Project: EAbel     -     Project Summary     - Optional PDF document function
Entry Titles Only           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
152     Mar 11, 2024 Covering Fuselage $0.00    0   
Two coats Polyspray on Fuse
 
151     Mar 10, 2024 Covering Fuselage 6 $0.00    0   
 
150     Mar 09, 2024 Covering Fuselage 6 $0.00    0   
 
149     Mar 08, 2024 Covering Fuselage 6 $0.00    0   
 
148     Mar 06, 2024 Covering Fuselage 6 $0.00    0   
 
147     Mar 05, 2024 Covering Fuselage 5 $0.00    0   
 
146     Mar 04, 2024 Covering Fuselage 6 $0.00    0   
 
145     Mar 03, 2024 Covering (sanding) Fuselage 7 $0.00    0   
 
144     Mar 02, 2024 Covering Fuselage 5 $0.00    0   
 
143     Mar 01, 2024 Covering started Fuse Silver Fuselage 6 $0.00    0   
 
142     Feb 29, 2024 Covering Fuselage 6 $0.00    0   
 
141     Feb 28, 2024 Covering Fuselage 6 $0.00    0   
 
140     Feb 24, 2024 Covering Fuselage 4 $0.00    0   
 
139     Feb 23, 2024 Covering (silver) Fuselage 5 $0.00    0   
 
138     Feb 22, 2024 Covering Fuselage 6 $0.00    0   
 
137     Feb 17, 2024 Covering Fuselage 7 $0.00    0   
 
136     Feb 16, 2024 Covering Fuselage 5 $0.00    0   
 
135     Feb 15, 2024 COvering (silver) Fuselage 6 $0.00    0   
 
134     Feb 10, 2024 covering Fuselage 6 $0.00    0   
 
133     Feb 08, 2024 Covering Fuselage 5 $0.00    0   
 
132     Feb 07, 2024 Covering finish work Fuselage 6 $0.00    1   
Sprayed silver polyspray on flaps and year legs
 
131     Feb 05, 2024 Covering finish work Fuselage 6 $0.00    0   
 
130     Feb 04, 2024 Covering finish work Fuselage 5 $0.00    0   
 
129     Feb 03, 2024 Covering finish work Fuselage 6 $0.00    1   
Sprayed polybrush
 
128     Feb 02, 2024 Fabric ironing and finish work Controls 5 $0.00    1   
Ironed fabric tapes and polybrushed as req
 
127     Jan 24, 2024 Fabric on flap Fuselage 7 $0.00    0   
Fabric and rib stitching
 
126     Jan 22, 2024 Fabric cont. Fuselage 6 $0.00    0   
 
125     Jan 21, 2024 Fabric Fuselage 6 $0.00    2   
Fabric on fuse
 
124     Jan 12, 2024 Fabric tapes Fuselage 6 $0.00    0   
 
123     Jan 11, 2024 Fabric tapes Fuselage 8 $0.00    0   
Tape on fuse
 
122     Jan 10, 2024 Fabric misc parts Fuselage 5 $0.00    0   
 
121     Jan 08, 2024 Fabric Fuselage 8 $0.00    0   
Fabric misc parts
 
120     Dec 23, 2023 GTR 20 com Avionics 3 $0.00    1   
Installed GTR 20 behind aft baggage
 
119     Dec 05, 2023 Left fabric Fuselage 8 $0.00    1   
Installed fabric left side of fuse.
 
118     Dec 04, 2023 Wing tip light lense Wings 2 $0.00    1   
Heated up lexan for landing light and bent over wingtip.
 
117     Dec 04, 2023 Covered right side Fuselage 8 $0.00    8   
Covered right side of fuse and vertical tail. Shrunk to 250 for now.
 
116     Dec 03, 2023 Wing tip install Wings 4 $0.00    4   
Installed wing tips, drilled holes for screws. Aligned properly
 
115     Dec 02, 2023 Covering Fuselage 4 $0.00    9   
Covered bottom of Fuse with Heavy Weight fabric
 
114     Nov 30, 2023 Misc Fuselage 6 $0.00    5   
Installed rivenuts for fuse to wing intersection. Installed door opener posts. Fabric a few interior areas
 
113     Nov 24, 2023 Aux tank Wings 6 $0.00    0   
Finished cutting and filing hole for aux tank.
 
112     Nov 22, 2023 Aux tank and holes for fuel lines Wings 6 $0.00    1   
Drilled holes for wiring and fuel lines. Started cutting out AUX tank hole in wing panel.
 
