing Wings 2.5 $0.00    0   
131     May 02, 2023 Right wing gap fairings and aileron bracket service bulletin Wings 10 $0.00    3   
130     May 01, 2023 Prepare flap and aileron gap seals Fuselage 4 $0.00    0   
129     Apr 30, 2023 Fabricate aileron hinge brackets Wings 6 $0.00    5   
128     Apr 29, 2023 Install copper bus bar Firewall 1 $0.00    1   
127     Apr 28, 2023 Complete aft top skin riveting Fuselage 2 $0.00    2   
126     Apr 28, 2023 Mount heat control cable and electrical components Firewall 10 $0.00    2   
125     Apr 27, 2023 Rivet aft top fuselage skin Fuselage 4 $0.00    2   
124     Apr 25, 2023 Horizontal Stabilizer trim pieces Fuselage 3 $0.00    2   
123     Apr 23, 2023 Rudder pedal brake lines Fuselage 2 $0.00    2   
122     Apr 22, 2023 Fabricate battery box and drill firewall penetrations Fuselage 8 $0.00    7   
121     Apr 16, 2023 Paint fuselage interiorq Fuselage 2 $0.00    6   
120     Apr 11, 2023 Pick up removable interior panels from paint shop Fuselage 2 $0.00    2   
119     Apr 08, 2023 Attach fuel senders to mounting plate Fuselage 6 $0.00    5   
118     Apr 08, 2023 Mount light control board Fuselage 6 $0.00    2   
117     Apr 03, 2023 Fuel line mounting plates Wings 4 $0.00    2   
116     Mar 31, 2023 Fabricate Pitot Tube mast mounting bracket Wings 4.5 $0.00    8   
115     Mar 30, 2023 Fuel selector valve and lines Fuselage 4 $0.00    2   
114     Mar 25, 2023 Collect panels for painter Fuselage 2 $0.00    1   
113     Mar 25, 2023 Fabricate stick boot rings Fuselage 2 $0.00    1   
112     Mar 25, 2023 Fabricate and install left fuel tank vent line Fuselage 3 $0.00    1   
111     Mar 24, 2023 Right Fuel Tank Vent Line Fuselage 4 $0.00    1   
110     Mar 19, 2023 Wiring for ELT and Pitch Servo Fuselage 4 $0.00    1   
109     Mar 18, 2023 ELT and Mag Sensor Fuselage 10 $0.00    4   
108     Mar 17, 2023 Wiring to Tail Light and Conduit to empennage Fuselage 8 $0.00    2   
107     Mar 15, 2023 Tail light wiring Fuselage 4 $0.00    3   
106     Mar 13, 2023 Routing static line Fuselage 4 $0.00    3   
105     Mar 11, 2023 Flaps and Static Port Fuselage 10 $0.00    4   
104     Mar 10, 2023 Flap attach bracket Fuselage 6.7 $0.00    1   
103     Mar 06, 2023 Install flap actuator Fuselage 4 $0.00    2   
102     Mar 05, 2023 Create carboard templates Fuselage 3 $0.00    1   
101     Mar 04, 2023 Begin empennage wiring Fuselage 5 $0.00    0   
100     Mar 04, 2023 Install heat vent valve Fuselage 5 $0.00    5   
99     Feb 24, 2023 Instrument panel layout Fuselage 10 $0.00    1   
98     Feb 19, 2023 Install control sticks Fuselage 4 $0.00    1   
97     Feb 12, 2023 Aileron Trim Fuselage 5 $0.00    1   
96     Feb 11, 2023 Elevator tips Empennage 2 $0.00    3   
95     Feb 11, 2023 Attach fresh air intakes Fuselage 4 $0.00    4   
94     Feb 04, 2023 Steps and Brake Reservior Fuselage 3 $0.00    4   
93     Feb 01, 2023 Install Stall Warn Hatch Wings 1.5 $0.00    0   
92     Jan 23, 2023 Install Pitch Servo Fuselage 2 $0.00    1   
91     Jan 21, 2023 Install Roll servo, HS tips Fuselage 4 $0.00    3   
90     Jan 20, 2023 Fabricate aileron push rods Wings 3 $0.00    3   
89     Jan 11, 2023 Inventory Finishing Kit Fuselage 3 $0.00    0   
