Project: BearhawkPatrol   -  
            Listing for Category : Show all entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Bruce Case   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:1383
Start/Last Date:Jul 10, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=BearhawkPatrol

Home or Last Project Picture

Feb 01, 2024     Engine Baffles - (60 hours)       Category: Eng. Baffles
Modify RV Baffles to fit, create custom fiberglass inlet plenums


 
Aug 06, 2023     Carb Airbox - (8 hours)       Category: Airbox
Carb airbox from a Husky


 
Jul 01, 2023     Engine Mount - (80 hours)       Category: Engine Mount
Building new engine mount account AviPro supplied Dynafocal Mount doesn't fit on engine and is a poor design


 
Jul 01, 2023     Engine Cowl - (60 hours)       Category: Engine Cowl
Aluminum Work associated with engine cowl


 
Dec 22, 2022     Avionics and Panel Build - (80 hours)       Category: Avionics
Cut Out Panel,Carbon Fiber Overlay, Lots of wiring


 
Nov 11, 2022     Flap System Install - (40 hours)       Category: Flap System
Hanging flaps and rigging


 
Oct 08, 2022     Instrument Panel Fabrication - (25 hours)       Category: Windshield
Made trail instrument panel from plexiglas to visualize any clearance issues. Remote electronics will be shelf mounted behind panel.


 
Sep 03, 2022     Mounting Windshield - (42 hours)       Category: Windshield
Mounting Windshield, requires fairings at wing and at boot cowl interesection


 
Jan 29, 2022     Various Jobs - (100 hours) Category: Wing-Left
 
Dec 13, 2021     Engine Stuff       Category: Empennage
Engine Related


 
Nov 03, 2021     Wing Tanks and Related - (54 hours)       Category: Wing Tanks
Tanks and fuel bay


 
Nov 03, 2021     Wing Construction       Category: Wing Tanks
Misc tasks associated with wing construction


 
Aug 24, 2021     Flap Pulley Reinforcement - (24 hours)       Category: Flap System
Fuselage flap pulley needs reinforcement to prevent tear out of mounting bolt.


 
Aug 10, 2021     Completing the elevators - (24 hours)       Category: Elevators
I prepped the elevators today for pouring the leading edge weights. First I tacked in .025" steel plates. I brazed around the edge and smoothed them out. I was careful to keep the plates below the level of the tube edges so when the fabric is shrunk it will not contact the plates. Finally I welded in three cross dowels to give the lead an anchor.


 
Apr 01, 2021     Access Panels and Inspection - (20 hours)       Category: Inspection
Creating inspection rings and access panels


 
Mar 23, 2021     Interior Panels and Finish - (80 hours)       Category: Interior Finish
Finished interior with .020 aluminum painted Bearhawk gray. Applied Bearhawk logo to baggage compartment wall. Welded tabs for mounting all panels. Finished throttle cover in .090 thick aluminum, applied stencil.


 
Nov 16, 2020     Custom Pilot Seat, Standard Passenger Seat - (80 hours)       Category: Seating
Creating a new seating arrangement for the pilot to fix the bad ergonomics on the kit design. Carbon fiber bucket will get Oregon Aero cushions. Seat moves easily and also tips up to allow great access for passenger. New, narrower weldment required for pilot seat.


 
Nov 14, 2020     NACA Inlet - (6 hours)       Category: Boot Cowl
Added NACA inlets to boot cowl for human cooling. Fun CNC project.


 
Oct 24, 2020     Finished cutting the landing gear clearance - (5.5 hours)       Category: Landing Gear
Using custom jugs I cut clearance holes for landing gear and CNC'd the mating gasket rings. I will use a thin rubber for the gasket. The parallel handi-lift really works well for lifting the fuselage during work on the landing gear.


 
Oct 16, 2020     Jig to Simulate Landing Gear Stance - (4.2 hours)       Category: Landing Gear
In order to cut the clearance holes in the lower boot cowl for the landing gear it is necessary to simulate the landing gear in the fully compressed and extended positions. This jig allows one to simulate that without physically loading the airplane to maximum gross weight.


 
Oct 14, 2020     Installing Pilot Doors and Right Window - (42 hours)       Category: Door&Window
Decided to make a lockable baggage compartment and to streamline the door latch mechanism as originally designed. Using a nice cam over lock which securely pulls the baggage compartment closed. Pilots door now has a very smooth locking mechanism and nice window latches.


 
Sep 23, 2020     Pulley Guard for Flaps - (6.1 hours)       Category: Flap System
Pulley guard. One piece one each side of pully. Cotter pins through holes for control cable constraint.


 
Sep 23, 2020     New Shop at Airport       Category: New Shop
Purchased hangar at airport for new shop


 
Sep 23, 2020     Pilot and Baggage Door - (28 hours)       Category: Fuselage
Aluminum for pilot and baggage door fitted. Need to add locking mechanisms


 
Aug 01, 2020     Airplane Rotator - (24.2 hours)       Category: Rotisserie
Build a rotisserie which allows for easy access to the airplane while building and covering. Harbor freight engine stands were modified along with a custom indexing system using a agriculture PTO drive and a 40 tooth gear with a spring loaded pin for positive indexing.


 
May 03, 2020     Left Rear D Window Install - (18 hours)       Category: Fuselage
Made the mounting of the D window so it would flush out with the pilot window ahead of it. Final plexiglass and fabric to do before final riveting.


 
Mar 07, 2020     Wedge filler on boot cowl wrap around - (3.0 hours)       Category: Boot Cowl
Small tapered wedge requires on bottom of boot cowl wrap around to tunnel. Only one side required this.


 
Nov 03, 2019     Tunnel and Bottom Boot Cowl - (11 hours)       Category: Tunnel
Bottom tunnel mounting and mating to bottom boot cowl aluminum


 
Oct 10, 2019     Installing Fuel System - (85 hours)       Category: Fuel System
Bearhawk Patrol has front and back fuel feeds from each overhead tank. Used 5000 series aluminum tubing with minimum joints. Gold cube fuel flow transducer installed just before firewall.


 
Oct 10, 2019     Designing and Installing Custom Throttle Quadrant - (43 hours)       Category: Throttle
Designed and built a custom throttle quadrant to solve problem of interference with flap handle.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.