111     Oct 27, 2023 Front seat fabric Interior Finish 4 $0.00    1   
Installed fabric on front 2 seats
 
110     Oct 22, 2023 Fabric tapes on side panels Fuselage 5 $0.00    2   
Fabric tapes around corners and ends
 
109     Oct 21, 2023 Seat back Fuselage 3 $0.00    1   
Fabric seat back. Test fit
 
108     Oct 20, 2023 Pulley alignment Wings 4 $0.00    3   
Aligned pulley coming out of wing using spacer against spar.
 
107     Oct 19, 2023 Seat 3-4 intercom plugs Avionics 2 $0.00    1   
Installed plug and receptical for seats 3 and 4
 
106     Oct 15, 2023 Installed fabric on interior Fuselage 6 $0.00    2   
Installed medium weight fabric on interior. Outside of front seats. Polyfiber process
 
105     Oct 15, 2023 Glued inspection panels Fuselage 4 $0.00    2   
Glued inspection panels to tubing using DP 190 structural adhesive
 
104     Oct 14, 2023 Fabricated inspection panel Fuselage 6 $0.00    0   
Fabricated inspection panel under tail.
 
103     Oct 14, 2023 Interior lights Lighting 3 $0.00    0   
Installed wiring on 6 interior red led lights.
 
102     Oct 13, 2023 Interior lighting Lighting 5 $0.00    0   
Installed 6 interior led lights in painted holders. Riveted to stringers
 
101     Oct 07, 2023 Wiring for avionics from baggage area Avionics 6 $0.00    0   
 
100     Oct 06, 2023 Wiring from baggage area forward Avionics 6 $0.00    0   
 
99     Oct 05, 2023 Wiring of avionics Avionics 8 $0.00    0   
Wired rear ADHRS units
 
98     Oct 05, 2023 Coax for Vor and installed VOR antenna Avionics 9 $0.00    2   
Installed a Bulan and coax for VOR/LOC antenna. Installed mount plate underneath tail for antenna.
 
97     May 11, 2023 Covered elevators Tail Feathers 8 $0.00    2   
Covered both elevators with medium fabric. Stits process
 
96     May 02, 2023 Tapes Controls 5 $0.00    3   
Installed fabric tapes on stab via polybrush
 
95     Apr 13, 2023 Polybrush on stabs Empennage 6 $0.00    3   
Brushes polybrush on both stabs. Ironed out imperfections.
 
94     Apr 12, 2023 Fabric stabs Empennage 6 $0.00    2   
Glued fabric on stabs. Shrunk
 
93     Apr 10, 2023 Ran wiring Wings 4 $0.00    5   
Ran wiring for wing tips. Strobe, nav, landing. Ran wires for fuel pump and pitot heat.
 
92     Apr 06, 2023 Doilies for interior fabric Fuselage 6 $0.00    3   
Cut and polybrushed doilies on interior fabric. Cleaned tubing around. Attached fabric to outside of window to pull both sides down at same time.
 
91     Apr 05, 2023 Interior fabric Fuselage 8 $0.00    4   
Glued fabric for interior. Shrunk and polybrushed.
 
90     Mar 20, 2023 Door latch guide Fuselage 1 $0.00    2   
Fabricated for latch guide and primed
 
89     Mar 20, 2023 Kydex door panel Fuselage 2 $0.00    3   
Cut and formed kydex interior panel for rear cargo door. Trimmed left interior panel kydex to fit. Bent 90 to make riged in rear of interior piece.
 
88     Mar 20, 2023 Rear left window frame Fuselage 1.5 $0.00    2   
Permanently installed left rear window frame onto fuse using bucked rivets.
 
87     Mar 20, 2023 Front window skins Fuselage 3 $0.00    2   
Riveted front window skins both sides after interior paint.
 
86     Mar 18, 2023 Pulleys Wings 2 $0.00    2   
Installed pulleys and pulley guides. Secured guides to wing. Installed bolts.
 
85     Mar 17, 2023 Fuel pump and lines Wings 10 $0.00    2   
Fabrictaed plate for fuel pump,Installed fuel pump on plate, ran and bent fuel lines
 
84     Mar 15, 2023 Aoa, pitot, Wings 6 $0.00    3   
Drilled holes for grommets,Installed grommets for lines to pass through, Installed lines
 
83     Mar 14, 2023 Painted interior panels Fuselage 8 $0.00    2   
Painted interior frames and everything visible from within before interior install. Matched the tubing color.
 
