Project: RansS20.5RP     -     Entry

Dec 25, 2021 Control Stick Category: Fuselage
Assembled control sticks per the drawings. Started fabrication of seats.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.