Project: bbellamy   -  
            Listing for Category : Fuselage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1890.7
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Apr 15, 2024     Fuel and Brake Line Brackets, Bleeder, Parts - (5 hours)       Category: Fuselage
Researched options, completed brake bleeder design and ordered parts.

Installed right fuel line from Andair valve through the F-783B R bracket. Determined position for reinforcement bracket and match drilled. Opened up holes in F-783B R bracket as needed. Deburred edges of holes in the R and L brackets and reinforcement plates. Deburred edges of both reinforcement plates. All pictures for this entry are for the right side only.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.