88     Jan 01, 2023 Match drill panel angles Fuselage 4 $0.00    6   
87     Dec 31, 2022 Attach rudder pedals to rudder pedal assembly Fuselage 1 $0.00    0   
86     Dec 31, 2022 Fit front deck Fuselage 6 $0.00    5   
85     Dec 18, 2022 Mainly Crotch Straps and VS tip Fuselage 7 $0.00    3   
84     Dec 11, 2022 Mount Rudder to VS, install tail cone stiffeners Fuselage 6 $0.00    3   
83     Dec 11, 2022 Mount steps to fuselage Fuselage 1.3 $0.00    5   
82     Dec 10, 2022 Drill Rear VS Spar to bulkhead Fuselage 2 $0.00    0   
81     Dec 08, 2022 Drill horizontal and vertical stabilizer to fuselage Fuselage 2 $0.00    2   
80     Dec 07, 2022 Mount horizontal and vertical stabilizer to fuselage Fuselage 2 $0.00    0   
79     Dec 05, 2022 Steps and Vertical Stabilizeer Fuselage 4 $0.00    0   
78     Dec 03, 2022 Mount Left Step Fuselage 8 $0.00    2   
77     Dec 02, 2022 Start Right Step Mount Fuselage 3.3 $0.00    2   
76     Nov 28, 2022 Fabricate Elevator Pushrod Empennage 4 $0.00    5   
75     Nov 27, 2022 Fit Horizontal Stabilizer to Fuselage Empennage 6 $0.00    3   
74     Nov 23, 2022 Drill Elevator Horns Empennage 3 $0.00    3   
73     Nov 23, 2022 Fit elevators to stabilizer Empennage 3 $0.00    0   
72     Nov 19, 2022 More stands Workshop 5 $0.00    3   
71     Nov 18, 2022 Created front fuselage stand Workshop 3 $0.00    1   
70     Nov 17, 2022 Engine Delivered Engine 1 $0.00    1   
69     Nov 14, 2022 Inspect Quick Build Wings Wings 4 $0.00    0   
68     Nov 12, 2022 Rivet rear bulkhead and rudder stops Fuselage 7 $0.00    1   
67     Nov 11, 2022 Fit tail wheel mount and rear bulkhead Empennage 4 $0.00    3   
66     Nov 10, 2022 Forward covers Fuselage 5 $0.00    1   
65     Nov 09, 2022 Seat backs and rests Fuselage 4 $0.00    2   
64     Nov 08, 2022 Seat backs and rests Fuselage 4 $0.00    0   
63     Nov 07, 2022 Build right seat back Fuselage 3 $0.00    0   
62     Nov 06, 2022 Tunnel cover & seat backs Fuselage 10 $0.00    1   
61     Nov 03, 2022 Harness cable wear blocks Fuselage 4 $0.00    0   
60     Nov 02, 2022 Baggage Compartment Fuselage 3.5 $0.00    0   
59     Oct 30, 2022 Fitting forward top skin and F-6111 ribs Fuselage 5 $0.00    4   
58     Oct 30, 2022 Fabricate and fit elevator bell crank Fuselage 2.5 $0.00    0   
57     Oct 29, 2022 Mount Rudder pedals in fuselage Fuselage 5 $0.00    3   
56     Oct 25, 2022 Rivet rudder pedals Fuselage 4 $0.00    0   
55     Oct 23, 2022 Fuselage Fuselage 8 $0.00    2   
54     Oct 22, 2022 Rivet Seat Adjustment Parts Fuselage 2 $0.00    0   
53     Oct 20, 2022 Aero Sport Power Build School Day 3 Engine 6 $0.00    2   
52     Oct 19, 2022 Aero Sport Power Build School Day 2 Engine 5 $0.00    8   
51     Oct 18, 2022 Aero Sport Power Build School Day 1 Engine 8 $0.00    9   
50     Oct 15, 2022 Drill WD-409 keeper rivet holes Fuselage 3 $0.00    0   
49     Oct 14, 2022 Begin WD-409 installation Fuselage 4.5 $0.00    0   
48     Oct 13, 2022 Inspect Bulkheads Fuselage 3 $0.00    0   
47     Oct 12, 2022 Seatback fabrication Fuselage 4 $0.00    0   
46     Oct 10, 2022 Assembling F-904 Bulkhead Fuselage 1.5 $0.00    0   
45     Oct 09, 2022 Assemble F-601 Firewall Fuselage 6.5 $0.00    0   
44     Oct 08, 2022 Inventory Wings Wings 5.8 $0.00    0   
