Project: gzerbe   -  
            Listing for Category : Show all entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Grant Zerbe   -  
Project:   Sw51   -   VIEW REPORTS
Total Hours:240
Total Flight Time:
Total Expense:N/A
Start/Last Date:Jan 27, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=gzerbe

Home or Last Project Picture

Feb 16, 2024     Install brake lines - (10 hours)       Category: Fuselage
It and route and secure brake lines from wheels to cockpit.


 
Feb 14, 2024     Canopy construction - (10 hours)       Category: Fuselage
Trim canopy to fit bottom fixture, set and glue. Set for 24hours, then set outside shell onto canopy glass, set and glue.


 
Feb 05, 2024     Gear motor and springs installation - (20 hours)       Category: Fuselage
Installed emergency gear release cable to springs, wond springs, and installed electric gear motors.


 
Feb 01, 2024     Belly cover and side covers - (20 hours)       Category: Fuselage
Mounted lower belly cover, and placed rivnuts in fuselage for attaching. The mounted side covers over bolts attaching center wing to fuselage.


 
Jan 29, 2024     Air vents - (8 hours)       Category: Fuselage
Cut openings in fuselage for air vents. Installed vents


 
Jan 22, 2024     Gas caps - (2 hours)       Category: Fuselage
Mounted gas caps


 
Jan 16, 2024     Horizontal stabilizer instillation - (5 hours)       Category: Fuselage
Mounting horizontal elevator, connecting elevator and installing elevator push rods to controls.


 
Jan 16, 2024     Rudder pedals - (10 hours)       Category: Fuselage
Mounted front and rear rudder pedals along with cables


 
Jan 09, 2024     Cooler brackets - (5 hours)       Category: Fuselage
Mounted cooler brackets


 
Jan 09, 2024     Mounted seat rails - (10 hours)       Category: Fuselage
Mounted seat rails


 
Jan 09, 2024     Mount fuselage on center wing - (10 hours) Category: Fuselage
Mount fuselage on center wings with bolts and torqued to specs
 
Jan 09, 2024     Mounted wheels and brakes - (10 hours)       Category: Landing Gear


 
Jan 05, 2024     Windshield instulation - (20 hours)       Category: Windshield
Drilled holes for windshield, countersunk screw holes, cutout inside panels out to fit. Mounted windshield with clear silicone and bolts and nuts.


 
Dec 22, 2023     Wheels - (10 hours) Category: Landing Gear
Mounted axle, brakes, and wheels and tires. Torqued nuts.
 
Dec 09, 2023     Installed landing gear - (30 hours)       Category: Landing Gear
Mounted landing gear in center wing, torqued bolts and nuts and safety wired bolts.


 
Dec 06, 2023     Pin update on landing gear - (10 hours)       Category: Landing Gear
Changed out pins and bearings on front side of landing gear.


 
Nov 13, 2023     Elevator trim - (10 hours)       Category: Tail Feathers
Mounted hinge on elevator trim tab, then mounted ray allen electric actuator on elevator. Tested with 9v battery for equal distance travel.


 
Nov 11, 2023     Mounting electric trim actuator - (20 hours)       Category: Tail Feathers
Mounted hinge on rudder trim. Cut slot for trim rod. Mounted ray allen electric actuator. Tested with 9v battery for moment.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.