EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Summary
Hours
Entries
Expenses
Dtl. Expenses
Flight Time
Viewers
Categories
Project:
aweingram
- Project Summary
- Optional PDF document function
Add entry descriptions
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
# Pictures
138
Mar 27, 2024
Finish kit payments
Fuselage
.1
0
137
Mar 17, 2024
23-08. Torque tube install
Wings
3
1
136
Mar 10, 2024
Aileron Torque tube assemblies page 23-07
Wings
4
0
135
Mar 02, 2024
Aileron Torque tubes
Instrument Panel
2
1
134
Feb 05, 2024
Aileron Trim kit
Instrument Panel
.1
0
133
Feb 05, 2024
Final check for panel
Instrument Panel
.1
0
132
Jan 28, 2024
aileronal bellcrank and pushrods
Wings
6
4
131
Jan 21, 2024
Aileron Pushtubes
Wings
2
0
130
Jan 14, 2024
23-03 Pushrod tubes
Wings
4
0
129
Dec 19, 2023
Sent push rod tubes and ends out to be alodined.
Wings
3
0
128
Dec 19, 2023
Skin finished dimpling.
Wings
1
1
127
Dec 19, 2023
Bad side finished.
Wings
2
1
126
Nov 19, 2023
Finally Back to building. Thanks to John Corneal and Dean Howard
Wings
8
7
125
Nov 08, 2023
Next check for Avionics
Avionics
0.3
0
124
Aug 03, 2023
Flap gap stiffeners in
Wings
6
1
123
Jun 30, 2023
Right wing Wiring
Wings
4
3
122
Jun 23, 2023
Have I been wasting my time polishing?
Research
1
121
Jun 23, 2023
fuel tanks reinstalled. Wiring underway
Wings
6
2
120
Jun 22, 2023
Fuel tank leak checks suck
Wings
10
0
119
Jun 20, 2023
Pressure testing the tanks and Paid for the engine.
Wings
2
1
118
Jun 17, 2023
left wing sending unit prepped
Wings
1
1
117
Jun 12, 2023
Fuel tank sending units
Wings
10
1
116
Jun 09, 2023
bearing flanges and fuel sender wires
Wings
3
2
115
Jun 04, 2023
Finished landing light lenses
Wings
4
2
114
Jun 03, 2023
Finally building again.
Wings
3
1
113
Mar 28, 2023
MT 3 bladed propellor
Propeller
.5
0
112
Mar 24, 2023
Ailerons and Flaps have arriveed
Wings
.5
0
111
Feb 27, 2023
MOVING DELAYS PROJECT
Workshop
5
0
110
Dec 23, 2022
Just noticed the fuel system column, its buried in the fuselage
Fuel System
0
109
Dec 23, 2022
stall warning
Wings
3
2
108
Dec 22, 2022
landing light bays
Wings
2
2
107
Dec 21, 2022
back to work, stall warning cutout...
Wings
1
1
106
Dec 17, 2022
Inventory
Wings
5
0
105
Dec 08, 2022
Wings are here!
Wings
1
4
104
Nov 23, 2022
fuel selector valve finally came and installed
Fuel System
2
103
Nov 23, 2022
call for Delivery
Wings
.5
0
102
Nov 13, 2022
Roll bar created and installed.
Fuselage
10
6
101
Nov 03, 2022
Elevator push rods in.
Fuselage
4
2
100
Nov 03, 2022
Elevator push Rods
Fuselage
12
8
99
Oct 21, 2022
Flap motor and torque tubes...
Fuselage
4
2
98
Oct 17, 2022
Finished the rudder pedals and whatnot
Fuselage
1
97
Oct 14, 2022
pedals in and first test fitting
Fuselage
4
2
96
Oct 13, 2022
Pedals and cylinders installed.
