Project: RansS20.5RP   -  
            Listing for Category : Show all entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Paul Lutz   -  
Project:   Rans S-20.5 Raven   -   VIEW REPORTS
Total Hours:23.7
Total Flight Time:
Total Expense:N/A
Start/Last Date:Jul 11, 2021 - No Finish Date
Engine:Lycoming O235
Propeller:Catto
 
Friendly URL: https://eaabuilderslog.org?s=RansS20.5RP

Home or Last Project Picture

May 03, 2024     Misc - (0.5 hour) Category: Firewall
Installed insulated boots to positive side of battery connectors at battery, master and starter relays. Secured cable on arm of cabin air box. Filed a bevel to right door handle contactor plate to let the locking mechanism sllide over the fuselage tubing easier.
 
Apr 24, 2024     Mount Category: Engine
Dropped off mount at weders
 
Apr 21, 2024     Mount - (1 hour) Category: Engine
Finished tack welding engine mount. Removed from jig and test fit to firewall and engine. Fits good. Replaced in the jig
 
Apr 20, 2024     Mount - (1 hour)       Category: Engine
Tack welded tubes at the firewall side


 
Apr 17, 2024     Mount Category: Firewall
Drilled new holes in mount plate due to the threaded rod being in the way of the tubing. Reassembled jig with 1 degree right offset. Started to place tubes into position
 
Apr 15, 2024     Mount - (0.75 hour) Category: Firewall
Removed engine from firewall. Removed u-brackets from mount and secured to engine mount jig.
 
Apr 14, 2024     Mount Category: Firewall
Verified dimensions of firewall holes. Drilled mount. Marked location of engine mount plate on jig and drilled thru plate onto firewall plate. The engine plate is offset to the left due to the 1 degree right thrust
 
Apr 12, 2024     Jig - (0.5 hour) Category: Engine
Cut 3/4" plywood for base of engine mount jig. Tubing kit from VR3 arrived
 
Apr 10, 2024     Mount Category: Engine
VR3 shipped engine mount kit
 
Mar 28, 2024     Lugs Category: Engine
Pressed out prop lugs and reinstalled in outside pattern to match prop hub
 
Mar 25, 2024     Fittings - (1 hour) Category: Firewall
Drilled out bulkhead eyeball pass thru fitting to fit mixture and throttle cables. Installed fittings. Emailed VR3 engine mount drawing with new dimensions.
 
Mar 18, 2024     Cable - (1 hour)       Category: Instrument Panel
Installed the mixture, throttle, and carb heat cables. Labeled carb heat. Still need to install cables in firewall pass thru bulkhead


 
Mar 15, 2024     Seats       Category: Interior Finish
Located, drilled, and riveted seat frame sliders in place.


 
Mar 09, 2024     Hoses - (1.25 hours)       Category: Fuel System
Made hoses that go from header tank to fuel pump and pump to fuel selector. Using PTFE braided hose.


 
Mar 07, 2024     Mount Category: Engine
Measured Randy's engine with our spinner backplate in place. Determined our engine is 3 3/16” low. Will need to call VR3 and have thrustline changed and new tubing cut.
 
Mar 03, 2024     Mount Category: Engine
Mount thrustline is wrong. Engine is sitting too low. Will remeasure to verify
 
Feb 29, 2024     Mount - (2 hours)       Category: Engine
Installed mount to engine. Put dielectric grease on bushings to eliminated friction for torque. Torqued bolts to 40 inch lbs. per lycoming manual. Installed engine to fuselage and torqued fuselage bolts.


 
Feb 28, 2024     Mount Category: Engine
Initial install of engine mount to engine. Torqued to 40 in lbs and measured the distance between rubber bushings for spec of 1.80”. Removing mount tomorrow and putting dielectric grease on bushing to let them slide in mount easier. Hopefully this will allow rubber bushings to seat better in the engine mount.
 
Feb 26, 2024     Mount Category: Engine
Picked up Mount from the powder coater. Reamed all holes to remove powder coat for clearance for bolts
 
Feb 23, 2024     Fairing       Category: Engine
Fabricated air exit fairing to smooth transiting out of cowl. Used slip rollers to form. Drilled to lower flange of firewall. Took engine mount to powder coater.


 
Feb 23, 2024     Mount Category: Engine
Dropped mount off at powder coater
 
Feb 22, 2024     Exhaust       Category: Engine
Fit engine mount to airframe and engine to verify fit. Welded on washers where mount bolts to engine. Practiced rolling pieces for air exit transition fairing on firewall to smooth out airflow coming out of the cowl.


 
Feb 21, 2024     Mount Category: Engine
Picked up the engine mount from the welder
 
Feb 18, 2024     Alternator       Category: Engine
Installed alternator mount to crankcase. lol Removed crankcase bolts and replaced with 1/4” longer lycoming bolts. Torqued to spec. Needed to make a bushing to install in alternator mount where alternator mounts. Alternator uses 5/16” bolt and mount had 3/8” hole. Made bushing from aluminum stock and turned at Dave's on lathe to fit mount.


 
Feb 05, 2024     Probes Category: Engine
Installed the CHT probe receptacles into the engine. Installed the oil and fuel pressure sensors onto Vans manifold.
 
