Project: msmst25   -  
            Listing for Category : empennage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Matthew McCoy   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:
Total Flight Time:
Start/Last Date:Oct 12, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=msmst25

Home or Last Project Picture

Apr 15, 2021     Fiberglass work on the empennage fairings       Category: Empennage
Continuing fiberglass work on the fairings and attaching fairings. Had to start over after the first attempt. One layer of glass wasn't strong enough to support the structure.


 
Aug 11, 2020     Empennage Attachment       Category: Empennage
Pages 11-4 to 11-8
Attaching horizontal stabilizer. Attaching vertical stabilizer. Assembling pushrod. Attaching rudder.


 
Aug 03, 2020     Tailcone riveting, battery mount assembly       Category: Empennage
Pages 10-23 to 10-24
Continue riveting tailcone skins


 
Aug 02, 2020     Tailcone assembly Category: Empennage
Pages 10-20 to 10-22
Continue riveting skins to tailcone assembly. Attaching aft deck and stops/doublers/angles. Attaching aft top skin and riveting in place.
 
Aug 01, 2020     Tailcone assembly Category: Empennage
Page 10/20
Reassemble tailcone after priming. Rivet skins to bulkheads, frames and stiffeners
 
Jul 30, 2020     Tailcone bulkhead riveting Category: Empennage
Page 10-18 to 10-19
Riveting tailcone bulkheads together.
 
Jul 25, 2020     Tailcone assembly Category: Empennage
Page 10-16 and 10-17
Battery channel prep. Battery/bellcrank mount prep. Elevator bell crank assembly
 
Jul 23, 2020     Tailcone assembly Category: Empennage
Page 10-15 and 10-16
Trim right side skin. Deburr all holes and edges. Dimple bulkhead holes. Countersinking and dimpling longhorns, skins, frames and bulkheads
 
Jul 21, 2020     Tailcone assembly Category: Empennage
Page 10-14
Attach shoulder harness anchors. Drill cover plate.
 
Jul 20, 2020     Aft deck drilling Category: Empennage
Attaching stop/doubler and angles to aft deck and final drilling all holes
 
Jul 19, 2020     Tailcone assembly and skins Category: Empennage
Section 10 Pages 8-12
Fabricate and attach rudder stop brace. Attach tailcone skins to bulkheads and longhorns. Attaching aft deck and horizontal stabilizer attachment angle. Match and final drilling. Attach and final drill top skins.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.