Fuselage
4
2
95
Oct 12, 2022
rudder pedals
Fuselage
9
1
94
Oct 10, 2022
baggage compartment complete
Fuselage
5
6
93
Oct 09, 2022
QB wings on the way
Wings
.5
0
92
Sep 22, 2022
Floor is in, flap motor fairing started
Fuselage
6
5
91
Sep 21, 2022
installing the baggage floor.
Fuselage
6
3
90
Sep 20, 2022
Baggage Floors and flap bushings.
Fuselage
5
4
89
Sep 13, 2022
As flightlines brake and fuel lines
Fuselage
0.4
0
88
Sep 05, 2022
Much progress on the join
Fuselage
8
3
87
Sep 01, 2022
The Big Join is done.
Fuselage
9
4
86
Aug 30, 2022
Baggage bulkheads....
Fuselage
4
2
85
Aug 24, 2022
QB catch up
Fuselage
5
2
84
Aug 23, 2022
Check writing.
Avionics
5
0
83
Aug 11, 2022
Landing gear holes
Fuselage
4
1
82
Aug 11, 2022
Building, and missing parts
Fuselage
4
0
81
Aug 03, 2022
All the small bits are done.
Fuselage
4
0
80
Aug 02, 2022
continuing to inventory
Fuselage
3
1
79
Aug 01, 2022
Back from Oshkosh and builiding again!
Fuselage
6
3
78
Jun 24, 2022
Freight bill paid. QB fuselage finally on the way.
Fuselage
0.4
0
77
May 23, 2022
QB fuselage balance
Fuselage
0.3
0
76
Mar 01, 2022
Deposit for QB WINGS.
Wings
.3
0
75
Feb 26, 2022
Deposit for QB finally taken from Vans.
Fuselage
0.3
0
74
Feb 15, 2022
Engine Deposit
Engine
0.3
0
73
Feb 14, 2022
OUT OF PARTS!~
Empennage
10
3
72
Feb 07, 2022
upper skins going on.
Empennage
10
3
71
Feb 06, 2022
drilled the rudder
Empennage
2
1
70
Feb 01, 2022
Finish Kit ordered.
Firewall
0
69
Jan 31, 2022
A couple of pages knocked out!
Empennage
9
4
68
Jan 29, 2022
Skins done, nutplates in and rudderstops on.
Empennage
7
1
67
Jan 27, 2022
rivet rivet rivet
Empennage
8
3
66
Jan 26, 2022
Last of the bulkeheads inserted and riveting under way!
Empennage
5
2
65
Jan 15, 2022
Left and right sides are on.
Empennage
5
2
64
Jan 13, 2022
Dimples dimples dimples, countersink dimples....
Empennage
9
2
63
Jan 10, 2022
Bottom of empanage in place! Looking like something
Empennage
8
4
62
Jan 08, 2022
more empanage
Empennage
5
2
61
Jan 06, 2022
another sub assembly
Empennage
6
2
60
Dec 27, 2021
Great progress today
Empennage
8
1
59
Dec 13, 2021
Been negligent in record keeping
Empennage
20
2
58
Oct 29, 2021
Chapter 10 now underway.....
Empennage
4
1
57
Oct 29, 2021
Done and stored
Tail Feathers
2
1
56
Sep 17, 2021
Rolling the Elevators
Tail Feathers
8
1
55
Jun 13, 2021
Skins and spars on 2 elevaotrs
Tail Feathers
5
1
54
May 31, 2021
Main Spar in
Tail Feathers
0
53
May 30, 2021
CRAP
Tail Feathers
3
2
52
May 23, 2021
Trim tab and elevators/
Tail Feathers
3
2
51
May 16, 2021
elevators trailing spar and skins.
Tail Feathers
6
1
50
May 15, 2021
elevator horns and tip skins and riveting.
Tail Feathers
10
2
49
May 09, 2021
trim tab
Tail Feathers
3
1
48
May 09, 2021
trim tab
Tail Feathers
2
0
47
May 08, 2021
trim tab
Tail Feathers
2
1
46
May 02, 2021
contersinnk and dimples elevators.
