Project: Q+2   -  
            Listing for Category : firewall
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Michael Dunning   -  
Project:   Quickie - Q2   -   VIEW REPORTS
Total Hours:72.1
Total Flight Time:
Total Expense:$10272.78
Start/Last Date:Feb 21, 2015 - No Finish Date
Engine:Revmaster R2100-D S/N A-2605
Propeller:Cowley 56x45
Panel:Westach
 
Friendly URL: https://eaabuilderslog.org?s=Q+2

Home or Last Project Picture

Mar 13, 2022     Firewall Fuel Penetration - (0.1 hour)       Category: Firewall
Removed a metal plate covering the hole for the fuel line pass through.


 
Feb 18, 2022     Gascolator - (.2 hour)       Category: Firewall
At the recommendation of the builders group and design practice on the Sonex ( https://youtu.be/qaC8NqJ-1fM?t=4310 ), I elected to follow the Q2 plans and remove the gasolator. This is the first step in a complete audit of the fuel system prior to engine installation.


 
Feb 11, 2022     Firewall Measurements - (.3 hour)       Category: Firewall
My firewall measures 22.25 x 36.5 inches from inside the cowl mounting tapes. This is a bit tough to measure since the firewall is recessed a bit at the edges so that the cowling sits flush.

The seat back bulkhead and forward skins under the forward canopy mount measure about 1/2 inch thick. The tailcone skins measure about 7/16 inch thick.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.