82     Mar 08, 2023 Straps and aux tank Wings 8 $0.00    1   
Fabricated and installed fuel tank straps, temp installed aux tank.
 
81     Mar 03, 2023 Cable guards around pulleys Fuselage 3 $0.00    3   
Installed Teflon guards to keep cable from contacting pulleys.
 
80     Mar 02, 2023 Installed aoa and Pitot lines Wings 5 $0.00    3   
Installed aoa and pitot tube lines in the wings. Installed pitot mast.
 
79     Mar 02, 2023 Installed autopilot and elt Avionics 6 $0.00    6   
Fabricated shelf, pulley mounts and primed. Pulleys installed, elt/ antenna installed and yaw servo installed.
 
78     Feb 27, 2023 Doors cargo window Fuselage 5 $0.00    4   
Riveted door skins on with 3/32 counter sink rivets. Counter sunk alumium skins 3/4 easy through. Rivet had barely sticks up but looks good and still grabs well. 2 inch spacing.
 
77     Feb 22, 2023 Windows and frames Fuselage 6 $0.00    5   
Installed for frames and left windows. Installed stab inspection rings.
 
76     Feb 08, 2023 Primed Aluminum Fuselage 6 $0.00    3   
Setup paint booth, primed aluminum panels and pieces.
 
75     Feb 07, 2023 Etched Aluminum Fuselage 5 $0.00    5   
"Prekote" etched half alumium pieces with prekote and Scotch Brite.
 
74     Feb 05, 2023 Cut hole for aux Wings 5 $0.00    2   
Cut hole for Aux tank using Saber. Filed back area for opening fit. Checked aux tank fit.
-DB
 
73     Jan 31, 2023 Aft baggage cont. Fuselage 4 $0.00    1   
Built sides , top and aft baggage pieces from alumium. Requires riveting and securing.
 
72     Jan 30, 2023 Aft baggage mod Fuselage 7 $0.00    20   
Cut, Fabricated, and demurred aft bulkhead panel. Built aft baggage floor. Tested floor to 80 lbs limit. Slight deformation. Will limit aft baggage to 20 lbs at 4 g's. Complete aft baggage enclosure will increase strength. Total additional weight to build, 6lbs. Total enclosure size, 30 inches long, 5 wide on floor, 18 wide at top, 20 inches tall.
 
71     Jan 29, 2023 Nut plates Tail Feathers 2 $0.00    0   
Installed nut plates on horizontal stab for future horizontal to vertical tail fairing.
 
70     Jan 29, 2023 Deburring Fuselage 4 $0.00    0   
Deburred and removed plastic from Fuselage alumium pieces.
 
69     Jan 28, 2023 Deburring Fuselage 4 $0.00    1   
Removed aluminum from Fuse, started deburring.
 
68     Jan 28, 2023 Deburring Fuselage 1 $0.00    0   
Started deburring all aluminum skins for primer prep.
 
67     Jan 28, 2023 Tank straps Wings 1.5 $0.00    0   
Removed temporary tank strap chafe material. Sanded and primed straps.
 
66     Jan 28, 2023 Window frame Fuselage 2 $0.00    2   
Drilled window frame. Fit plexi in window.
 
65     Jan 26, 2023 Window frame drilling Fuselage 1 $0.00    0   
Drilled holes for window frame , left side
 
64     Jan 20, 2023 Right window frame Fuselage 4 $0.00    5   
Drilled holes for frame work on window. Cut plexi to fit inside window frame.
 
63     Jan 19, 2023 Right window frame Fuselage 3 $0.00    3   
Fit and trimmed right window frame to airplane
 
62     Jan 19, 2023 Poster board template Interior Finish 3.5 $0.00    2   
Cut poster board template for side panels to transfer to kydex later.
 
61     Jan 14, 2023 Rear windows front strip Fuselage 2.5 $0.00    3   
Fabricated leading edge strip in rear window to attach to door frame. Riveted 5 nutplates for future window replacement.
 
60     Jan 13, 2023 Plexi back windows Fuselage 4 $0.00    2   
Cut out .100 plexi glass for cargo and back left windows
 
59     Jan 11, 2023 Front door bottom Fuselage 2 $0.00    2   
Bent bottom of front doors inward to sit tight against airframe.
 
58     Jan 11, 2023 Cargo door gas strut Fuselage 3 $0.00    4   
Installed gas strut on forward cargo door. Fabricated ear for strut end and drilled hole in door frame.
 