Tail Feathers
4
0
45
May 01, 2021
Dimples dimples.
Tail Feathers
4
0
44
Apr 30, 2021
deburrring.
Tail Feathers
7
0
43
Apr 29, 2021
Elevator assembled completely, and then broken down
Tail Feathers
9
2
42
Apr 27, 2021
all the way through the trim tab hinges
Tail Feathers
4
1
41
Apr 19, 2021
ribs
Tail Feathers
3
1
40
Apr 18, 2021
beginning the elevators
Tail Feathers
2
0
39
Apr 12, 2021
Horizontal stab complete.
Tail Feathers
5
1
38
Apr 11, 2021
almost done with horizontal stab'
Tail Feathers
6
2
37
Apr 10, 2021
finish forward spar Eileen works on her box as well
Tail Feathers
2
2
36
Apr 09, 2021
rivet forward spar to skin
Tail Feathers
03
1
35
Apr 08, 2021
horizontal stab skins
Tail Feathers
5
1
34
Apr 06, 2021
back to riveting
Tail Feathers
5
3
33
Apr 05, 2021
Counter sink countersinnk
Tail Feathers
3
1
32
Apr 04, 2021
dimples and countersinks
Tail Feathers
2
0
31
Apr 04, 2021
dimples and countersinks
Tail Feathers
0
30
Apr 03, 2021
dimples again.
Tail Feathers
6
3
29
Apr 02, 2021
Cradles and ribs
Tail Feathers
5
0
28
Apr 01, 2021
Horizonal stab
Tail Feathers
7
1
27
Mar 31, 2021
RUDDER COMPLETE. All out of phase work done.
Tail Feathers
4
3
26
Mar 30, 2021
Trailing edge riveting
Tail Feathers
2
0
25
Mar 29, 2021
rudder work
Tail Feathers
3
0
24
Mar 28, 2021
Horizontal Stab spars complete
Tail Feathers
5
4
23
Mar 27, 2021
Horizontal spar
Tail Feathers
5
2
22
Mar 26, 2021
horizontal stab
Tail Feathers
3
0
21
Mar 19, 2021
Up and down day
Tail Feathers
6
3
20
Mar 17, 2021
Back to the rudder
Tail Feathers
6
1
19
Mar 16, 2021
deburring
Tail Feathers
5
0
18
Mar 15, 2021
220 + rivets driven
Tail Feathers
7
3
17
Mar 14, 2021
I'm a dimpling fool
Tail Feathers
9
2
16
Mar 13, 2021
Rudder comes together. (for now)
Tail Feathers
8
6
15
Mar 07, 2021
Revisions slow you down.
Tail Feathers
6
1
14
Mar 06, 2021
Rudder skins
Tail Feathers
3
0
13
Mar 04, 2021
Rudder skins
Tail Feathers
3
0
12
Mar 03, 2021
Van's reply on the vertical Stab
Empennage
3
0
11
Mar 02, 2021
An Up and down day on the rudder.
Empennage
6
2
10
Mar 01, 2021
HOORAY BACK IN BUSINESS
Empennage
6
3
9
Mar 01, 2021
padded boards to protect parts
Workshop
1
2
8
Feb 28, 2021
Sheetmetal class complete
Research
8
0
7
Feb 27, 2021
Day 1 of sheet metal class complete
Research
10
1
6
Feb 22, 2021
And now there are Two!
Workshop
3
1
5
Feb 21, 2021
EAA benches continued
Workshop
3
2
4
Feb 20, 2021
EAA 1000 tables need to be built (AGAIN)
Workshop
5
1
3
Feb 19, 2021
update 7 years old manuals
Workshop
1.5
0
2
Feb 16, 2021
Repeat of things done in the past (Sigh)
Workshop
2.5
1
1
Feb 07, 2021
Restarting a long paused project
Workshop
0.1
0
------------
-------------
Totals
592.7
201
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.