Feb 02, 2024     Doors Category: Fuselage
Dad continues his never ending forward door fairing install. Fabricated 3rd attempt on right door. Made fairing for left door transition
 
Jan 31, 2024     Misc Category: Engine
Researched what bolts/screws to use for installing alternator and starter. Ordered alternator nippo denso 14184 and alternator.
 
Jan 21, 2024     Console       Category: Interior Finish
Located and drilled console to existing holes in interior mount. Wrapped console in fabric that we used on glare shield. Installed usb charger in console.


 
Dec 29, 2023     Mount       Category: Engine
Finished tack welding engine mount. Test fit to engine


 
Dec 28, 2023     Mount Category: Firewall
Tack welded a few more tubes in place
 
Dec 27, 2023     Mount       Category: Fuselage
Readjusted engine mount jig. Trial fit tubing and it fits better. Ready to tack weld upper tubes


 
Dec 22, 2023     Armrest       Category: Fuselage
Removed armrest from mold. Test fit. Need to make a few adjustments for final fit


 
Dec 21, 2023     Mount Category: Engine
Finished track welding mount. Test got to engine and fuselage.
 
Dec 20, 2023     Mount       Category: Engine
Track welded mount


 
Dec 19, 2023     Armrest       Category: Fuselage
Used duct tape on mold for releasing fiberglass. Fiberglassed armrest


 
Dec 18, 2023     Mount Category: Engine
Assembled tubing into engine mount jig. Made adjustments to jig to get tubing aligned
 
Dec 17, 2023     Armrest Category: Fuselage
Made mold for center console and armrest.
 
Dec 14, 2023     Mount Category: Engine
Receive engine mount tubing from VR3
 
Dec 05, 2023     Inlet ramps       Category: Engine
Used roller to put curves into inlet ramp. Cut from 0.020” aluminum. Aligned and drilled to cowl inlet. Will glue to cowl when verify clears all engine components


 
Nov 18, 2023     VR3 Category: Paint / Decals
Verified in engine mount drawing from VR3. Supplied them with dimensions and they put these into CAD to draw an inch mount. They will match the tubing and make a tubing kit that we will weld.
 
Nov 06, 2023     Panel Labels       Category: Paint / Decals
Used decal paper to make labels for panel. Installed labels on panel


 
Oct 27, 2023     Mount Category: Engine
Continue to cut tubing and determine how to fish mouth the tubes for good fit. Trying to determine the angle tube intersecting and how the fish mouth should be cut
 
Oct 22, 2023     Mount       Category: Engine
Cut tubes for left side of engine mount.


 
Oct 21, 2023     Mount Category: Engine
Started cutting tubes for engine mount
 
Oct 20, 2023     Practice Category: Engine
Continue to practice cutting pvc for mount. Used a computer program to get the cut outline for the tubing. You enter the tubing specs and angle and it generates the desired cut pattern. Determined final dimensions of mount for clearance at engine.
 
Oct 16, 2023     Mount       Category: Engine
Using pvc tube to simulate steel tubing. Cut to length and used tubing notcher for fitting


 
Oct 14, 2023     Mount Category: Engine
Cut all bushings for engine mount.
Aligned engine plate with 1 degree track offset per RANS diagram
 
Oct 13, 2023     Jig Category: Engine
Drilled 1/2” holes in steel plates for the threaded rod that will support the plates in place
 
Oct 10, 2023     Mount Category: Engine
Used pvc tubing to determine where tubes will go. Marked steel plate for the 4 threaded rods that will support the upper plate. This plate will be set on a 1 degree right thrust per RANs drawing
 
Oct 09, 2023     Mount       Category: Engine
Drilled 1/2” hole on thrust line fly engine's mount and firewall mount. Will attach with threaded rod to lock plates into position on thrust line.


 
Oct 07, 2023     Mount Category: Engine
Drilled holes in steel plates for engine mount and firewall mounts
 
Oct 06, 2023     Mount Category: Engine
Marked steel plates location for mounting holes on engine and firewall. Verified locations. Determined that the engine needs to be 8 inches from the firewall for clearance of fuel pump fitting.
 
Sep 29, 2023     Doors Category: Fuselage
Adjusted both door latches for tight fit. Formed front door fairing strips to better match fuselage shape. Sanded windshield fairing

 
Sep 26, 2023     Skylight Category: Fuselage
Finished riveting skylight in place
 
Sep 25, 2023     Skylight       Category: Fuselage
Sanded upper strut fairing for greater clearance around strut. Riveted skylight retainer strips used clear silicone on all rivets to prevent moisture from getting into cockpit


 
Sep 24, 2023     Removed Category: Wings
Everything done that needed the wings attached. Wings removed.
 
Sep 16, 2023     Disassemble Category: Wings
Wings are ready to remove. Removed flaps
 
Sep 15, 2023     Fairings - (1 hour)       Category: Wings
Drilled holes for #8 nutserts. Installed nutserts in wing for upper strut fairing screws. Drilled fairing holes for screws


 
Sep 13, 2023     Fairing - (1 hour) Category: Wings
Installed and drilled rt upper strut fairing in place
 
Sep 12, 2023     Fairing       Category: Wings
Aligned and drilled upper strut fairing to wing skin. Removed strut and slid fairing over upper end of strut. Spaced fairing to mid wing rivets. Decided to use #8 screws to attach. Will drop skin for #8 nutserts


 
Sep 10, 2023     Fairing Category: Fuselage
Aligned and drilled wing gap seals. Notched rear of fairing a to clear weld on fuselage which then lets the fairing sit flush with fuselage tubing. Enlarged holes to #19 and debarred. Decided to order tubing for engine mount and fabricated by ourselves. Quotes to build and engine mount were $3000.
 
