Project: Q+2   -  
            Listing for Category : Engine
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Michael Dunning   -  
Project:   Quickie - Q2   -   VIEW REPORTS
Total Hours:72.1
Total Flight Time:
Total Expense:$10272.78
Start/Last Date:Feb 21, 2015 - No Finish Date
Engine:Revmaster R2100-D S/N A-2605
Propeller:Cowley 56x45
Panel:Westach
 
Friendly URL: https://eaabuilderslog.org?s=Q+2

Home or Last Project Picture

Oct 28, 2022     HVX MODS: Pulling the Plug - (0.4 hour)       Category: Engine
Drilled and tapped my first oil gallery plug. This is the 5mm plug that was pulled to extend the oil gallery. A 4.5 mm wrench fit the tap perfectly so I used a combination of that and a lot of patience...

Some notes:
1) The oil gallery itself almost perfectly fit a 15/64 inch twist bit and not a 1/4 inch. This coincidentally matches in an "A size" bit.
2) A 1/16 NPT tap calls for a pilot hole made by a "D size" bit. I only had 1/4 inch available and decided to use that to a depth of roughly half the pipe plug length.YMMV.
3) An NPT fitting calls for between 1 and 2 turns past finger tight upon installation to seal (in conjunction with some type of thread stealant, my preference being Teflon paste). This plug ended up just about as deep as I wanted to see and has about 1.5 threads still showing at finger tight.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.