Project: TerryS   -  
            Listing for Category : Engine
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Terry Shortt   -  
Project:   Vans   -   VIEW REPORTS
Total Hours:3270.7
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 12, 2019 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=TerryS

Home or Last Project Picture

Jul 10, 2023     baffles - (24 hours)       Category: Engine
I want to install a butterfly valve to control airflow to the oil cooler, but the one that I bought way back when from airflow systems has the mounting ears in a really goofy location for what I want to do. Specifically, one of the ears was going to be hanging out into empty space, or I was going to have to move the whole thing in and down about an inch.

In an effort to take advantage of every molecule of cooling air, I wanted to optimize the location, so I cut the flange off, fabricated another so that I could orient the mounting hardware better, and took it over to a friends house for him to tig weld it together.

It came out really nice.

I also discovered that a couple of the worm clamps on the oil return lines were clocked so that they were in the way of teh baffles and/or eventually the baffle tie wires so I spent some time adjusting those. Wish I had known about this before I had all the systems on the engine as it's pretty cramped to get in there with everything installed.

Attis point, the baffles are coming together nicely.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.