EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
PA18
-
Listing for Category : Show all entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (38)
Research
Workshop
- (1)
Empennage
Fuselage
- (3)
Firewall
- (1)
Tail Feathers
Wings
- (14)
Controls
- (1)
Avionics
Lighting
Instrument Panel
- (5)
Landing Gear
- (1)
Engine
- (1)
Propeller
Fuel System
- (1)
Interior Finish
- (2)
Paint / Decals
- (2)
Inspection
Tools
- (2)
Plane parts
- (2)
Wiring
- (1)
Paperwork
- (1)
Builder Name:
Steven Houck
-
Project:
Supercub - Other
-
VIEW REPORTS
Total Hours:
348
Total Flight Time:
Start/Last Date:
Dec 17, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=PA18
Home or Last Project Picture
Apr 19, 2024
New Instrument Panel
- (15 hours)
Category: Instrument Panel
Was unhappy with the look and layout of my first panel. Decided to make another. Much happier with the results.
20240403_202322.jpg
20240405_195608.jpg
20240405_195613.jpg
Apr 03, 2024
FAA Paperwork
- (3 hours)
Category: Paperwork
Submitted 8050-1 & 8050-88 to FAA to get Registration started.
Apr 02, 2024
Laying out wiring
- (15 hours)
Category: Wiring
Received most of my wiring supplies from B&C and Steinair. Starting to lay out wiring and aviation harnesses. Pics to come.
Mar 11, 2024
Instrument Panel
- (5 hours)
Category: Instrument Panel
Got the Instrument Panel back together and complete other than the mixture cable.
20240311_143635.jpg
Mar 11, 2024
Last bit of Instruments installed
- (8 hours)
Category: Instrument Panel
Picked up control cables for front heat, rear heat and card heat. Cut hole for ELT remote. Waiting on mixture cable but cut hole. Had to profile instrument panel for breaker clearance. Was a little too thick to engage threads.
20240310_152530.jpg
20240310_152221.jpg
20240310_152228.jpg
Mar 11, 2024
Fit up landing gear
- (8 hours)
Category: Landing Gear
Got a smoking deal on a lightly used set of Acme Pro shocks. Got the fitted up and rigged. Still need safety cables and fab up a landing light mount.
20240310_203407.jpg
20240310_193351.jpg
20240310_193359.jpg
20240310_203425.jpg
Mar 09, 2024
Cut Polycarbonate for windows
- (15 hours)
Category: Fuselage
Picked up a sheet of .060 polycarbonate for windows. Cut sides for L21 windows, both upper and lower door and full sliding windows. Have dark lexan for upper windows.
20240310_140349.jpg
20240310_140202.jpg
20240310_140231.jpg
20240310_140245.jpg
20240310_140249.jpg
20240310_140304.jpg
Feb 21, 2024
Instrument Panel
- (25 hours)
Category: Instrument Panel
Made a carbon fiber instrument panel. Laid out avionics how I want it and got MGL Avionics ordered.
20240213_155531.jpg
20240213_154600.jpg
20240213_154737.jpg
Feb 05, 2024
Rear seat
- (5 hours)
Category: Interior Finish
Laid out rear seat.
Jan 25, 2024
Fuel lines
- (15 hours)
Category: Fuel System
Ran all my fuel lines. Installed fuel selector switch and fuel flow transducer.
20240213_155531.jpg
20240203_154440.jpg
Jan 15, 2024
Ran cables, installed controls
- (40 hours)
Category: Controls
Got floorboards finished, ran controls and cables.
20240213_155531.jpg
20231018_183558.jpg
20231018_183614.jpg
20231018_190144.jpg
20231118_212754.jpg
20231118_212856.jpg
20231210_170521.jpg
20231210_170537.jpg
20231210_180957.jpg
Oct 18, 2023
Fusealage back from powdercoat
- (20 hours)
Category: Fuselage
Finally got fuselage back from powdercoat. Started installing pulleys, nutplates for floorboards, fabric formers and trim system.
20231018_190722.jpg
20231012_212145.jpg
20231014_190241.jpg
20231014_190402.jpg
20231016_165510.jpg
20231018_183558.jpg
20231018_190122.jpg
Apr 18, 2023
Ordered Engine
Category: Engine
Finally decided on an engine. 12 month lead time.
Steven Houck Low Compression OX370 187HP.pdf
Apr 18, 2023
Bootcowl
- (10 hours)
Category: Firewall
Started fitting up bootcowl. Titanium firewall. Used high temp RTV to seal firewall to boot cowl. Just need to buck rivets to complete.
20230418_152452.jpg
20230418_153054.jpg
20230418_161536.jpg
20230418_161913.jpg
20230418_161918.jpg
Mar 23, 2023
Right Wing
- (20 hours)
Category: Wings
Installed Tank Bay Braces, Fit Fuel tank, riveted in tank cover strips and fitted ailerons on the right wing.
Jan 22, 2023
Aileron assembly
- (25 hours)
Category: Wings
Completed both ailerons. Built a jig to keep them square. Can't have too many clecos when it comes to assembly.
