Project:
E-Xenos
- Project Summary
- Optional PDF document function
Entry Titles Only
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
Cost
# Pictures
114
May 01, 2024
Bottom wing skin installation
Wings
2
$0.00
2
113
May 01, 2024
Bottom wing skin installation
Wings
2
$0.00
0
112
Mar 10, 2024
Leading Edge Assembly
Wings
3
$0.00
1
Installing the right wing leading edge.
111
Feb 20, 2024
Oregon Aero Interior
Interior Finish
40
$0.00
1
Oregon Aero created a fabulous custom interior for our eXenos that incorporates a system of pads and cushions allowing a wide range of pilot dimensions to comfortably fit in the cockpit.
110
Jan 28, 2024
Right wing fully cleco'd
Wings
$0.00
7
109
Jan 24, 2024
Skins on right wing get #30 rivet holes
Wings
$0.00
6
108
Jan 21, 2024
Spar riveting continues - shims under wing (table bowed)
Wings
$0.00
11
107
Dec 20, 2023
Slight spar swerve post-rivets
Wings
$0.00
7
106
Dec 03, 2023
6 layer spar
Wings
$0.00
4
105
Nov 15, 2023
spar rivets continue
Wings
$0.00
20
104
Nov 01, 2023
spar chemical treatment - spoilers
Wings
$0.00
10
103
Oct 29, 2023
Dimpling and countersinking
Wings
$0.00
0
102
Oct 22, 2023
belly skin and ruddervator controls
Wings
$0.00
23
101
Oct 18, 2023
FLY ELECTRIC LLC kickoff meeting
Wings
$0.00
1
100
Oct 04, 2023
Wing spar and wing spoiler/brake
Wings
$0.00
13
99
Oct 01, 2023
wing spar riveting
Wings
$0.00
14
98
Sep 27, 2023
Lysa Wyni visits from Solomon Islands and builds an electric airplane part
Wings
$0.00
2
97
Sep 24, 2023
All 4 Jesus nuts are ready - Leonard B hard at work
Wings
$0.00
8
96
Sep 10, 2023
Crowded shop
Wings
$0.00
17
95
Sep 06, 2023
Wing work starting - the Jesus nut
Wings
$0.00
10
94
Jul 01, 2023
Ribs Ribs Ribs
Wings
$0.00
10
93
Jun 17, 2023
Aft Spar layout
Wings
3
$0.00
1
Long build tables ready, aft spars are underway
92
May 27, 2023
seatbelts and more
Wings
$0.00
22
91
May 27, 2023
Checking the fit
Fuselage
3
$0.00
1
Julia and Annika trying on the airplane
90
May 27, 2023
Checking the fit
Fuselage
3
$0.00
0
Julia and Annika trying on the airplane
89
May 20, 2023
Leonard B drilling and deburring
Wings
$0.00
4
88
May 05, 2023
Wing spar to fuselage - dimpling
Wings
$0.00
10
87
Apr 22, 2023
Wing spar to fuselage
Wings
$0.00
17
86
Apr 15, 2023
rudder pedals - repair of frayed power train cable
Wings
$0.00
5
85
Apr 08, 2023
Rivets in cockpit floor, rudder pedals finally, tail wheel alignment
Fuselage
$0.00
10
84
Apr 01, 2023
Drilling into STICK steel - phenolic repair
Fuselage
$0.00
4
83
Mar 25, 2023
adjust rudder phenolic and more
Fuselage
$0.00
5
82
Mar 23, 2023
Charger installation
Fuselage
16
$0.00
1
Battery charger installation using two 1 by 1 6061-T6 .125 inch angles.
81
Mar 16, 2023
Sit test
Fuselage
16
$0.00
1
Installed seat sling piano hinge mounts and tried it out. Annika Pexton, Al, Mike, Mark Donohue
80
Mar 11, 2023
Seat sling installation
Fuselage
16
$0.00
1
Fitted piano hinges to seat sling, and located and drilled matching piano hinges to cross beam and cockpit floor structure.
79
Mar 04, 2023
various
Fuselage
$0.00
11
78
Feb 26, 2023
Puyallup fair
Fuselage
$0.00
4
77
Feb 18, 2023
drilling through wheel axle (maybe)
Fuselage
$0.00
2
76
Feb 18, 2023
First Rollout
Fuselage
8
$0.00
1
On the gear and rolled out on its own for the first time!
75
Feb 17, 2023
Installed axles and wheels
Fuselage
16
$0.00
1
MJ, Mike, Joel, and Zach. Drilled 1/4-inch holes in Ti gear legs and axles, installed wheels. Discovered that gear leg bolt location on electric motor mount is installed 1 inch lower than standard, resulting in 18 inch dimension from bottom of fuselage instead of 16 and 11/16 called for in the plans. Consulted with Sonex Tech support and confirmed that 18 inches will work fine. They will notify electric Xenos builders of the need to alter the hole location in the gear legs.