Sep 07, 2023     Gap Seal       Category: Fuselage
Fabricated right wing gap seal. Marked location for mounting holes. Drilled to fuselage. Installed nut plates.


 
Sep 04, 2023     Windshield fairing Category: Fuselage
Used superfill to make a smooth transition from fairing to fuselage
 
Aug 29, 2023     Gap seal Category: Fuselage
Aligned and drilled left gap seal to fuse. Marked left fuse locations for drill location. Need to remake gap seal for right side. It was not bent correctly.
 
Aug 28, 2023     Windshield       Category: Fuselage
Glued windshield fairing to fuse and windshield using 3M 2216 glue. Riveted fairing in place


 
Aug 24, 2023     Gap seals Category: Fuselage
Aligned flaps and ailerons with wingtip. Clamped in place. Fabricated left wing gap seal using 0.020 aluminum but decided it's to thin and flimsy. Will remake with 0.040 and adjust size to better fit plane. Reviewed plans and install for wing root gap seal. Decided to not use most forward hole for securing as this would drill thru front spar. Will move hole back behind spar into wing rib.
 
Aug 23, 2023     Gap seal - (1 hour) Category: Fuselage
Installed flaps and ailerons. Reinstalled wingtips in order to align ailerons. Adjusted rod ends on left flap to align flap with aileron.
 
Aug 18, 2023     Windshield       Category: Fuselage
Reinstalled windshield and all hold down strips to verify fit. Ready to final install windshield and skylight


 
Aug 17, 2023     Windshield       Category: Fuselage
Masked off windshield for painting where fairings will be. Scuffed with scotchbrite. Painted with rustoleum acrylic enamel.


 
Aug 14, 2023     Fairing Category: Fuselage
Cut windshield fairing to size and matched door cut out. Sanded edges round and smooth. Installed landing light in left wing. Wired and tested.
 
Aug 12, 2023     Glareshield - (1 hour)       Category: Fuselage
Installed rubber edge molding over sunbrella fabric. Worked out wrinkles and test fit fairing to glareshield. Ready to final secure glareshield before final install


 
Aug 09, 2023     Glareshield - (0.5 hour) Category: Fuselage
Marked and cut glareshield foam 1/2” from glareshield edge. This will allow edge molding to sit flush. Marked fabric for 1/4” overhang at edge.
 
Aug 04, 2023     Windshield       Category: Fuselage
Cut foam for glareshield. This will be an underlayment for the glareshield fabric. Should hide the rivets in the glareshield giving the fabric a smoother look.


 
Aug 02, 2023     Skylight - (1 hour) Category: Fuselage
Removed skylight and drilled last hole in center rib. Forget to drill when laying out rivet spacing. Installed foam tape on rear fuselage where skylight contacts. Clecoed skylight in place
 
Jul 18, 2023     Skylight - (1 hour) Category: Fuselage
Installed foam tape to skylight ribs. Adjust center rib at rear to match skylight. Used aluminum washers to shim rib. Put fairings in place and determined location to cut foam tape for clearance on the left to right fairings where windshield meets skylight
 
Jul 16, 2023     Windshield Category: Fuselage
Painted windshield and skylight fairing pieces
 
Jul 12, 2023     Glareshield Category: Fuselage
Removed windshield and made template for glare shield cover. Marked windshield at fairing and wing root cuffs for painting.
 
Jul 10, 2023     Windshield - (1.2 hours) Category: Fuselage
Removed skylight and drilled the holes for clearance per the plans. Used heat gun to rework fiberglass fairing for windshield hold down. Left side good but still need to do more work on the right side
 
Jun 28, 2023     Windshield Category: Fuselage
Marked and drilled windshield fiberglass fairing. Started to fit z track side windshield hold downs.
 
Jun 27, 2023     Skylight       Category: Fuselage
Aligned and drilled skylight hold down strips in place.


 
Jun 26, 2023     Windshield Category: Fuselage
Readjusted windshield 1.5" from the windshield tabs to windshield cutout. Checked square with skylight. Clecoed square tubing to skylight and drilled square tube to wing rib using the existing hole for the skylight retainer hold down strips. Marked skylight for trimming.
 
Jun 25, 2023     Winshield Category: Fuselage
Marked skylight for trimming and cut to size. Left a little long and edges and will trim for exact fit.
 
Jun 24, 2023     Windshield Category: Fuselage
Marked location for skylight hold down strips. Clamped in place and drilled. Fit windshield and determined location where skylight will butt against the windshield at.
 
Jun 24, 2023     Windshield Category: Fuselage
Marked rear windshield bow attachments for trimming. Trimmed attachments so bow is above the tab. Trimmed bows flush with rear of attachment tab. Riveted bows to S2 tabs. Continued to drill skylight retaining strips per the drawings.
 
Jun 22, 2023     Windshield       Category: Fuselage
Drilled windshield bows to fuselage


 
Jun 21, 2023     Windshield Category: Fuselage
Finished bending all 3 skylight bows. Continue to predrill the skylight holes using the mating strip to back drill. Match drilled the mating strips.
 
