Project: aweingram   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Andrew Weingram   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:592.7
Total Flight Time:
Start/Last Date:May 01, 2014 - No Finish Date
Engine:Lycoming IO390 EXP 119
Propeller:MT 3 blade
Panel:G3x x2 GTN 750xi G500 G5 VP-Xpro
 
Friendly URL: https://eaabuilderslog.org?s=aweingram

Home or Last Project Picture

Mar 27, 2024     Finish kit payments - (.1 hour) Category: Fuselage
Final paymennt for finish kit
 
Mar 17, 2024     23-08. Torque tube install - (3 hours)       Category: Wings
Installed competed aileron Torque tube sub assemblies in the with wing root bearings...


 
Mar 10, 2024     Aileron Torque tube assemblies page 23-07 - (4 hours) Category: Wings
Page 23-07 left and right side Aileron Torque tube assembly.

First make the precise little wood spacer block. (Oh come on, that could have been something yet sent!) then get the correct length and clocking. Make two mirror images of each other,, Then dissasemble when done, and I forgot to take a pic, so no sexy completed pick before I diassembled.
 
Mar 02, 2024     Aileron Torque tubes - (2 hours)       Category: Instrument Panel
Page 23-06 aileron Torque tubes done, Now to cut the spacer block accurately, (I hate that kind of stuff for some reason, Would be nice if they just gave me a little plastic piece perfectly made....)


 
Feb 05, 2024     Aileron Trim kit - (.1 hour) Category: Instrument Panel
Electric trim
 
Feb 05, 2024     Final check for panel - (.1 hour) Category: Instrument Panel
sent off final check for Avioinics systems LLC
 
Jan 21, 2024     Aileron Pushtubes - (2 hours) Category: Wings
Short 25.25 inch x .5 inch pushrod tubes complete.
I hate them.
 
Jan 14, 2024     23-03 Pushrod tubes - (4 hours) Category: Wings
Pushrod tubes for ailerons competed. Tried out Alodining them instead of priming at the aerospace metals place. A little more expensive than I expected, but make for perfect inside of the tubes for rust proofing purposees.
 
Dec 19, 2023     Sent push rod tubes and ends out to be alodined. - (3 hours) Category: Wings
Took all the aileron pushrod tubes and ends out to be alodined instead of trying to prime the inside of the tubes.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.