EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
gzerbe
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (19)
Research
- (1)
Workshop
Empennage
Fuselage
- (11)
Firewall
Tail Feathers
- (2)
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
- (4)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Windshield
- (1)
Builder Name:
Grant Zerbe
-
Project:
Sw51
-
VIEW REPORTS
Total Hours:
240
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Jan 27, 2023 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=gzerbe
Home or Last Project Picture
Feb 16, 2024
Install brake lines
- (10 hours)
Category: Fuselage
It and route and secure brake lines from wheels to cockpit.
IMG_0229.jpeg
IMG_0228.jpeg
Feb 14, 2024
Canopy construction
- (10 hours)
Category: Fuselage
Trim canopy to fit bottom fixture, set and glue. Set for 24hours, then set outside shell onto canopy glass, set and glue.
IMG_0226.jpeg
IMG_0225.jpeg
IMG_0220.jpeg
IMG_0219.jpeg
IMG_0218.jpeg
Feb 05, 2024
Gear motor and springs installation
- (20 hours)
Category: Fuselage
Installed emergency gear release cable to springs, wond springs, and installed electric gear motors.
IMG_4893.jpeg
IMG_4894.jpeg
IMG_4896.jpeg
Feb 01, 2024
Belly cover and side covers
- (20 hours)
Category: Fuselage
Mounted lower belly cover, and placed rivnuts in fuselage for attaching. The mounted side covers over bolts attaching center wing to fuselage.
IMG_0192.jpeg
IMG_0193.jpeg
IMG_0194.jpeg
IMG_0189.jpeg
IMG_0190.jpeg
Jan 29, 2024
Air vents
- (8 hours)
Category: Fuselage
Cut openings in fuselage for air vents. Installed vents
IMG_0184.jpeg
IMG_0185.jpeg
IMG_0186.jpeg
IMG_0187.jpeg
IMG_0188.jpeg
Jan 22, 2024
Gas caps
- (2 hours)
Category: Fuselage
Mounted gas caps
IMG_0175.jpeg
IMG_0174.jpeg
IMG_0173.jpeg
Jan 16, 2024
Horizontal stabilizer instillation
- (5 hours)
Category: Fuselage
Mounting horizontal elevator, connecting elevator and installing elevator push rods to controls.
IMG_0143.jpeg
IMG_0150.jpeg
IMG_0154.jpeg
IMG_0153.jpeg
IMG_0155.jpeg
Jan 16, 2024
Rudder pedals
- (10 hours)
Category: Fuselage
Mounted front and rear rudder pedals along with cables
IMG_5366.jpeg
IMG_5099.jpeg
IMG_0143.jpeg
IMG_0152.jpeg
IMG_0146.jpeg
Jan 09, 2024
Cooler brackets
- (5 hours)
Category: Fuselage
Mounted cooler brackets
IMG_0140.jpeg
Jan 09, 2024
Mounted seat rails
- (10 hours)
Category: Fuselage
Mounted seat rails
IMG_0139.jpeg
IMG_0138.jpeg
IMG_0137.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.