EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
carlocilliers
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (75)
Research
Workshop
Empennage
Fuselage
- (2)
-
Steel brackets
-
misc brackets
Firewall
Tail Feathers
Wings
- (70)
-
tank ribs
-
rib drilling
-
fuel tank ribs
-
false spar brackets
-
tank ribs
-
rib dry fitment
-
spar setup
-
rib attachment
-
ribs
-
spar leveling
-
ribs
-
ribs
-
spars
-
spars
-
spars
-
spars
-
spars
-
spars
-
spars
-
spars
-
main spar
-
rear spar
-
rear spars
-
Rear Spars
-
rear spar
-
rear spar
-
ailerons
-
aileron
-
flaps
-
flaps
-
flaps
-
flaps
-
flaps
-
flaps
-
ailerons
-
ailerons
-
ailerons
-
flaps
-
aileron
-
flaps riveting
-
ailerons and flaps
-
ailerons
-
ailerons
-
aileron gussets
-
aileron nose skin
-
spars
-
cap strips
-
aileron ribs
-
ailerons
-
spar webs
-
spar webs
-
Spar webs
-
center ribs
-
priming
-
hinge fittings
-
wing root and spar...
-
hinge fittings
-
hinge brackets
-
root rib doublers...
-
priming
-
rib stiffeners
-
hammer forming
-
hammer forming
-
hydroforming
-
flap and aileron ribs
-
center rib routing
-
rib routing
-
wing spacers
-
wing fittings
-
spar fittings
Controls
- (2)
-
torque tube
-
flap quadrant
Avionics
Lighting
Instrument Panel
Landing Gear
- (1)
-
brake caliper flange
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
carlo cilliers
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
376.8
Total Flight Time:
Total Expense:
$1899.67
Start/Last Date:
Sep 17, 2023 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=carlocilliers
Home or Last Project Picture
Mar 18, 2024
torque tube
- (1.5 hours)
Category: Controls
machined rear slot in stick torque tube
Mar 17, 2024
tank ribs
- (45 hours)
Category: Wings
drilled and riveted fuel tank support ribs
Mar 16, 2024
rib drilling
- (2 hours)
Category: Wings
drilled center ribs to spars
Mar 14, 2024
fuel tank ribs
- (4 hours)
Category: Wings
drilled and riveted fuel tank ribs and false spar
Mar 13, 2024
brake caliper flange
- (3 hours)
Category: Landing Gear
turned and welded flanges for caliper attachment
Mar 13, 2024
false spar brackets
- (2.5 hours)
Category: Wings
prosealed and riveted false spar rib attach brackets
Mar 13, 2024
tank ribs
- (3.5 hours)
Category: Wings
drilled fuel tank end ribs to spars and tank spar
Mar 11, 2024
rib dry fitment
- (3 hours)
Category: Wings
dry fitted outboard ribs to spars
Mar 10, 2024
spar setup
- (3.5 hours)
Category: Wings
moved rh wing to airport. setup and leveled spars in wing jig for rib installation.
Feb 28, 2024
rib attachment
- (4 hours)
Category: Wings
Drilled Rib T/E to rear spar
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.