Project: wzemanek   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:William Zemanek   -  
Project:   Moni   -   VIEW REPORTS
Total Hours:101.2
Total Flight Time:
Start/Last Date:Nov 06, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=wzemanek

Home or Last Project Picture

Apr 02, 2024     Learning to rivet - (2.0 hours) Category: Edu/Research
Set some rivets with a rivet squeezer
 
Jul 28, 2023     Primer - (1.0 hour) Category: Tail Feathers
Prepped and primed 7 tail parts.
 
Jul 15, 2023     Cleaning adhesive - (2.0 hours) Category: Gen Construc
Used Goo Gone to remove leftover adhesive on several parts.
 
May 18, 2023     Bulkhead plate - (1.7 hours)       Category: Empennage
Drilled #30 holes in rear bulkhead plate. Clamped rear bulkhead plate to Former F5 and drilled the #30 holes as well as the 3/16” holes.


 
May 17, 2023     Brackets 2 - (.7 hour)       Category: Fuselage
Finished drilling first batch of fuselage brackets.


 
May 16, 2023     Brackets 1 - (11.0 hours) Category: Fuselage
Prepped and drilled 20 fuselage brackets. Still need bending.
 
May 15, 2023     Former F5 - (1.3 hours)       Category: Empennage
Drilled 3/16” holes through Cap Plate, rear stabilizer spar attach brackets and rear bulkhead plate for (6) AN-3A bolts. Drilled 3/16” mounting holes in tail wheel swivel casting and rear bulkhead plate.


 
May 14, 2023     Stabilizer - (.7 hour) Category: Tail Feathers
Bent forward stabilizer attach brackets 15 degrees.
 
May 13, 2023     Tool Organization - (.6 hour)       Category: Tools
Organized solid rivets, clecos, cleco clamps


 
May 01, 2023     Tailcone - (.7 hour)       Category: Tail Feathers
Glued full-size template to .020 material and rough cut it out.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.