EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
BHMcQuinn
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (134)
Research
- (2)
Workshop
- (2)
Empennage
- (38)
Fuselage
- (41)
Firewall
- (5)
Tail Feathers
- (8)
Wings
Controls
- (7)
Avionics
Lighting
Instrument Panel
- (6)
Landing Gear
- (9)
Engine
Propeller
Fuel System
- (5)
Interior Finish
- (9)
Paint / Decals
Inspection
Tools
- (2)
Auto Entry
Builder Name:
Travis McQuinn
-
Project:
Bearhawk 5
-
VIEW REPORTS
Total Hours:
334.5
Total Flight Time:
Start/Last Date:
Dec 16, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=BHMcQuinn
Home or Last Project Picture
Apr 14, 2024
Update
- (5 hours)
Category: Research
Doing research on brakes, Seat Pans, Seat covers, Extending rear cargo door for full open and not hitting fabric. Also slowed down due to renovation on house.
Mar 29, 2024
Misc
- (2 hours)
Category: Firewall
Installed rivnuts for firewall
Adjusted instrument panel flange for shop end of rivet
Looking at extending cargo door hinge
Mar 26, 2024
Firewall
- (2 hours)
Category: Firewall
Finished firewall nutplates
Dimpled boot cowling sides and center boot cowling.
20240326_200711.jpg
20240326_191652.jpg
20240326_191647.jpg
Mar 25, 2024
Firewall
- (1 hour)
Category: Firewall
More firewall nutplates. Drill countersink and rivet.
20240325_203135.jpg
Mar 22, 2024
Nutplates
- (2 hours)
Category: Firewall
Dimpled and installed nutplates on right side firewall and boot cowling.
20240322_201553.jpg
20240322_201547.jpg
Mar 20, 2024
Firewall
- (2 hours)
Category: Firewall
Drilled tabs on firewall and through firewall.
Drilled Rt side for dimpling and nutplates.
20240320_200253.jpg
20240320_200249.jpg
20240320_200245.jpg
Mar 17, 2024
Tail
- (5 hours)
Category: Tail Feathers
Reamed more on elevator to bearing mount for full seating
Marked and drilled trim fairlead hole @ stn D
Separated Stn D upper former and cleaned edges
Riveted former and reinstalled
mounting trim tabs and push rods
Ground brass bushing on trim wheel so chain would fit
Routed trim cable from wheel to horn
Swaged ends.
20240317_202543.jpg
20240317_202357.jpg
20240317_202355.jpg
20240317_202353.jpg
20240317_202347.jpg
20240317_150224.jpg
Mar 16, 2024
Tail
- (3 hours)
Category: Tail Feathers
Made cables from bell crank to elevator horn
Started cutting out trim tabs
Ground ends flush
Reamed holes for clevis pins
20240316_204043.jpg
20240316_204041.jpg
20240316_144454.jpg
20240316_144452.jpg
20240316_144446.jpg
20240316_144442.jpg
20240316_144516.mp4
Mar 14, 2024
Tail
- (3 hours)
Category: Tail Feathers
Installed Horizontal stabilizer and elevators.
Set angle of control stick and bell crank for even cable runs
Installed turnbuckles and made 1/4" tube bushings for each
20240314_204628.jpg
20240314_204646.jpg
20240314_204709.jpg
20240314_204712.jpg
Mar 11, 2024
Rudder
- (3 hours)
Category: Tail Feathers
Cut ends off cable
Made second cable
Made adjustments and have full movement at pedal bottom out.
20240311_191410.jpg
20240311_191404.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.