20230122_181423.jpg
20230101_135546.jpg
20230101_142434.jpg
20230121_202842.jpg
20230122_122625.jpg
20230122_180958.jpg
Mar 28, 2022
Wing Cradle
- (8 hours)
Category: Tools
Built a wing cradle out of thin wall 1 1/2" square tubing. Very light and put it on rollers.
20220325_204050.jpg
20220326_153157.jpg
Mar 26, 2022
Ailerons
- (10 hours)
Category: Wings
Built jigs and then built up ailerons for both wings.
20220327_234009.jpg
20220328_132839.jpg
20220328_203309.jpg
20220328_212932.jpg
Mar 23, 2022
Left wing
- (8 hours)
Category: Wings
Installed wires for wingtip led's, tank rib braces and wing tip bow fitted.
803556BE-748C-4D12-A934-FD6FFD5689CF.jpeg
E10B8F20-D916-4A2E-8051-66FDAD72D48A.jpeg
581DD199-4732-4836-BE94-1CB0FECF0B06.jpeg
A9C67A1D-84D4-4DAE-B9AE-F7D6E6F73FEA.jpeg
4DB8108C-9514-4A0C-9B90-517293E77DA9.jpeg
E200613F-0A7D-4E87-AEFF-27EB9E043A70.jpeg
Dec 05, 2021
Trailing edges (left wing)
- (5 hours)
Category: Wings
Trailing edges all done on left wing. Few odds and ends and this wing will be ready for cover.
CCC99BC1-B07C-4748-8D15-4FC580704AF2.jpeg
E80868EF-0DA1-4FB4-A2D5-28D1E45E30B5.jpeg
Dec 04, 2021
Flap & aileron hangers (left wing)
- (3 hours)
Category: Wings
Installed flap and aileron hangers and flap return spring. Laid out trailing edges and started laying out wing bow.
99E5D772-0E46-4031-98D5-ECD3C3BD0279.jpeg
95A7B324-D6F2-40C9-B532-7F9CC904068B.jpeg
493A4D4D-C28F-4000-B942-C8FB6DF73AC4.jpeg
439FE45A-7D4A-49BD-8FE9-A96A4E9E1E66.jpeg
68DCBF7F-4E9A-4C10-A99D-9A61A0E370BF.jpeg
8A4381E5-6CB5-42D5-AE1A-25199A1B1B5F.jpeg
7661FBD8-A25E-4067-93A7-72BAB8C71990.jpeg
FF93C09E-9951-4802-BEF1-F12ED03BC9FB.jpeg
Dec 04, 2021
Left wing leading edges
- (10 hours)
Category: Wings
Built jig to add washout into wings. Used smart level to get 1.2 degrees washout into wings. About half of Piper specs. Installed leading edges on left wing. Also installed Atlee Dodge tie-down brackets.
20211203_164555.jpg
20211202_152228.jpg
20211202_152307.jpg
20211202_153408.jpg
20211202_153438.jpg
20211202_153553.jpg
20211202_153800.jpg
20211203_112125.jpg
20211203_122030.jpg
20211203_163519.jpg
20211204_114813.jpg
Nov 09, 2021
More parts from powdercoating
- (1 hour)
Category: Paint / Decals
Aileron and flap hangars and a few other miscellaneous parts from powdercoating.
64721151-3624-4927-99A9-B23805D05236.jpeg
Nov 08, 2021
Starter button
Category: Instrument Panel
Found a cool Australian company that specializes in custom billet buttons for pretty much any application (Billet Automotive Buttons). They are built very well. Took almost a month to receive it but I am very happy with how it turned out. Wanted to go with button start over key start for a few reasons. Will probably have a hidden master shutoff somewhere for security reasons. The button will light up blue when master switch is turned on.
starter button.jpeg
Nov 07, 2021
Tank straps
- (3 hours)
Category: Wings
Installed tank straps and aileron cable pulley at #3 compression strut. Torque seal on all threads.
85839972-0483-47CA-8F85-A9951B161ECE.jpeg
0107628A-4C1E-464C-B455-E5360EC2DE5D.jpeg
ABF1A612-155A-42CB-936E-E1CDE14EA2C7.jpeg
3F49A040-E030-44E1-9A83-D38E462A7EAF.jpeg
9FDEF175-D49F-461B-9893-8FA2A79D3EC5.jpeg
Nov 06, 2021
Trammel both wings
- (5 hours)
Category: Wings
Trammeled both wings. Took my time and got them laser straight. Borrowed a trammel tool and also ran string on rib seam for visual. String never lies. Set drag wires at 1/4” deflection at 8 lbs pull. Torque seal on jam nuts.
295CF093-4237-47AC-AD1C-BA6ABE75AFCF.jpeg
D4ABC1AF-C1E1-4D68-848E-885FDEB3D5A0.jpeg
71D89257-AE5A-45DA-96DE-546406007EFA.jpeg
37B7D477-F9F9-4FE3-B023-059906BF526B.jpeg
EA89DD12-FBD1-4A4C-A42C-77725FEDA94D.jpeg
F01D4DA3-F489-4A31-AF59-6D4C75E0F5A0.jpeg
DFE54B21-0603-44D7-9499-10B43C21F325.jpeg
Nov 03, 2021
Right Wing
- (7 hours)
Category: Wings
Right wing caught up with left. Installed compression struts, drag wires, ribs drilled and screwed to spar (130 total), torque every bolt and applied torque seal. Trammel both wings is next on the list.
