EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
BHMcQuinn
-
Listing for Category : interior finish
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (134)
Research
- (2)
Workshop
- (2)
Empennage
- (38)
Fuselage
- (41)
Firewall
- (5)
Tail Feathers
- (8)
Wings
Controls
- (7)
Avionics
Lighting
Instrument Panel
- (6)
Landing Gear
- (9)
Engine
Propeller
Fuel System
- (5)
Interior Finish
- (9)
Paint / Decals
Inspection
Tools
- (2)
Auto Entry
Builder Name:
Travis McQuinn
-
Project:
Bearhawk 5
-
VIEW REPORTS
Total Hours:
334.5
Total Flight Time:
Start/Last Date:
Dec 16, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=BHMcQuinn
Home or Last Project Picture
Apr 22, 2023
More Floorboards
- (5 hours)
Category: Interior Finish
Fit EF Floorboards for installed rivnuts
Overlapped CD/DE floorboards
Reinstalled Doors/Windows
Cut Forwards Cargo door to proper size
20230422_200649.jpg
20230422_155536.jpg
20230422_155528.jpg
20230422_153714.jpg
20230422_153711.jpg
20230422_153706.jpg
20230422_153703.jpg
Apr 21, 2023
More Floorboards
- (3 hours)
Category: Interior Finish
Installed Rivnuts for DE Floorboards
20230421_192855.jpg
20230421_192858.jpg
Apr 19, 2023
Floorboards
- (3 hours)
Category: Interior Finish
Installed 0.050 angle on edge of CD floor boards for stiffness and prevent stuff from falling in.
Riveted in
Installed Rivnuts and finished floorboards for CD
Drilled DE Floorboards
20230419_170720.jpg
20230419_170726.jpg
20230419_170728.jpg
20230419_170742.jpg
20230419_170745.jpg
20230419_195725.jpg
20230419_201401.jpg
20230421_192855.jpg
Apr 16, 2023
Floorboards
- (7 hours)
Category: Interior Finish
Cut out metal and finished trim to fit between control stick and mounts
added doublers and nut plates
Laid out CD floor boards
drilled and cleco'd in place
started laying out for wire access
20230416_165632.jpg
20230416_165623.jpg
20230416_165618.jpg
20230416_165200.jpg
20230416_165204.jpg
20230416_154539.jpg
20230416_154524.jpg
20230415_201450.jpg
20230415_201454.jpg
Apr 15, 2023
Doubler for BC Stn Floorboards
- (3 hours)
Category: Interior Finish
Made doubler for BC stn floorboard and installed nut plates
20230415_152001.jpg
20230415_152006.jpg
20230415_152013.jpg
20230415_154047.jpg
20230415_154050.jpg
Apr 09, 2023
Template for control stick area floorboards
- (2 hours)
Category: Interior Finish
20230409_200206.jpg
20230409_200237.jpg
Apr 07, 2023
Floor Boards and tools
- (3 hours)
Category: Interior Finish
Made Fluting tool
Using Rivet nuts and 10-32 machine screws for floor boards
Used Template and drilled holes in all floor board mounting tabs
Installed Rivet nuts in A-B stn floor board and installed screws.
20230407_200919.jpg
20230407_200847.jpg
20230407_200928.jpg
Apr 06, 2023
Fuel Selector
- (3 hours)
Category: Interior Finish
Cut out fuel selector in BC stn floor board. Re mounted gascolator.
20230406_160150.jpg
20230406_160158.jpg
Apr 04, 2023
Started Floor Boards
- (3 hours)
Category: Interior Finish
Started Floor Boards
A-B and B-C stations
B-C needs trimming for fuel lines and proper fitment.
20230404_202516.jpg
20230404_202521.jpg
20230404_202525.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.