Project: Q+2   -  
            Listing for Category : Engine
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Michael Dunning   -  
Project:   Quickie - Q2   -   VIEW REPORTS
Total Hours:72.1
Total Flight Time:
Total Expense:$10272.78
Start/Last Date:Feb 21, 2015 - No Finish Date
Engine:Revmaster R2100-D S/N A-2605
Propeller:Cowley 56x45
Panel:Westach
 
Friendly URL: https://eaabuilderslog.org?s=Q+2

Home or Last Project Picture

Dec 11, 2021     Engine Stand Measurements - (.2 hour)       Category: Engine
Took some measurements to figure out an adapter to get the 3/4 side of the engine case onto my engine stand. The bottom stud hole takes an M10 bolt with 1.5mm thread pitch and needs to be at least 75mm long. The upper mounting hole is 10.8mm diameter, so a 3/8 bolt should work. There is room for a 0.065" wall tube (approx 1/16") to fit before hitting the 4mm tall transmission flange. A stack of washers would work but requires cutting all 6 into a "half-moon" shape to clear.

Recommend both bolts be in the 75-100 mm (3-4") length range.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.