Project: SteveBRV-14     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
50     Feb 17, 2024 Left Fuel Tank Wings 8 $0.00    0   
49     Feb 16, 2024 Installing Small wing stiffeners Wings 8 $0.00    0   
48     Jan 19, 2024 Avionics Research Avionics 4 $0.00    1   
47     Dec 17, 2023 Prep right wing rear spar Wings 4 $0.00    0   
46     Dec 16, 2023 Right Wing Rivet Ribs to Spar 14-08 Wings 4 $0.00    0   
45     Dec 02, 2023 Prep rear spar and doublers 15-03 Wings 7 $0.00    0   
44     Dec 02, 2023 Elevator completion Tail Feathers 2.7 $0.00    0   
43     Dec 01, 2023 Mounting control arms and riveting Tail Feathers 1.5 $0.00    0   
42     Nov 30, 2023 Riveting Lower Skins Tail Feathers $0.00    0   
41     Nov 29, 2023 Connecting SKins Tail Feathers 3.2 $0.00    0   
40     Nov 28, 2023 Control Ar and weights Tail Feathers 3 $0.00    0   
39     Nov 27, 2023 Skin work Tail Feathers 3 $0.00    0   
38     Nov 26, 2023 Rivet Ribs to left Wing Wings 6 $0.00    0   
37     Nov 25, 2023 Add Rib Bracket and torque tube to left wing Wings 2 $0.00    0   
36     Nov 18, 2023 WIng Bushings 14-04 and 14-05 Wings 3 $0.00    0   
35     Nov 15, 2023 Trim Motor install Tail Feathers 3.5 $0.00    0   
34     Nov 15, 2023 Elevator Spars 09-11. 09-12 Tail Feathers 3.5 $0.00    0   
33     Nov 14, 2023 Section 09-10 Elevator Tip Ribs Tail Feathers 1 $0.00    0   
32     Nov 14, 2023 Section 09-10 Elevator Tip Ribs Tail Feathers $0.00    0   
31     Nov 13, 2023 Section 14-02 1n14-03 Torque Tube Assembly and Flap hinge Wings 6 $0.00    0   
30     Nov 09, 2023 Trim Hindge 9-07 Tail Feathers 2 $0.00    0   
29     Nov 08, 2023 Flanges and Ribs section 9-06 Tail Feathers 1.5 $0.00    0   
28     Nov 07, 2023 Section 9-06 Tail Feathers 1.5 $0.00    0   
27     Nov 06, 2023 Elevator rebuild Tail Feathers 1.5 $120.00    0   
26     Nov 05, 2023 Start Rebuild Elevator Tail Feathers 5 $0.00    0   
25     Nov 04, 2023 Completion of Spars 14-04 and 14-05 Wings 5 $0.00    0   
24     Oct 22, 2023 Starting to assemble flap brakets /. Deburing Wings 2 $0.00    0   
23     Oct 21, 2023 Dubur some more Wings 2 $0.00    0   
22     Oct 18, 2023 Prep many wing part Alodine Wings 2 $350.00    0   
21     Oct 17, 2023 Lights Wings 2 $500.00    0   
20     Oct 14, 2023 deburing wing parts Wings 3 $0.00    0   
19     Oct 10, 2023 Ribs 1 Wings 2.5 $0.00    1   
18     Oct 10, 2023 Prepping Ribs Wings 4 $0.00    1   
17     Oct 03, 2023 Finish Spar 2 Wings 2 $0.00    0   
16     Oct 02, 2023 more nutplates Wings 5 $0.00    1   
15     Oct 01, 2023 Installing the nut plates on the Spar Wings 4 $0.00    3   
14     Sep 30, 2023 Second Spar Drilling Wings 4 $0.00    1   
13     Sep 29, 2023 finish spar 1 Wings 5.45 $0.00    0   
12     Sep 22, 2023 primming multiple wing parts Wings 1.5 $0.00    0   
11     Sep 22, 2023 Continuing to countersink Wings $0.00    1   
10     Sep 20, 2023 Starting to countersink Wings 2 $0.00    1   
9     Sep 19, 2023 Prepping of multiple parts for Primeing Wings 3 $0.00    0   
8     Sep 18, 2023 FInish match drilling of J-Channel Wings 4 $0.00    3   
7     Sep 16, 2023 Section 15 1-5 Match drill J-Channel Wings 3.0 $0.00    1   
6     Aug 30, 2023 Power tools Workshop 4 $2200.00    0   
5     Aug 20, 2023 Built 3 EAA tables Workshop 8 $200.00    0   
4     Aug 11, 2023 Pick up Kit from Houston Research 22 $2500.00    0   
3     Aug 01, 2023 Purchased RV-14 from Bill Whitefield Serialn 141063 Research 3 $0.00    0   
2     Jun 04, 2023 Empennage build 2 Empennage 100 $0.00    0   
1     Jun 03, 2023 Empennage build 1 Empennage 100 $0.00    0   
------------ -------------- -------------
Totals378.35    $5870.00    14   