Jun 21, 2023     Windshield       Category: Fuselage
Started to form windshield bow ribs to match fuselage contour. Placed bow between blocks of wood in the vice and gently bent the bow.


 
Jun 18, 2023     Skylight Category: Fuselage
Marked and drilled forward holes in skylight where buts up to windshield.
 
May 30, 2023     Struts Category: Wings
Drilled and reamed rt wing strut to size. Measure spar distance on left wing and marked cut line on fuselage fitting.
 
May 25, 2023     Strut Category: Fuselage
Drilled left strut and then reamed to size. Ground and polished lower strut dogbone fitting to fit lower fuse strut bracket.
 
May 20, 2023     Strut       Category: Fuselage
Drilled left side lower strut fitting on fuse to 7/16"


 
May 20, 2023     Strut Category: Fuselage
Drilled left side lower strut fitting on fuse to 7/16"
 
May 18, 2023     Strut Category: Fuselage
Drilled RT lower fuse strut fitting to 7/16"
 
May 09, 2023     Doors Category: Fuselage
Cut door handle bushings to size. Installed handles. Marked left outside handle for drilling. Measure left wing spray dimensions for trimming dogbone fitting on fuselage
 
May 07, 2023     Boot Cowl       Category: Fuselage
Today finished riveting the boot cowl in place. Left out the 3 rear most rivets where the top skin overlaps the side skin. These will be riveted with the windshield fairing.


 
May 06, 2023     BOOT Cowl Category: Fuselage
Riveted top boot cowl in place
 
May 04, 2023     Doors Category: Fuselage
Filed weld off lower door. This let door trim sit closer to flush on door frame. Ordered Teflon fuel lines and fittings from summit racing.
 
May 01, 2023     Door Category: Fuselage
Made new forward door trim out of aluminum. Drilled to door using plastic as template.
Drilled bout cowl for GPS antenna wire. Installed grommet and secured wire.
 
Apr 30, 2023     Fairing Category: Fuselage
Trimmed fuselage aileron fairing to initial size using molded lines in fairing.
 
Apr 30, 2023     Misc       Category: Fuselage
Removed top boot cowl skins and used a roller to roll the skins to better match fuselage angle. Remade side seat panel bracket to reinstall fairing..tucked fairing under fuselage tube to better secure. Starting to fabricate aluminum door trim. Removed plastic trim from door leading edge and will replace with the aluminum trim strip.


 
Apr 27, 2023     Boot cowl       Category: Fuselage
Trimmed upper boot cowl skins to match carbon instrument panel. Reinstalled to test fit. Need to roll outside edge of skin to get a tighter fit on side skin.


 
Apr 17, 2023     Wiring Category: Avionics
Secured remaining wire bundles. Verified all systems work properly. Formed door plastic trim strips to better match fuselage
 
Apr 14, 2023     Door Category: Fuselage
Reviewed door instructions.
Riveted door fairing strips in place
 
Apr 12, 2023     Wing tip Category: Wings
Marked and trimmed left wing tip for final trim.
 
Apr 11, 2023     DSub Category: Avionics
Installed all DSub connector housings on avionics wires. Secured wire bundled
 
Mar 31, 2023     Nutplates Category: Wings
Installed left wing bottom nutplates for wing tip.
 
Mar 29, 2023     Nutplates Category: Wings
Installed nutplates to of left wing tip rib.
 
Mar 28, 2023     Wing tip Category: Wings
Drilled remaining screw holes in top of left wing tip. Marked and sanded tip for nice edge to skin. Fabricated end aluminum rib to fill in plastic wing tip.
 
Mar 27, 2023     Wingtip Category: Wings
Marked top of wingtip for screws. Drilled 5 screws.
 
Mar 26, 2023     Wing tip Category: Wings
Trimmed left wingtip to match wing. Marked screw holes and drilled bottom of tip to wing.
 
Mar 22, 2023     Labeling Category: Instrument Panel
After 3 days and multiple hrs of practice I have given up on using the DecalPro system. I was never able to get good results or even make the system work. Will be looking for an alternative way to label the panel.
 
Mar 21, 2023     Wingtip Category: Wings
Place wingtip in position and marked trim line with wing skin. Started to trim to size. First attempt at using decalpro. Results not good. Image doesn't pull all the way off the mylar transfer. Read on internet about cleaning mylar with goo gone or rubbing alcohol. This is supposed to cause more of a static cling of the image to let it release better. Will try tomorrow.
 
Mar 19, 2023     Left wing tip Category: Wings
Used tooling holes to align tip rib with wing. Marked spacing for rivets and drilled to #30. Cut leading edge of plastic tip rib and drilled in place. Trimming side seat plastic panels to fit.
 
Mar 18, 2023     Tank SB Category: Wings
Installed left wing tank pieces per SB instructions, These pieces keep tank from moving in the wing.
 
Mar 16, 2023     Riveted Category: Wings
Riveted wingtip rib to wing. Rivet the rear tip rib that we fabricated to the wingtip. Moved left wing into shop to start wingtip assembly
 
Mar 15, 2023     Wingtip       Category: Wings
Drilled aluminum file rib to wingtip.


 
Mar 13, 2023     Wingtip - (1 hour)       Category: Wings
Reinstalled Wingtip. Made template for filling in tip aft of rear spar. Usd bending brake to fabricate 0.020 rib. Test fit in place. Studied instructions for using decalpro maker.


