EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RansS20.5RP
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (471)
Research
- (6)
Workshop
- (1)
Empennage
Fuselage
- (191)
Firewall
- (8)
Tail Feathers
- (9)
Wings
- (109)
Controls
- (2)
Avionics
- (57)
Lighting
Instrument Panel
- (23)
Landing Gear
- (1)
Engine
- (48)
Propeller
Fuel System
- (1)
Interior Finish
- (8)
Paint / Decals
- (7)
Inspection
Tools
Builder Name:
Paul Lutz
-
Project:
Rans S-20.5 Raven
-
VIEW REPORTS
Total Hours:
20.45
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Jul 11, 2021 - No Finish Date
Engine:
Lycoming O235
Propeller:
Catto
Friendly URL:
https://eaabuilderslog.org?s=RansS20.5RP
Home or Last Project Picture
Apr 21, 2024
Mount
Category: Engine
Finished tack welding engine mount. Removed from jig and test fit to firewall and engine. Fits good. Replaced in the jig
Apr 20, 2024
Mount
Category: Engine
Tack welded tubes at the firewall side
Mount
Apr 17, 2024
Mount
Category: Firewall
Drilled new holes in mount plate due to the threaded rod being in the way of the tubing. Reassembled jig with 1 degree right offset. Started to place tubes into position
Apr 15, 2024
Mount
Category: Firewall
Removed engine from firewall. Removed u-brackets from mount and secured to engine mount jig.
Apr 14, 2024
Mount
Category: Firewall
Verified dimensions of firewall holes. Drilled mount. Marked location of engine mount plate on jig and drilled thru plate onto firewall plate. The engine plate is offset to the left due to the 1 degree right thrust
Apr 12, 2024
Jig
- (0.5 hour)
Category: Engine
Cut 3/4" plywood for base of engine mount jig. Tubing kit from VR3 arrived
Apr 10, 2024
Mount
Category: Engine
VR3 shipped engine mount kit
Mar 28, 2024
Lugs
Category: Engine
Pressed out prop lugs and reinstalled in outside pattern to match prop hub
Mar 25, 2024
Fittings
- (1 hour)
Category: Firewall
Drilled out bulkhead eyeball pass thru fitting to fit mixture and throttle cables. Installed fittings. Emailed VR3 engine mount drawing with new dimensions.
Mar 18, 2024
Cable
- (1 hour)
Category: Instrument Panel
Installed the mixture, throttle, and carb heat cables. Labeled carb heat. Still need to install cables in firewall pass thru bulkhead
IMG_1370.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.