74
Feb 11, 2023
Motor mount and glare shield
Fuselage
$0.00
17
73
Feb 08, 2023
Motor mount trial fit
Fuselage
16
$0.00
1
Did a trial fit of the motor mount after installing rivets and bolts to firewall area. Fabricated shims to go between motor mount and fittings per drawing. Mike, MJ, Joel, Al, and others.
72
Feb 04, 2023
re-drill for wheel axle and more
Fuselage
$0.00
6
71
Jan 25, 2023
Fabricated and attached fairing to aft fuselage
Fuselage
8
$0.00
1
Greg Williams fabricated fairing from sheet, bent over fire extinguisher for shape. George Steed and others finished smoothing of fairing and attachment to aft fuselage with sheet metal screws.
70
Jan 25, 2023
Grinding motor mount for fitting to firewall
Fuselage
6
$0.00
1
MJ and Mark working to fit new motor mount to firewall mount lugs. Material had to be removed in order to allow landing gear legs to be attached.
69
Jan 25, 2023
Skin polishing and N number
Fuselage
4
$0.00
1
Matheus Paxton polishing skins and attaching N number to fuselage.
68
Jan 25, 2023
Attach fwd fuselage
Fuselage
12
$0.00
1
Final riveting of forward fuselage to aft fuselage box.
Joel Mapes and Jeff Varaday
67
Jan 21, 2023
seat assembly
Fuselage
$0.00
6
66
Jan 07, 2023
cockpit work and drill sorting
Fuselage
$0.00
8
65
Dec 31, 2022
Cockpit floor component manufacturing
Fuselage
20
$0.00
2
Creating parts for cockpit floor assembly
Greg, Joel, MJ, Mike, Mark, Annika, Brandon, Zack
64
Dec 17, 2022
Fuselage work
Fuselage
12
$0.00
2
Finishing off joining forward fuselage to aft fuselage, drilling and reaming for fasteners.
Mark, Jeff, MJ, Annika, Matheus, Mike F., Al, Greg
63
Dec 10, 2022
Cockpit to Fuselage
Fuselage
$0.00
9
62
Nov 30, 2022
Y tail assembly
Tail Feathers
40
$0.00
4
Mike Friend, Zach, MJ and Joel rivet on the Y tail.
61
Nov 19, 2022
visit by Nantu Canelos (Achuar of Ecuador, lead pilot of Kara Solar solar boat initiative)
Fuselage
$0.00
5
60
Nov 18, 2022
Y tail riveting
Empennage
4
$0.00
1
Mike and mj
59
Nov 18, 2022
Install bracket to store wings
Wings
8
$0.00
1
Greg and zach
58
Nov 12, 2022
Deburring and more
Fuselage
$0.00
11
57
Nov 07, 2022
Checking the fwd fuselage
Fuselage
3
$0.00
1
56
Nov 05, 2022
Firewall and Instrument Panel
Fuselage
$0.00
17
55
Nov 02, 2022
Kitsap Sun front page
Fuselage
$0.00
1
Annika working on fuselage
54
Oct 26, 2022
Y tail install
Tail Feathers
16
$0.00
0
Mike MJ Jeff and Mark installing tail
53
Oct 26, 2022
Y tail install
Tail Feathers
16
$0.00
2
Mike MJ Jeff and Mark installing tail
52
Oct 26, 2022
MJ and Mark fitting the tail
Tail Feathers
2.5
$0.00
1
51
Oct 22, 2022
Y-tail and more phenolic
Fuselage
$0.00
9
50
Oct 22, 2022
Firewall
Fuselage
$0.00
4
49
Oct 22, 2022
Forward fuselage attached
Fuselage
2.5
$0.00
2
48
Oct 19, 2022
Turtle back Rib install
Fuselage
8
$0.00
2
Zach and Matt
47
Oct 19, 2022
Firewall fabrication
Fuselage
16
$0.00
1
Al and Zach build the firewall
46
Oct 15, 2022
General fuselage
Fuselage
$0.00
7
45
Oct 15, 2022
Fitting the tail
Tail Feathers
2.5
$0.00
1
Owen, Jeff, George and MJ check the fit of the starboard ruddervator.
44
Oct 12, 2022
Riveting the turtledeck
Fuselage
2
$0.00
1
Cara, Annika an MJ install the turtledeck.
