Project: OneX-Hudson   -  
            Listing for Category : empennage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Johan Nielsen   -  
Project:   Sonex - OneX   -   VIEW REPORTS
Total Hours:143.1
Total Flight Time:
Start/Last Date:Aug 04, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=OneX-Hudson

Home or Last Project Picture

Sep 18, 2023     Horizontal Stabilizer 95% Done - (13 hours)       Category: Empennage
Fiberglass stabilizer tips were a little tricky. Getting leading edge ribs aligned required final assembly to be done in a certain order.


 
Sep 06, 2023     Left and right elevator subassemblies - (6 hours)       Category: Empennage
The ONX-T05-04 and the ONX-T05-03 ribs were miss-labeled. The O3s should have been the 04s and the O4s should have been the O3s to match the prints. The elevator drive assembly is still on backorder.


 
Sep 03, 2023     Vertical Stabilizer and rudder subassembly complete - (8 hours)       Category: Empennage
Fitting the fiberglass vertical stabilizer tip was a challenge as it is identical to the horizontal stabilizer tips.


 
Sep 03, 2023     Vertical Stabilizer final assembly       Category: Empennage
Deburred vertical stabilizer skeleton.


 
Aug 27, 2023     Rudder Assembly starts - (3.5 hours)       Category: Empennage
The rib attached to rudder horn is slightly smaller than the drawing indicates. I had to adjust it one rivet.


 
Aug 02, 2023     Rear Stabilizer Spar - (2 hours)       Category: Empennage


 
Aug 01, 2023     Vertical Stabilizer Assembly - (4 hours)       Category: Empennage
Watched YouTube videos on Jon Croke's channel - which resulted in me buying his DVD set on building a OneX.


 