Thurs pm 0.3 - Started on left spar. Got the tip extension riveted.
Friday am 0.6 - clamped and drilled lower j channel, match drilled hold down
Friday pm 0.5 - a little countersinking on bottom
Sat am 0.5 - more countersinks
Sat pm 3.5- finished bottom countersinks, tank plates, access plates and spar root plates, cleaned up shop, matched drilled top j-channel
Sun am 1.6 - match drilled bottom right j-channel, final drilled all holes. Countersunk flush holes
Sun pm 1.5 - lots of countersinking, but not quite done.
Same as right side. No photos, just kept my head down and knocked it out. Was able to have more of a production line and minimize number of tool changes and spar flips. Did everything on the bottom and then the top. Didn't quite finish the top countersinks, but made a really big dent in them.
Was going to hold off on redoing the right bottom j-channels that I messed up but got the notice that they shipped from Van's. Only $20 shipping. Proceeded with drilling the right bottom channel using the top left spar for spacing.
Found that I can only countersink 15-16 holes at a time before the compressor kicks. So I divided the spar up into sections to make it a little easier to manage the countersinking and QC.
Between the spar work and the leading edge cradles, it was a lot of airplane work this weekend. And I even went flying.