Project: BHMcQuinn   -  
            Listing for Category : interior finish
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Travis McQuinn   -  
Project:   Bearhawk 5   -   VIEW REPORTS
Total Hours:334.5
Total Flight Time:
Start/Last Date:Dec 16, 2022 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=BHMcQuinn

Home or Last Project Picture

Apr 22, 2023     More Floorboards - (5 hours)       Category: Interior Finish
Fit EF Floorboards for installed rivnuts
Overlapped CD/DE floorboards

Reinstalled Doors/Windows
Cut Forwards Cargo door to proper size


 
Apr 21, 2023     More Floorboards - (3 hours)       Category: Interior Finish
Installed Rivnuts for DE Floorboards


 
Apr 19, 2023     Floorboards - (3 hours)       Category: Interior Finish
Installed 0.050 angle on edge of CD floor boards for stiffness and prevent stuff from falling in.
Riveted in
Installed Rivnuts and finished floorboards for CD
Drilled DE Floorboards


 
Apr 16, 2023     Floorboards - (7 hours)       Category: Interior Finish
Cut out metal and finished trim to fit between control stick and mounts
added doublers and nut plates
Laid out CD floor boards
drilled and cleco'd in place
started laying out for wire access


 
Apr 15, 2023     Doubler for BC Stn Floorboards - (3 hours)       Category: Interior Finish
Made doubler for BC stn floorboard and installed nut plates


 
Apr 09, 2023     Template for control stick area floorboards - (2 hours)       Category: Interior Finish


 
Apr 07, 2023     Floor Boards and tools - (3 hours)       Category: Interior Finish
Made Fluting tool
Using Rivet nuts and 10-32 machine screws for floor boards
Used Template and drilled holes in all floor board mounting tabs
Installed Rivet nuts in A-B stn floor board and installed screws.


 
Apr 06, 2023     Fuel Selector - (3 hours)       Category: Interior Finish
Cut out fuel selector in BC stn floor board. Re mounted gascolator.


 
Apr 04, 2023     Started Floor Boards - (3 hours)       Category: Interior Finish
Started Floor Boards
A-B and B-C stations
B-C needs trimming for fuel lines and proper fitment.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.