 
Mar 12, 2023     Wingtip - (2 hours)       Category: Wings
Dimpled tip rib for attaching rivets. Riveted wingtip rib to wing. Routed wiring for electric fuel pump. Added the fuel pump switch inline with the other switches. Cut out new hole in carbon panel for switch inserts. Tested operation of switch with success.


 
Mar 11, 2023     WingTip Category: Wings
Finished drilling wingtip to wing. Installed nutplates on rib.
 
Mar 08, 2023     Wingtip Category: Wings
Continue to trim wingtip to fit.
 
Mar 07, 2023     Wingtip Category: Wings
Finished securing left wingtip bottom. Installed nutplates for#6 screw. Flipped wing and made initial trim for top of wingtip. Remarried for trimming and sanded and test fit.
 
Mar 06, 2023     Wingtip - (0.5 hour)       Category: Wings
Put wingtip in position over new metal wingtip rib. Used cutoff from front of plastic tip rib and drilled to metal tip rib. Trimmed to match wing skin. Drilled bottom side of the wingtip in place. Installed #6 nutplates into rib flange for attaching wingtip.


 
Mar 05, 2023     Wingtips Category: Wings
We decided to purchase wingtip ribs to use as wingtip support ribs instead of the plastic rib. Used tooling holes to align wingtip rib to wing. Drilled to wing. Test fit wingtip and trimmed.
 
Mar 04, 2023     Panel Category: Avionics
Applied second coat of paint to panel and interior pieces
 
Mar 03, 2023     Tank Category: Wings
Finished tank SB install in rt wing.
 
Feb 28, 2023     Tank Category: Wings
Started SB for tank modification to limit tank movement inside of the wing.
 
Feb 26, 2023     Interior Category: Paint / Decals
Primed interior pieces
 
Feb 23, 2023     Interior Category: Fuselage
Removed all interior pieces and scuffed with red scotch Brite pads. Removed instrument panel panels.
 
Feb 19, 2023     Fuel Pump       Category: Fuselage
Installed facet fuel pump under left seat using fuselage tabs for high pressure pump. Trimmed rear of wingtip support rib. Taped wingtip in place and marked for trimming to match wing.


 
Feb 18, 2023     Tips       Category: Wings
Took fuselage out of the shop and brought in rt wing. Made practice labels for panel.


 
Feb 16, 2023     Baffle       Category: Engine
Aligned and drilled left side baffle side to rear baffles. Drilled left rear baffles together. Aligned and located mounting holes on right side baffles. Drilled and installed.


 
Feb 16, 2023     Baffles       Category: Engine
Fit left side baffles to engine. Formed as needed and drilled holes for mounting.


 
Feb 12, 2023     Baffles       Category: Engine
Filing baffles to size and polishing edges.


 
Feb 11, 2023     Baffles       Category: Engine
Cut out remaining baffles to size. Added wire protector to wires on left fuselage.


 
Feb 08, 2023     baffle Category: Engine
Rough cut baffles from 2024 T3 0.032. Trimmed wingtip and support rib to cut line. Starting to sand to size.
 
Feb 07, 2023     Tips Category: Wings
Used vibrating tool to cut out the wingtips and support ribs. Transferred all baffle material to aluminum. Installed fresh air vent hose.
 
Feb 06, 2023     Wing tip Category: Wings
Marked the cut line on the wing tip and wrong tip support rib. Transferred baffle template patterns to aluminum. Ready to cut wingtips and baffles
 
Feb 05, 2023     accessory case       Category: Engine
installed oil filter adapter from Casper labs. Installed K and P reusable oil filter.


 
Feb 04, 2023     Magnetometer Category: Avionics
Ran wires for magnetometer from EFIS to wing rooty. Routed OAT wire. Ground washer on accessory case to allow PMag to clear and sit flush on case.
 
Feb 02, 2023     Mags Category: Engine
Removed studs from old accessory case and installed in new case. Temporarily installed pmags.
 
Jan 31, 2023     Mags Category: Engine
Installed gears onto PMags and torqued nut. Installed vacuum cover plate and fuel pump onto accessory case.
 
Jan 28, 2023     Side panels       Category: Interior Finish
The forward side panels per RANS are riveted to the stick cover panels. Decided to add nutplates where riveted to split the pieces onto 2. This makes removal allot easier.


 
Jan 26, 2023     Safety wired oil pump. Category: Engine
 
Jan 25, 2023     Case Category: Engine
Cleaned new accessory case flanges where gaskets will sit. Reinstalled oil pump assembly into case. Ready to safety wire. Ordered gasket for oil pump suction tube. Ready to reassemble when gasket arrives.
 
Jan 24, 2023     Accessory case       Category: Engine
Removed all accessories. Removed induction tubes, oil pan, and accessory case.


 
Jan 23, 2023     Case Category: Engine
Removed all baffle templates. Loosened all accessories. Ready to remove the accessory case.
 
Jan 22, 2023     Throttle Category: Fuselage
Drilled panel for carb heat, throttle, and mixture. Installed for test fit. Deburred, dimpled, and riveted angles to forward side baggage walls. This is to reinforce and keep panel tight against fuselage tubing. Moved engine into shop.
 
Jan 21, 2023     USB Category: Fuselage
Marked and cutout panel for usb wire. Finished making template for forward carpet.
 