43
Oct 08, 2022
Wing leading edge 'ribs'
Fuselage
$0.00
12
42
Oct 01, 2022
Turtle deck, riveting fuselage and more wing leading edge ribs
Fuselage
$0.00
13
41
Sep 24, 2022
Ribs for turtle deck and wings leading edges
Fuselage
$0.00
11
40
Sep 17, 2022
Cockpit side panels
Fuselage
$0.00
5
39
Sep 10, 2022
Yasmine pulls rivets
Fuselage
$0.00
4
38
Aug 31, 2022
Fuselage box assembly
Fuselage
100
$0.00
8
Assembly and riveting of fuselage box
37
Aug 13, 2022
Phenolic work starts
Fuselage
$0.00
5
36
Aug 10, 2022
Fuselage box assembly
Fuselage
$0.00
1
Fuselage box assembly
35
Jul 23, 2022
More Corrosion protection
Fuselage
$0.00
10
34
Jul 09, 2022
Corrosion protection
Fuselage
$0.00
7
33
Jun 25, 2022
Y-tail frame to fuselage
Fuselage
$0.00
10
32
Jun 18, 2022
Turtleneck work starting
Fuselage
$0.00
6
31
Jun 11, 2022
Squaring of fuselage, continued
Fuselage
$0.00
17
30
Jun 04, 2022
More squaring of fuselage
Fuselage
$0.00
11
29
May 28, 2022
Squaring fuselage
Fuselage
$0.00
4
28
May 28, 2022
Fuselage box - start process of squaring it
Fuselage
$0.00
12
27
May 25, 2022
Begin assembling fuselage box
Fuselage
$0.00
25
26
May 07, 2022
nut plates for two inspection panels
Fuselage
$0.00
13
25
Apr 30, 2022
U-channel work and Young Eagles breakfast
Fuselage
$0.00
9
24
Apr 27, 2022
Fuselage cross-ties
Fuselage
$0.00
6
23
Apr 23, 2022
Fuselage cross-ties and more
Fuselage
$0.00
21
22
Apr 16, 2022
Tips of V tails
Fuselage
$0.00
9
21
Apr 13, 2022
Nut plates in composite tips of V tails
Fuselage
$0.00
14
20
Apr 09, 2022
V-tail
Fuselage
$0.00
4
19
Apr 02, 2022
Y-tail skeleton
Fuselage
$0.00
5
18
Feb 02, 2022
Data probe
Fuselage
$0.00
5
17
Jan 29, 2022
Ribs continued
Fuselage
$0.00
4
16
Jan 26, 2022
Stabilator assembly
Tail Feathers
80
$0.00
3
Assembly of stabilator boxes.
15
Jan 19, 2022
V-Tail ribs continued
Fuselage
$0.00
5
14
Jan 16, 2022
Stabilator fabricaton
Tail Feathers
$0.00
2
Working on tail fins. Had to re-make three ribs and front spar on RH stabilator due to errors by original builder.
13
Jan 07, 2022
V-tail ribs correction
Fuselage
3
$0.00
12
12
Jan 05, 2022
tail hinge
Fuselage
$0.00
3
11
Dec 22, 2021
bending tail ribs
Fuselage
$0.00
2
10
Dec 18, 2021
Fixing bad V-tail from previous builder
Fuselage
$0.00
22
9
Dec 01, 2021
shop cleanup and opening the bad V-tail
Fuselage
$0.00
12
8
Nov 03, 2021
Shop cleanup and V-tail restart
Fuselage
$0.00
4
7
Oct 20, 2021
MJ arrives with Xenos kit from California
Kit Arrival
10
$0.00
2
The wing spars were boxed in Home Depot lumber and spanned the length of the truck and trailer.
All was dry until a rainstorm in Oregon.
The build team off-loaded and performed an initial inventory.
6
Oct 20, 2021
MJ Arrives with the kit from California
Kit Arrival
10
$0.00
0
Arrival, off-load and initial inventory of Xenos kit.
5
Oct 20, 2021
Preparations at BACE workshop
Workshop
80
$0.00
7
The eXenos kit just arrived, we have to inventorized all that is in it, whether any part is missing, and what kind of extras.
4
Sep 13, 2021
Assembly of powerplant at ZeroAvia in California
Engine
40
$0.00
3
Mike Friend traveled to California to assemble the powerplant at the premises of ZeroAvia in Hollister. Gabe DeVault assisted in creating a functional assembly.
Completed powerplant assembly delivered to BACE facility on September 13, 2021
3
Sep 07, 2021
Powerplant removal from donor motorcycle
Engine
40
$0.00
1
Stripping powertrain components from donor motorcycle in California
2
Aug 14, 2021
Preparation - shelf cleanout
Workshop
16
$0.00
2
Lots of marvelous "things" have been donated or simply dumped at BACE, resulting in low availability of horizontal space on shelves and benches. This is the continuation of the cleanout and revamp...
1
Jul 10, 2021
Setting up workspace at BACE
Workshop
100
$0.00
2
Organizing and cleaning up workspace in anticipation of kit arrival
------------
--------------
-------------
Totals
805.5
$0.00
727