Builder Name:Martin Guinn   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:1990.5
Total Flight Time:36.1
Total Expense:N/A
Start/Last Date:Aug 30, 2019 - Dec 06, 2021
Engine:Lycoming YIO-390-A3B6 Thunderbolt
Propeller:Hartzell
Panel:G3X Touch/GTN 650xi, SteinAir
 
Friendly URL: https://eaabuilderslog.org?s=MartysRV14A

Home or Last Project Picture

Jul 25, 2021     Transport Stabilizers - (2 hours) Category: Fuselage
Transported tail feathers (horiz and vert stab) from hanger back to garage to begin working on fairing.
 
Dec 07, 2020     Baggage Floor - (4 hours)       Category: Fuselage
Completed installation and riveting of the baggage floor.


 
Dec 04, 2020     Insulation - (6 hours)       Category: Fuselage
Started laying down SoundEx insulation on belly under baggage area.


 
Nov 26, 2020     Fuselage Priming - (2 hours)       Category: Fuselage
Sanded and did a final priming on the fuselage interior.


 
Nov 25, 2020     JDAir Canopy Latch - (3 hours)       Category: Fuselage
Installed canopy latch from JDAir using updated installation instructions from Darwin. Installation was straightforward and it looks great.


 
Nov 18, 2020     37.3 Roll Over Structure - (2 hours)       Category: Fuselage
Completed riveting roll over structure to fuselage. Received pitch servo from Stein and installed.


 
Nov 16, 2020     37.2 Roll Over Structure - (10 hours)       Category: Fuselage
Completed assembly of roll over structure over period of several days.


 
Nov 13, 2020     37.1 Roll Over Structure - (3 hours) Category: Fuselage
Prepared and primed roll over structure. Fabricate pitch servo control rod.
 
Nov 12, 2020     Fuselage vents - (6 hours)       Category: Fuselage
Fabricated and primed vents. Primed and installed canopy release mechanism. Top coated bottom of forward top skin with Stewart Systems Drab Tan to assess color.


 
Nov 11, 2020     35.3 Upper FWD Fuselage - (6 hours) Category: Fuselage
Installed forward top skin doublers (35-17), cowl attach hinges (35-18), and riveted and installed forward top skin up to riveting (35-19).
 
Nov 10, 2020     36.4 Fuselage - (3 hours) Category: Fuselage
Installed aft elevator push rod but need to bring horizontal stab back to complete attachment. Returned to 35-11 to complete canopy deck installation.
 
Nov 09, 2020     36.3 Fuselage - (8 hours)       Category: Fuselage
Productive day. Primed aft baggage area that was part of aft fuselage. Used new DeVilbis Dekups system, worked great. Completed 36-06 to 36-14. Assembled elevator bellcrank, installed elevator pushrod, control sticks, control stick pushrod.


 
Nov 07, 2020     36.2 Elevator Pushrods - (4 hours)       Category: Fuselage
Completed installing rod end fittings and adjusting to required length (36-03,04). Installed CS-00001 and bolted to control arm, torqued, and sealed. Prepared parts for priming bell crank and servo support (36-05,06). Confirmed use of Classic Aero floor carpeting/foam for hiding refrigerant lines. Cleaned and taped baggage area in preparation for priming areas of aft fuselage not yet primed.


 
Oct 29, 2020     35.2 Upper Forward Fuselage - (8 hours)       Category: Fuselage
Prepped and primed additional parts. Completed 35.02 through 35.07.


 
Oct 27, 2020     35.1. Upper Fwd Fuselage - (4 hours)       Category: Fuselage
Prepped and primed parts.


 
Oct 25, 2020     33.4 Rudder, Brakes, and Panels - (18 hours)       Category: Fuselage
This entry summarizes work completed during week of 10/18 to 10/25/20.
- Installed rudder pedals and brake lines. Expanded existing holes in main spar and ribs for routing brake lines.
- Prepped and primed baggage floor and side panel sections. Will not rivet to baggage ribs at this time pending coolant hose routing.
- Prepped and primed flap support bracket and related parts.
- Connected rudder cables to rudder pedals and installed guides and clamps.
- Prepared, primed and installed flap control rod.


 
Oct 17, 2020     33.3. Rudder Pedal Assembly - (3 hours)       Category: Fuselage
Complete riveting of brake pads and attached to rudder pedals. Installed Beringer cylinders. Plan to replace the stock pads with custom product which will move hydraulic lines behind rudder pedal.


 
Oct 15, 2020     30.4. Aft Fuse Attachment - (2 hours) Category: Fuselage
Complete other half of bottom skin riveting with Carlos' help
 
Oct 15, 2020     33.1 Rudder Pedals - (2 hours)       Category: Fuselage
Prepped rudder pedals for riveting.


 
Oct 14, 2020     33.2 Brake System - (4 hours) Category: Fuselage
Initial assembly of Beringer brake cylinders and routing of lines. Drilled pass through holes through floor ribs.
 
Oct 13, 2020     31.2. Fuel System - (4 hours) Category: Fuselage
Completed installing fuel lines from Aircraft Specialties and securing to floor ribs using supplied clips. Completed all steps.
 
