EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
SuperStinker
-
Listing for Category : fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (23)
Research
- (3)
Workshop
- (1)
Empennage
Fuselage
- (17)
Firewall
Tail Feathers
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
- (2)
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
John Conard
-
Project:
Pitts - S1-11B
-
VIEW REPORTS
Total Hours:
82.1
Total Flight Time:
Start/Last Date:
Oct 24, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=SuperStinker
Home or Last Project Picture
Oct 02, 2023
Tack welded top truss
- (13 hours)
Category: Fuselage
Disassembled bottom truss, cleaned mill scale from each joint, and polished for final fit. Adjusted and measured fit and tacked each joint lightly.
IMG_3639.jpg
Apr 03, 2023
Takedown in preparation for lower longeron yacking
Category: Fuselage
Begin to take the fuselage back down, now that fit and jigs have been largely resolved.
4-3-23.jpeg
Apr 03, 2023
New Balancing points
Category: Fuselage
Used new jack stands for balance to begin fuselage truss.
3-20-23.jpeg
Apr 03, 2023
Working with solidworks
- (4.5 hours)
Category: Fuselage
Download and begin translating some brackets into solid works
Mar 12, 2023
New try
- (5 hours)
Category: Fuselage
Begin to fit fuselage, this time upside down to take advantage of the flat top side.
3-12-23 (2).jpeg
3-12-23.jpeg
Feb 04, 2023
Jig attempt
- (6 hours)
Category: Fuselage
Finish fabrication of jig brackets and begin fuselage layout.
2-4-23.jpeg
Feb 03, 2023
Fuselage hoding jigs
- (2.7 hours)
Category: Fuselage
Continue to cut scrap wood and notch for fuselage holding.
Feb 02, 2023
Begin layout
- (3.2 hours)
Category: Fuselage
Begin layout of fuselage tubes and begin fabrication of holding jigs.
2-2-23.jpeg
Dec 25, 2022
Marking table and measuring plans
- (2 hours)
Category: Fuselage
Marked the table and began to plan the fuselage holders.
Dec 25, 2022
Marking table and measuring plans
- (2 hours)
Category: Fuselage
Marked the table and began to plan the fuselage holders.
12-25-22.jpeg
Nov 06, 2022
More fabrication
- (3.3 hours)
Category: Fuselage
New former tabs and beginning to fabricate fuselage reinforcement plates
9ACE3D6A-209F-4A38-8C11-5A74186420E9.jpeg
Nov 01, 2022
Former tabs
- (2.7 hours)
Category: Fuselage
Remake tabs for forners
EEDF419B-D4F6-4A84-84C0-A38A07D09261.jpeg
Oct 31, 2022
More brackets
- (3.4 hours)
Category: Fuselage
Re did the weld bushings, removed CAD plating with HCL final cut on former tabs, laid out more brackets
7F52B02D-95F5-4FD2-80CF-19111AD14F16.jpeg
541DD380-F74C-42B0-B874-836565897B27.jpeg
Oct 30, 2022
Welding tests
- (2.2 hours)
Category: Fuselage
Testing welding setup for fuselage parts
A441861C-9966-4FC2-B744-3EA937AD9934.jpeg
BEF02C30-DC45-4BC7-9589-97E18A3D4C0F.jpeg
Oct 28, 2022
More brackets
- (2.7 hours)
Category: Fuselage
Worked on brackets
B6B2C051-0062-4417-955B-97F2C5DB8C55.jpeg
Oct 27, 2022
Making tabs
- (3.2 hours)
Category: Fuselage
There are about a million tabs to make and I am relearning how to lay out parts.
215FC3E3-63BC-40C8-85C1-4EEEC0A88DA1.jpeg
93C74A5A-7E70-4FA8-ADBE-DB6E8379DE43.jpeg
Oct 25, 2022
Belt hanger fabrication
- (1.2 hours)
Category: Fuselage
96F3D3F2-4C21-48FD-8697-8233BC9D971E.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.