Project: mhlRV14A   -  
            Listing for Category : Controls
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Mark Larsen   -  
Project:   Vans - RV-14A
Total Hours:1662.7
Total Flight Time:
Start/Last Date:Sep 21, 2020 - No Finish Date
Engine:Lycoming YIO-390-EXP119 (YENPL-RT2E11172)
 
Friendly URL: https://eaabuilderslog.org?s=mhlRV14A

Home or Last Project Picture

Aug 19, 2023     OP-38-03 - Trim Actuation Assembly - (0.8 hour)       Category: Controls
8/18/23 - 0.1h
8/19/23 - 0.7h
This is a relatively short step in the aileron trim build, starting with final drilling the holes to mount the servo to the bracket built in the previous step. After the holes are drilled, the servo is attached with screws and nuts. The clearance between the nut and servo was too tight for a socket wrench, so I ended up holding the nuts with a needle-nosed pliers while I turned the screws until they were tight. The other prep task in this step is to strip the five 24-gauge wires from the trim servo, which is easy to do since the wires are completely accessible at this point.
[#28 Drill, Screwdriver, Needle-nosed Pliers, Wire Strippers]


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.