Oct 12, 2020     30.3. Aft Fuse Attachment - (2 hours) Category: Fuselage
Completed about half of the bottom skin rivets (30-08) with Cate's help
 
Oct 11, 2020     30.2 Aft Fuse Attachment - (8 hours)       Category: Fuselage
Completed pages 30-04 to 30-07. Installed primed aft baggage bulkhead and riveted to upper fuselage.


 
Oct 09, 2020     30.1 Aft Fuselage Attachment - (8 hours)       Category: Fuselage
Attached and clecoed aft fuse to main fuse and mounted for and aft on engine stands. Time includes transporting wings to hanger and returning aft fuse.


 
Oct 07, 2020     31.1 Fuel System - (3 hours) Category: Fuselage
Completed initial fit of Aircraft Specialties sourced pre-fabricated fuel lines and wing-mounted fuel filters. Installation was a snap.
 
Oct 06, 2020     29.6 FWD Mid Fuse...Continued - (8 hours)       Category: Fuselage
Prepared and installed root fairings (29-17,18) and seat back brace (29-19).


 
Oct 04, 2020     29.5 FWD Mid Fuse Continued - (15 hours)       Category: Fuselage
This entry describes work over period of several weeks. Completed 29-14 through 29-16 including fully riveting side skins and structural members.


 
Sep 17, 2020     29.3 FWD Mid Fuse - (10 hours)       Category: Fuselage
Completed riveting of bottom skin (29-04) and fabrication of longerons (29-06, 07). Prepared shims and hinges and fitted to firewall (29-07,08)


 
Sep 12, 2020     29.2 FWD Mid Fuse - (4 hours)       Category: Fuselage
Completed pgs. 29-05. Fabricated and installed control column without need for extra shims. Used safety wire to line-up the washers.


 
Sep 11, 2020     29.1 FWD Mid Fuse - (6 hours)       Category: Fuselage
Completed pgs. 29-02 to -04, but not completing riveting yet. Primed lower drag fitting and gear brace black.


 
Sep 08, 2020     28.3 FWD Fuse Completion - (14 hours)       Category: Fuselage
Back at it after a 3 wk Western hiatus to escape the heat and humidity of the NC summer. Completed pgs. 28-07 through -10 over three days which includes fabrication and priming of the vents and initial installation of the Forward Center Section Bulkhead. Made a mistake installing the right cable bracket since it's not mirror image of the left, but easily fixed it.


 
Aug 16, 2020     28.2 Firewall Assembly to Bottom Skin Assembly - (4 hours)       Category: Fuselage
Completed pgs. 28-05,-06.


 
Aug 14, 2020     28.1 Forward Bottom Skins and Muffler Shroud - (8 hours)       Category: Fuselage
Completed pgs. 28-02,-03, -04.


 
Aug 12, 2020     27.3. Tunnel Installation and Final Assembly - (8 hours)       Category: Fuselage
Completed pgs. 27-06,-07


 
Aug 11, 2020     27.2 Firewall Assembly - (6 hours)       Category: Fuselage
Completed pgs. 27-04,-05


 
Aug 09, 2020     27.1 Firewall Angles - (4 hours)       Category: Fuselage
Prepped and primed parts for firewall angles on pg. 27-02,-03.


 
Aug 08, 2020     Section 26 Completion - (4 hours)       Category: Fuselage
Completed all steps on pg.26-21,-22. Got some help from Cate with riveting.


 
Aug 07, 2020     Step Attach Assembly - (6 hours)       Category: Fuselage
Completed all steps on pg. 26-15,-16,-17,-18,-19-20


 
Aug 05, 2020     Bulkhead to Skin Assembly - (12 hours)       Category: Fuselage
Completed all steps on 26-12,-13,-14.


 
Aug 02, 2020     Rivet Doublers and Stiffeners to Bottom Skin - (4 hours)       Category: Fuselage
Completed all steps on pg. 26-11


 
Jul 25, 2020     Baggage Ribs, Bottom Skin Prep - (15 hours)       Category: Fuselage
Completed all steps on pg. 26-08,-09,-10. Primed all rbis using SEM self-etching primer and bottom skin using Steward Systems product and procedures.


 
Jul 19, 2020     Bulkhead Assembly - (10 hours)       Category: Fuselage
Completed fluting to shape outboard rib flanges and primed. Completed all steps up through 26-07.


 
Jul 12, 2020     Mid-Fuse Lower Structure - (4 hours)       Category: Fuselage
Prepped and primed seat ribs (26-03).


 
Jul 11, 2020     Baggage Ribs - (4 hours) Category: Fuselage
Prepped and primed baggage ribs (26-02)
 
Jul 01, 2020     Forward Mid Fuse Bulkheads - (15 hours)       Category: Fuselage
Completed fabrication of mid fuselage bulkheads, Section 25, Fabricated bearing bracket assembly (25-03). Had to enlarge the countersink on the shop head side to make room for the long 3-7 rivets called out in the plans. Ground down shop head to flush and repainted.


 
Jun 18, 2020     Fuselage Crate Delivery - (2 hours)       Category: Fuselage
Fuselage crate arrived with external damage but no apparent internal damage. Completed inventory and contacted Van's regarding missing parts.


 
Dec 31, 1969     30.1. Aft Fuse Attachment Category: Fuselage
Clecoed aft fuse to main fuse and mounted on engine stands.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.