Jan 19, 2023     Oil pressure       Category: Avionics
Drilled panel for low oil pressure light. Installed and wired. Updated EFIS to current update. Marked location on panel for USB connector. Fabricated angle from 0.020 aluminum to use as a stiffener for forward baggage side. The top of the side panel sticks out from fuselage tubing and this angle pulls the sidewall into place.


 
Jan 16, 2023     Radio Category: Avionics
Adjusted aux 1 audio squelch. Can now hear GRT EFIS warnings. Made template of front floor for carpet.
 
Jan 15, 2023     Warning Category: Avionics
Wired in low oil pressure warning light. Verified operation. Wired audible warnings. Not working. Will investigate
 
Jan 13, 2023     Misc Category: Avionics
Started to program GRT serial ports. Verified operation on ADSB/GPS and transponder. Wired EIS to EFIS. Started to wire audio for EIS/EFIS to intercom.
 
Jan 09, 2023     PMags       Category: Avionics
Cut opening in side of glove box for installation of 9 volt battery box for PMags. Wired battery box. Routed wires for EIS to power and ground. Studied manual for EFIS setup.


 
Jan 08, 2023     Cabin heater       Category: Fuselage
Finished installation of cabin heat. Fabricated a stand off to space cable away from firewall. This provided for a more direct route of the cable to box eliminating any bending motion of cable.


 
Jan 07, 2023     PMags       Category: Avionics
Found pin call or for S700-2-10 switches. Connected all PMag wires and verified operation. Verified operation of timing switch and battery backup switches.


 
Jan 05, 2023     PMAG Battery Backup Category: Avionics
Routed and labeled wires for battery backup switch for PMags. Attached to switch. Need to figure out pin pattern on the S700-2-10 PMag switch for wire hook attachment
 
Jan 04, 2023     Switch Category: Avionics
Drilled mount for switches. Wired PMag timing switch.
 
Jan 03, 2023     Brake Lines       Category: Landing Gear
Installed left and rt brake lines from caliper the fuse. Started to install firewall pass thru for cabin heat. Dave made fitting to route cable down firewall instead of straight out which would require a bend in the cable.


 
Jan 02, 2023     Brakes       Category: Instrument Panel
Installed left and brake lines from parking brake to build fittings. Fabricated bracket to mount PMAG switches for timing and battery back up


 
Dec 31, 2022     PMAG Category: Instrument Panel
Wired power and ground to pmags switches. Added annex to shop. We have the main door opened up with 2" foam roof and front. Added 4 foot to the existing shop length.
 
Dec 27, 2022     Plate       Category: Instrument Panel
Drilled throttle plate to carbon panel. Used 4 nut plates to attached. Drilled and riveted nut plates to panel. Decided on location of pmag switches, marked location and drilled. Used S700-2-10 switch.


 
Dec 26, 2022     Gear Category: Fuselage
Installed right landing gear. Reinstalled EIS box to mount.
 
Dec 24, 2022     Gear       Category: Fuselage
Installed left landing gear. Reinstalled baggage compartment and made poster board template for carpeting. Continue to cover tail surfaces.


 
Dec 23, 2022     Landing Gear Category: Fuselage
Primed area of boot cowl where the landing gear will attach.
 
Dec 22, 2022     TW Category: Fuselage
Installed tailwheel. Raised fuselage on sawhorse in preparation for installing gear. Redid an adel that had a wire running thru the clamp part.
 
Dec 20, 2022     Static Category: Fuselage
Drilled holes for the static ports. Deburred and installed the ports. Used static ports bought from showplanes products.
 
Dec 18, 2022     Glove box Category: Fuselage
Rerouted some wires and secured. Fabricated mount for rear of glove box to add additional support. Started to prepare fuel lines from header tank forward.
 
Dec 17, 2022     Pitot       Category: Fuselage
Secured more wiring. Installed and routed pitot, static, and AOA lines. Installed daub connector to trim wires


 
Dec 16, 2022     Accessory Case       Category: Engine
Cleaned accessory case. Removed old gasket material from surfaces. Ordered used vernatherm part #75944


 
Dec 15, 2022     Parking Brake Category: Fuselage
Cut parking brake cable to length. Installed cable. Will add a length of steel to brake cable mount to move cable more in line with valve arm. Secured more wires with adel clamps. Researched oil filter adapter and need for vernatherm.
 
Dec 13, 2022     Parking Brake Category: Fuselage
Drilled instruent panel for parking brake cable.
 
Dec 11, 2022     Headset jacks Category: Avionics
Rewired headset jacks. Cut wires to length. Resoldered jacks with correct jacks to mic and phone wires. Tested and work. Drilled mounting hole for parking brake. Can not get the nuts to thread on the shaft. Will investigate another day.
 
Dec 10, 2022     Glove box Category: Fuselage
Rivet glove box together. Countersunk holes for attachment to instrument panel. Riveted glove box to panel.
 
Dec 07, 2022     Glove box Category: Fuselage
Final drilled all glove box holes. Countersunk holes on instrument panel to glove box.
 