43     Oct 07, 2022 Inventory Fuselage and Wings Fuselage 5 $0.00    0   
42     Oct 06, 2022 Build Wing Cradke Workshop 4 $0.00    1   
41     Oct 01, 2022 Prepare hangar for QB fuselage and wings Workshop 2 $0.00    0   
40     Jul 13, 2022 Cut Trim Tab Rod Empennage 2 $0.00    3   
39     Jul 13, 2022 Mount Trim Servo Motor Empennage 2 $0.00    2   
38     Jul 11, 2022 Assemble Trim Tab Empennage 2.5 $0.00    4   
37     Jul 10, 2022 Left Elevator & Trim Tab Empennage 10 $0.00    0   
36     Jul 08, 2022 Rivet Left Elevator Empennage 8 $0.00    0   
35     Jul 07, 2022 Begin Assembling Left Elevator Empennage 2 $0.00    0   
34     Jul 06, 2022 Bend Elevator Trim Skin Empennage 2 $0.00    6   
33     Jul 06, 2022 Rivet Right Elevator Trailing Edge Empennage 2.5 $0.00    2   
32     Jul 05, 2022 Create Elevator Trim Rib and Clamp Empennage 1.5 $0.00    1   
31     Jul 03, 2022 Rivet Right Elevator Trailing Edge Empennage 1.5 $0.00    1   
30     Jul 02, 2022 Rivet Right Elevator Empennage 7.5 $0.00    0   
29     Jun 29, 2022 Right Elevator Skeleton Empennage 3 $0.00    0   
28     Jun 28, 2022 Right Elevator & Rudder Empennage 5 $0.00    0   
27     Jun 27, 2022 Rivet rudder trailing edge Empennage 2 $0.00    1   
26     Jun 25, 2022 Begin building right elevator Empennage 6 $0.00    0   
25     Jun 24, 2022 Rivet rudder trailing edge and skin to ribs Empennage 4.7 $0.00    2   
24     Jun 23, 2022 Rivet rudder skeleton and skin Empennage 5 $0.00    0   
23     Jun 22, 2022 Prepare rudder skins and trailing edge Empennage 2.5 $0.00    0   
22     Jun 21, 2022 Match drill and deburr rudder Empennage 2.5 $0.00    0   
21     Jun 19, 2022 Rivet VS skin, assemble rudder Empennage 6 $0.00    2   
20     Jun 18, 2022 Assemble Vertical Stabilizer Empennage 6.5 $0.00    2   
19     Jun 17, 2022 Build Vertical Stabilizer Empennage 3.3 $0.00    0   
18     Jun 09, 2022 Match drill right elevator skin and skin stiffeners Empennage 2 $0.00    0   
17     Jun 09, 2022 Prep right elevator skin Empennage 2 $0.00    0   
16     Jun 07, 2022 Start Rudder Skeleton Empennage 4 $0.00    0   
15     Jun 07, 2022 Finished HS Empennage 1.25 $0.00    0   
14     Jun 07, 2022 Finished riveting hs Empennage 1.25 $0.00    0   
13     Jun 06, 2022 Rivet HS skins to ribs and rear spar Empennage 4.5 $0.00    0   
12     Jun 05, 2022 Rivet HS skin to forward spar Empennage 1.5 $0.00    0   
11     Jun 04, 2022 Rivet HS skin to front spar Empennage 2 $0.00    0   
10     Jun 04, 2022 Rivets Empennage $0.00    0   
9     Jun 04, 2022 Rivet he skin Empennage $0.00    0   
8     May 23, 2022 Rivet front HS spar to nose ribs Empennage 2 $0.00    0   
7     May 22, 2022 Prepare to rivet HS skin to spars, Empennage 4 $0.00    1   
6     May 21, 2022 countersinking, nose ribs, elevator trim access plate Empennage 12 $0.00    3   
5     May 18, 2022 Elevator, rudder preparaton Empennage 5 $0.00    3   
4     May 17, 2022 Empennage assembly Empennage 6 $0.00    2   
3     May 16, 2022 Empennage parts preparation Empennage 5 $0.00    0   
2     May 15, 2022 Horizontal Stab Empennage 6 $0.00    0   
1     May 14, 2022 Received Kit-Inventory Empennage 4 $0.00    0   
------------ -------------- -------------
Totals1181.4    $2.00    757   