EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N808Brents
-
Listing for Category : Show all entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (8)
Research
Workshop
Empennage
Fuselage
Firewall
Tail Feathers
Wings
- (5)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (2)
Catch Up
- (1)
Builder Name:
Robert Brents
-
Project:
Vans - RV-8
-
VIEW REPORTS
Total Hours:
15.2
Total Flight Time:
Start/Last Date:
May 02, 2015 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=N808Brents
Home or Last Project Picture
May 26, 2023
Riveted the Left wing top skin
- (3 hours)
Category: Wings
Got the left wing top skin riveted on last night.
Left wing bucking
Left wing riveting
Right wing in cradle
Both wings in cradle
Both wings in cradle (2)
Wing fixture removed
Last shot of the night
May 21, 2023
Close in pop rivet tool
- (.5 hour)
Category: Tools
Saw this tool on VansAirForce and thought it might be useful so I made one. Angle is 22.5 degrees.
IMG_5487.jpeg
IMG_5486.jpeg
May 16, 2023
Wing cart and work surface
Category: Tools
This is the wing cart that I made out of the packaging the wing kit came in and it also doubles as a work surface
image.jpg
May 16, 2023
Right wing top skins riveted
- (3 hours)
Category: Wings
With the help of a couple of friends got the top skins of the right wing riveted.
image.jpg
May 11, 2023
Tanks installed - Ready to rivet top skins
- (2 hours)
Category: Wings
image.jpg
May 09, 2023
Tanks: Access Panel and Fuel Sender Installation
- (3 hours)
Category: Wings
Finished up the tanks by installing the access covers and the fuel senders.
Fuel Sender Left Tank
Left Tank Access Panel
Right Tank Access Panel and Sender
May 02, 2023
Tank Work
- (3 hours)
Category: Wings
Some images of tank work
IMG_5451.jpeg
IMG_5446.jpeg
IMG_5443.jpeg
IMG_5438.jpeg
IMG_5436.jpeg
IMG_5435.jpeg
May 02, 2023
What I've done so far
- (0.7 hour)
Category: Catch Up
This entry is a photo record of images taken since I started building. I've finished the empennage (except for fiberglass) and I've just finished the fuel tanks. Ready to start riveting the top skins.
Ailerons_20181009-1.jpg
Ailerons_20181009-2.jpg
Ailerons_20181009-3.jpg
Ailerons_20181009-4.jpg
Ailerons_20181009-5.jpg
Ailerons_20181009-6.jpeg
Airplane Factory .jpg
Elevators.jpg
Flaps_20181031-1.jpg
Flaps_20181031-2.jpg
Flaps_20181031-3.jpg
IMG_1057.jpg
IMG_1058.jpg
IMG_1059.jpg
IMG_1060.jpg
IMG_1106.jpg
IMG_1109.jpg
IMG_1168.jpg
IMG_1170.jpg
IMG_2312.jpg
IMG_2313.jpg
IMG_2318.jpg
IMG_2787.jpg
IMG_2859.jpg
IMG_3281.jpg
IMG_3318.jpg
LeadingEdges.jpg
LeadingEdges_20190101-1.jpeg
LeadingEdges_20190101-2.jpeg
LeadingEdges_20190101-3.jpeg.jpg
LeadingEdges_20190101-4.jpg
LeadingEdges_20190101-5.jpg
LeadingEdges_20190101-6.jpg
Rudder.jpg
Tank Drain.jpg
Tank Drain_2.jpg
Tank Fuel Filler-1.jpg
Tank Fuel Filler-2.jpg
Tank Stiffeners-1.jpg
Tank Stiffeners-2.jpg
Tank Stiffeners-3.jpg
Tank Stiffeners-4.jpg
Tank Stiffeners-5.jpg
Tank Stiffeners-6.jpg
Tank Stiffeners-7.jpg
Tanks and Ailerons.jpg
Tanks_20181001.jpg
Tanks_20181119-1.jpg
Tanks_20181119-2.jpg
Tanks_ProSeal.jpg
Tanks_inboard rib.jpg
Wing Skins.jpg
Wing kit.jpg
custom tool_form.jpg
custom tool_form_in use.jpg
custom tool_form_in use_2.jpg
custom tool_form_in use_3.jpg
custom tool_form_in use_4.jpg
custom tool_wrench.jpg
hinge_bearing_wrench_assembled.jpg
hinge_bearing_wrench_dis-assembled.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.