Project: KMYARV12   -  
            Listing for Category : landing gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Howard Kaney   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:552.8
Total Flight Time:
Start/Last Date:Aug 17, 2020 - Jun 10, 2022
Engine:Rotax 912iS Sport
Panel:Dynon Skyview dual screen
 
Friendly URL: https://eaabuilderslog.org?s=KMYARV12

Home or Last Project Picture

Aug 31, 2021     All of August, A Slow Process - (75 hours)       Category: Landing Gear
Our work is a grinding halt. It took Larry and I (Harsh Patel) 2.5 hours to do 1 step. Which riveting a small wire attack bracket to hold a bunch of wires in. It was in a tough spot and finding the rivet and part itself took most of the time.

A similar story is present for all other sections. Putting the wiring and other small details in takes much more time than anticipated. Furthermore back ordered parts delay certain sections, which delay later sections and the problem expedites itself.

Besides the plane, the group went to the Balloon rally at the Airport, students practiced flying on a flight simulator, and cleaned up the hangar (there was nothing to do because of back ordered parts).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.