8E0A8786-5FF3-4044-89BA-2C32D0C2172A.jpeg
81C1C574-FC9A-4AFC-AC05-F18F2CBB0EDC.jpeg
90993F39-C5FD-4604-8DBF-1E59320CC22B.jpeg
ED690CC6-817A-431D-8903-628D22E0D37D.jpeg
5767759A-9A91-4C06-B869-E21075D27130.jpeg
E47C2837-C92C-456A-BD73-839CAEB87ABE.jpeg
Oct 31, 2021
Left wing ribs/drag wires
- (6 hours)
Category: Wings
( Left wing) Permanently attached ribs to spars with screws. 130 screws total per wing. Installed tank bay drag tube and all drag wires. Criss/crossed drag wires in each bay. Will trammel wing tomorrow.
(Right wing) Attached flap cable pulls and wing root compression tube.
8107CB1A-F462-4C76-A03B-3779FF621F68.jpeg
F8606F89-0838-4B57-A9FB-63BE6222B7BB.jpeg
8A190421-14FD-47FC-9A55-3B62DEAAD8F7.jpeg
EF13C2DA-9BD3-4A57-B88D-BD51CDDABADF.jpeg
ADCB6CD3-E19B-4B22-A2B6-360909D67E35.jpeg
EA7A8EE0-9668-443A-A26F-A98266430550.jpeg
218CFB4E-6891-4BE0-93CC-AE213BBF8144.jpeg
32899A86-1533-425D-9D79-7632D586AD4F.jpeg
BEB33BC9-FF99-4257-A640-C0A98849C44D.jpeg
C182D7E0-BE94-4025-971B-A2E5223B8107.jpeg
Oct 29, 2021
(Left wing) Torque tubes and fittings
- (8 hours)
Category: Wings
Square and torque tubes and bolts, add torque seal and start permanently attaching ribs to wings
E9EFC5B3-4DFC-4E57-BD63-0855A63C26A6.jpeg
A38BDE5E-B6FF-4C69-AF76-567410287D8C.jpeg
515C2440-1F2C-4743-8D96-0CAF507ACB51.jpeg
7143A945-7613-4A50-A7E8-F3A381910707.jpeg
80A91EA9-A476-47A0-A733-EBF8822A066B.jpeg
090A904A-607F-4878-90BA-5D74CC96172D.jpeg
751DCC66-CBAF-4E16-8244-6A5D0FFD8324.jpeg
Oct 28, 2021
(Left wing) Wing assembly
- (5 hours)
Category: Wings
Started assembling wings
20211028_175715.jpg
20211028_170044.jpg
20211028_175213.jpg
Oct 22, 2021
Parts to Powdercoating
- (1 hour)
Category: Paint / Decals
Took huge pile of bare metal parts to local powdercoat guy. Turned out amazing.
bare metal.jpeg
powdercoat.jpeg
Oct 06, 2021
Sawhorses
- (6 hours)
Category: Workshop
Built sawhorses to assemble wings. Spent extra attention to make them all as uniform as possible. Bought a new miter saw just to build these. Build 6 total.
Sawhorses.jfif
Oct 01, 2021
Wing rib assembly
- (13 hours)
Category: Wings
Got COVID so spent the weekend assembling my wing ribs. 34 ribs total.
Rib assembly.jpeg
ribs 1.jpg
ribs 2.jpeg
ribs 3.jpeg
ribs 4.jpeg
ribs 5.jpeg
Apr 26, 2021
Javron parts
Category: Plane parts
Received all my Javron Parts. Basically everything but fuselage, engine and avionics. Drove to Wasilla to pick it up.
Javron parts.jpeg
Mar 26, 2021
PStol flaps
Category: Plane parts
PStol flaps arrived from Airframes. Very nice work. Will not show them off yet. Will leave them in this nice box until time to fit on wings.
Flaps.jpeg
Dec 06, 2020
Building carbon fiber floorboards
- (15 hours)
Category: Interior Finish
Trying my hand at constructing carbon fiber floorboards. Turned out pretty good. Watched hours of YouTube videos beforehand.
20201003_171335.jpg
20201205_141559.jpg
20201205_142411.jpg
20201205_145955.jpg
20201205_160515.jpg
20201206_145816.jpg
20201206_150021.jpg
Jul 12, 2020
Fuselage rotisserie
- (4 hours)
Category: Tools
Built a simple rotisserie to better access my fuselage for welding.
20200712_112807.jpg
20200712_112824.jpg
20200712_112937.jpg
Jun 02, 2020
PA18 fuselage
- (1 hour)
Category: Fuselage
Picked up a PA18 fuselage for my experimental cub project. Has a couple of bent tubes that will be very easy to replace.
20200602_174151.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.