Dec 07, 2022     Trim Category: Fuselage
Wired trim controls at stick grip. Used dsub connectors for wire attachment. Started to gather parts for parking brake assembly. Researcher engine fuel pump requirements. Appears as if we can remove the mechanical fuel pump
 
Dec 05, 2022     Glove box       Category: Fuselage
Drilled glove box door hinge to door and box. Ready to final drill holes, countersink, and then rivet box


 
Dec 04, 2022     Misc       Category: Fuselage
Cont to route trim wires.
Wired copilot ptt. Reinstalled rudder cables onto pedals and rudder return springs to firewall. Used cowling to determine if engine could be moved forward. Determined that engine cannot be move forward due to clearance on ring gear and starter motor. Marked location on interim panel for glove box and drilled. Cut out glove box opening.


 
Dec 03, 2022     Radio Category: Avionics
Continue to trace wiring for reason no voice or audio on radio. Found issue - wired mic jacks to audio wiring. Redid jacks and radio works. Route trim wires.
 
Nov 30, 2022     Radio Category: Avionics
Called Garmin tech support. They think radio is faulty. Will do more tests to determine
 
Nov 29, 2022     Radio Category: Avionics
Spent more time try to get Garmin GTR200 radio to work. TX and RX but there is no sound in headsets. Rechecked all wiring and looks ok. Trimmed wires for wig wag module. Routed and secured trim wire. Still need to hook wires to stick. Marked location of glove box.
 
Nov 28, 2022     Radio antenna       Category: Avionics
Fabricated antenna end of radio cable. Solder washer onto shield for the ground.


 
Nov 27, 2022     Antenna Category: Avionics
Fabricated antenna for Transponder and radio. Need to solder on ground washer for radio antenna. Mounted wig wag module to EIS plate. Drilled firewall for battery cable and routed cable to starter solenoid.
 
Nov 26, 2022     Antenna Category: Avionics
Fabricated antenna for ADSB. Tested wire and show zero resistance.
 
Nov 24, 2022     Wiring       Category: Avionics
Secured more wire bundles. Cut the end of EIS mount to let the wire bundles pass with more clearance. Filed smooth. Will add rubber edging to protect wires in case they rub. Started to route trim wires to control stick. Remade master relay diode. Had the diode in the wrong direction.


 
Nov 21, 2022     Wiring       Category: Avionics
Routed wires and secured


 
Nov 20, 2022     EIS       Category: Avionics
Mounted EIS box to aluminum plate. Mounted this plate to fuselage tubing. Installed USB charger and wig wag module to plate. The USB will be for charging tablets secured to panel. Secured wiring with adel clamps off of tubing. Drilled panel for key and center console for USB charger. Glued PTT switch on copilot stick.


 
Nov 18, 2022     Avionics       Category: Avionics
Reinstalled starter push button into panel. Labeled starter wires and tested start circuit. Works!
Marked location on panel for key switch. Riveted center console plate to console. Used flush AN426 3-3 rivets. Started to reinstall firewall and spacers.


 
Nov 17, 2022     Start switch       Category: Avionics
Fabricated mount for light power connections. Mounted to battery mount with 1/16” angle. Wired start switch to start button. Tested connections and work. Fabricated a plate to cover center console holes. Will mount usb charger to this area.


 
Nov 15, 2022     Autopilot Category: Avionics
Wired autopilot, USB behind panel, alternator switch. Tested nav light circuit. Made aluminum mount for EIS. Will mount onto tubing behind panel. Started to wire key and push button start switch.
 
Nov 13, 2022     Wiring Category: Avionics
Wired USB plug into center console. Rewired landing switch after wiring for the indicator light was wrong. The way it was wired the indicator light would pulse with the wig wag feature. Determined that landing light switch cannot have the indicator light wired. It will always pulse due to where it gets the power for the indicator light. Found roll servo wiring harness after looking again for it.
 
Nov 12, 2022     PTT Category: Avionics
Wired pilot PTT and trim switch on pilot stick
 
Nov 06, 2022     Switch Category: Avionics
Rewired switch lights for indicator. Tested wig wag landing lights.
 
Nov 04, 2022     Fuse Category: Avionics
Installed fuse block mount and fuse blocks. Used #8 pet nuts to secure fuse blocks.
 
Oct 30, 2022     Fuses Category: Avionics
Drilled fuse blocks to mount. Installed #6 PEM nuts into mount for securing fuse blocks.
 
Oct 27, 2022     Switch lights Category: Avionics
Spent the evening determining how to have bottom switch light activate when switch is on and turns off when switch is off. Determined that need to wire a jumper from pin 3 to 10. Switches are Carling VAD2
 
Oct 26, 2022     Wiring Category: Avionics
Wired alternator switch. Trying to determine switch light wiring. Wired avionics relay and tested. Works correctly.
 
Oct 25, 2022     Wiring       Category: Avionics
After checking wires and continuity of switch we determined master switch wires were connected to wrong pins. Repositioned wires and master switch works. Need to redo switch light wiring to have them indicate light when switch is on. Currently the lights are on continuously


 
Oct 24, 2022     Autopilot Category: Avionics
Readjusted capstan cable. Fabricated ground wire for ground block
 
Oct 23, 2022     Battery Category: Avionics
Fabricated ground wire from battery. Attached to nonrubberized adel. Attached adel to fuselage frame after sanding frame to bare metal. Installed fuses on fuse blocks. Reinstalled capstan cable. Need to redo as cable still goes slack
 
Oct 22, 2022     Autopilot Category: Avionics
Reinstalled roll autopilot servo after GRT Avionics rebuilt unit.
 