57     Jan 10, 2023 Door skins Fuselage 5 $0.00    5   
Fit and trimmed front door skins.
 
56     Jan 09, 2023 Door skins Fuselage 2 $0.00    1   
Fit door skins to front right and left sides
 
55     Jan 05, 2023 Right door Fuselage 4 $0.00    4   
Bent for skin, positioned and drilled. Built stiffner
 
54     Jan 05, 2023 Plexi reinforcement Fuselage 2 $0.00    0   
Fabricated front of plexi reinforcement.
 
53     Jan 04, 2023 Let aft windows Fuselage 4 $0.00    5   
Fabricated stiffeners for left aft windows. Drilled in place.
 
52     Dec 30, 2022 Shock struts Landing Gear 2 $0.00    1   
Installed springs, piston, and snap ring in shock struts. Requires to be fluid filled still.
 
51     Dec 30, 2022 Cargo doors and windows Fuselage 3 $0.00    5   
Trimmed and drilled cargo door skin to frames. Fitted window frame, drilled in place.
 
50     Dec 29, 2022 Cargo door skins Fuselage 4 $0.00    1   
Adjusted and trimmed cargo door skins.
 
49     Dec 29, 2022 Front stab tube covering holes Fuselage 3 $0.00    2   
Fabricated and installed front stab tube fabric inspection holes.
 
48     Dec 28, 2022 Front stab mount holes Fuselage 3 $0.00    0   
Installed fabric covering rings for leading edge stab adjustment.
 
47     Dec 23, 2022 Forward fuel line Fuel System 2.5 $0.00    3   
Routed and bent fuel line on forward door frame
 
46     Dec 17, 2022 Rear fuel lines Fuel System 3 $0.00    12   
Installed rear fuel tank lines down posts and forward to fuel fitting by feet.
 
45     Dec 17, 2022 Cargo door Fuselage 2 $0.00    3   
Installed cargo door frame. Aligned, fit and installed latch mechanism.
 
44     Dec 17, 2022 Trimming alumium Fuselage 2 $0.00    0   
Installed bottom stringers permanently and trimmed around door seals
 
43     Dec 15, 2022 Gussets doors Fuselage 2 $0.00    0   
Installed aluminum gussets inside door frames
 
42     Dec 10, 2022 Static ports Avionics 3 $0.00    3   
Installed static port holders aft of baggage
 
41     Dec 10, 2022 Stringers Fuselage 2.5 $0.00    2   
Installed final underbelly stringers
 
40     Dec 02, 2022 ELT and remote com mount Fuselage 2 $0.00    0   
Fabricated ELT/Remote com mount aft of baggage.
 
39     Dec 01, 2022 Rivnuts finished installed Fuselage 2 $0.00    1   
Rivnuts aft of baggage and other places complete. Installed nut plates for floor board cover below flap handle.
 
38     Dec 01, 2022 Skylights Fuselage 3 $0.00    3   
Installed Skylight framework. Clecoed in place, awaiting riveting. Pieces are primed white.
 
37     Nov 30, 2022 Drilled floor boards Fuselage 4 $0.00    1   
Finished drilling and triming all the floor boards.
 
36     Nov 29, 2022 Floorboards Fuselage 4 $0.00    9   
Drilled holes for front floor boards to mount. Cut hold for fuel valve. Fabricated floorboard below flap handle.
 
35     Nov 29, 2022 Fuel valve and gascolator Fuel System 2 $0.00    1   
Installed plate for fuel and gascolator
 
34     Nov 28, 2022 Fuel valve and gascolator Fuel System 1 $0.00    2   
Coupled Fuel valve and gascolator,, torqued and fabricated cover in floor boards
 
33     Nov 28, 2022 Pulley covers Fuselage 1 $0.00    3   
Fabricated 4 pulley covers
 
32     Nov 28, 2022 Brake reservoirs Fuselage 1 $0.00    1   
Installed A-600 brake reservoirs
 
31     Nov 28, 2022 Nutserts holes Fuselage 4 $0.00    2   
Drilled and filed nutserts (rivnuts) for floor boards
 
30     Nov 19, 2022 Floor Boards Fuselage 3 $0.00    2   
Installed floor boards. Needs slight adjustment.
 
29     Nov 14, 2022 Go no go gauge on Swages Controls 2.0 $0.00    10   
Checked all swages on all flight control cables for proper compression. Heat shrunk over swages.
 
28     Nov 13, 2022 Rudder cables and rudder Controls 5 $0.00    3   
Installed rudder. Installed rudder cables and swadged.
 
27     Nov 03, 2022 Flap pulleys Controls .5 $0.00    1   
Installed 4 flap pulleys
 
26     Nov 03, 2022 Fairleads Controls .5 $0.00    1   
Installed all fuselage fairleads
 
25     Nov 03, 2022 Lower elevator cable Controls 2 $0.00    0   
Replaced lower elevator cable. Installed on belcrank
 
24     Nov 03, 2022 Top Stringers Fuselage 1 $0.00    0   
Clear coated and installed top stringers. Used avex pulled rivets
 
23     Nov 03, 2022 Flap cable and v installed Controls 2 $0.00    2   
Installed flap cable from handle to rear pulley. Painted and installed steel triangle and installed turnbuckles
 
22     Nov 03, 2022 Rudder pedal grip paint Controls 1 $0.00    2   
Painted brake and rudder pedals with grip paint
 
21     Nov 01, 2022 Riveted Stringers Fuselage 2 $0.00    3   
Riveted stringers Right side
 
20     Oct 27, 2022 Stringers primed Fuselage 3 $0.00    5   
Primed stringers where they meet the chromoly tubing to limit galvanic corrosion. Painted stringers where seen in the fuselage.
 
19     Oct 20, 2022 Planned avionics layout Research 1 $0.00    2   
 
18     Oct 20, 2022 Flap handle cleaning Fuselage 1 $0.00    2   
Cleaned inside flap handle to allow piston to move free.
 
17     Oct 18, 2022 Stringers Fuselage 2 $0.00    2   
Cut and bent left and right side stringers
 
16     Oct 18, 2022 Stringers Fuselage 2 $0.00    0   
Cut and bent left and right side stringers
 
15     Oct 17, 2022 Stringers Fuselage 1 $0.00    0   
Drilled holes in mounts on top stringers
 
14     Oct 17, 2022 Pedal springs Fuselage 1 $0.00    1   
Installed new 2.5 inch rudder pedal springs
 
13     Oct 13, 2022 Started installing stringers Fuselage 2 $0.00    0   
Installed top 2 stringers.
 
12     Oct 13, 2022 Elevator cables built Controls 5 $0.00    1   
Installed elevator cables and hardware.
 
11     Oct 12, 2022 Elevator trim Controls 5 $0.00    2   
Swaged cables and installed turnbuckle for elevator trim. Rigged for trim neutral.
 
10     Oct 11, 2022 Shock strut Landing Gear 1 $0.00    2   
Cleaned shock sturt assembly with scotch Brite.
 
9     Oct 11, 2022 Elevator Trim Controls 4.0 $0.00    2   
Installed elevator trim wheel cables and ends.
 
8     Oct 09, 2022 Installed rudder pedals Controls 5 $0.00    1   
Installed rudder pedals and brakes cylinders onto airframe.
 
7     Oct 02, 2022 Stick controls Controls 5 $0.00    4   
Installed stick controls and hardware onto Fuse tabs. Rigged in line with aileron pulleys. Installed elevator bellcrank, push tube and rod end bearings. Requires adjustment.
 
6     Oct 02, 2022 Melted lead in elevators Tail Feathers 2 $0.00    2   
Removed and setup elevators for lead install. Melted lead into leading edge of counter balance. Reinstalled elevators and checked balance. Balance good up to this point.
 
5     Oct 01, 2022 Calculated balance weight Tail Feathers 2 $0.00    2   
Calculated required balance weight for elevators. Fabric/chemicals and too coat with tapes =18.24 oz. Counterbalance weight req Right side 12.75 oz lead, left side 12.55 oz lead.
 
4     Sep 30, 2022 Bearings and straightening elevator tube Tail Feathers 3 $0.00    1   
Installed elevator bearings. Straightened elevator. Researched balance weights. Cut elevator trim tab off.
 
3     Sep 24, 2022 Elevator hinges and tail flying wires Tail Feathers 3 $0.00    3   
Installed elevator center hinge bearings. Installed elevators on the stabs for initial fit. Installed tail wires and adjusted.
 
2     Sep 22, 2022 Elevator Trim Torque Tubes Tail Feathers 2 $0.00    1   
Reamed 1/2 inch bearings to fit elevator trim torque tubes. Drilled to size and clecoed. Temp installed stabs.
 
1     Sep 21, 2022 Installed Fuselage on Rotisserie Workshop 1 $0.00    1   
  ------------ -------------- ------------- Totals618    $0.00    294   




NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.