Oct 21, 2022     Bus       Category: Avionics
Ran wires from relay to main bus. Fabricated wires for avionics relay.


 
Oct 20, 2022     Autopilot       Category: Avionics
Received roll servo back from GRT. Repaired for defective part. Reinstalled capstan pulley and ready to install. Riveted nutplates to battery mount angle and reinstalled. Drilled battery box to mount. Riveted an angle to mount to hold Master relay.


 
Oct 19, 2022     Battery Category: Avionics
Determined elevator control throws and position of control stops on elevator tube. Fabricated battery mount with 1/16" angle adel clamped to fuselage tubes under baggage compartment. Drilled mount to battery box.
 
Oct 13, 2022     Wires Category: Avionics
Ran more power and ground wires. Routed wires from Avionics switch to relay.
 
Oct 12, 2022     Wires       Category: Avionics
Continue to route per and ground wires.
Routed wires for landing lights and nav lights. Terminated in a power block.


 
Oct 11, 2022     Wire Category: Avionics
Continue to run power and ground wires to fuse and ground blocks.
 
Oct 10, 2022     wiring Category: Avionics
Relocated all wires to rt side of fuselage after determining that fuse block mounting would be better under rt seat. Started to terminate wires for attachment to fuse blocks. Ordered more wire from Stein Air.
 
Oct 09, 2022     Wiring Category: Avionics
Made poster board template for mounting the fuse blocks under right seat. Determined location and mounting brackets for battery. Measured tube sizes for adels that will mount the fuse block and battery mounts.
 
Oct 07, 2022     Wire Category: Avionics
Measured wireless or battery in alternator wires. Determined connectors needed for wiring. Ready to order wires from Spruce. Removed roll autopilot to check resistance on pulley. Called GRT and left message regarding I resistance on servo letting cable go slack.
 
Oct 05, 2022     Wiring Category: Avionics
Started to route wires in fuselage
 
Oct 04, 2022     Panel       Category: Avionics
Installed AeroSport panel in fuselage. Ready to route wires. Clamped capstan cable to aileron cable. GRT servo has resistance that when move cable the resistance is high enough that aileron cable goes slack. Will research and call GRT to determine fix.


 
Sep 28, 2022     Wiring       Category: Avionics
Finished wiring switches. Installed capstan cable to aileron cable.


 
Sep 26, 2022     Autopilot       Category: Avionics
Drilled roll autopilot to bracket and installed. Continue to work on wire harness. Made wires for nav, strobe, and switch lights. Checked operation of switch lights and lights work.


 
Sep 25, 2022     Wire harness Category: Avionics
Continue to work on wiring harness. Initial layout for roll autopilot servo.
 
Sep 22, 2022     Radio       Category: Avionics
Wired audio jacks. Installed jack wires into DSub connector


 
Sep 21, 2022     Jacks       Category: Avionics
Checked EFIS wiring. Wired mic jacks


 
Sep 20, 2022     Capstan Category: Avionics
Installed capstan cable onto pulley. Used a vice to press cable Ferrell into hole on pulley. Continue to study and lay out pin assignments for Garmin GTR 200 radio. Ready to start fabricating wire harness
 
Sep 19, 2022     Servos Category: Avionics
Positioned servos on RANs autopilot mounts for locating installation. Needed to move roll mount so aileron cable clears the mounting flange. Called GRT Avionics to ask about capstan. When insert barrel on cable there is interference with the cable guard. State will get back with us. Continue to read Garmin GTR200 manual for installation.
 
Sep 15, 2022     Wiring Category: Avionics
Cont to wire EFIS. Installed capstan pulleys on roll servo. Installed autopilot servos to mounts and safety wired.
 
Sep 12, 2022     Cabin heat       Category: Firewall
Drilled cabin heat box to firewall. Tried to mount GRT autopilot servis to mount but doesn't fit. RANS mount must be specific to Garmin.


 
Sep 11, 2022     Echo       Category: Avionics
Wired Uavionics Echo to GRT SafeFly gps. Read GRT Garmin 327 supplement and determined wire route


 
Sep 09, 2022     Wiring Category: Avionics
Started to lay out wires that connect SafeFly gps to Uavionics echo.
 
Sep 06, 2022     Brakes       Category: Fuselage
Installed brake lines onto rudder pedals and brake cylinders. Finished installation of seat pan pieces. Final drilled all holes to size. Studying manuals from GRT for EFIS installation.


 
Sep 05, 2022     Booth Category: Workshop
Took apart paint booth.
Made simulated firewall to engine to determine if pmags will fit. Need to call emag to determine depth of mag without coil.
 
Sep 04, 2022     Switches Category: Instrument Panel
Filed switch locations to fit. Installed switches into panel. Panel complete ready to wire.
 
Sep 03, 2022     Switches Category: Instrument Panel
Marked and cutout switch locations. Used Drexel fiberglass cut off wheel.
 
Sep 02, 2022     Panel Category: Instrument Panel
Drilled and installed push button ignition switch. Drilled and installed nutplates for radio stack insert. Cutout panel insert for EFIS.
 
Sep 01, 2022     Inserts       Category: Instrument Panel
Drilled carbon panel for radio insert platenuts. Replaced 1 PEM nut that came loose. Drilled firewall for throttle/mixture pass thru and installed. Installed wire pass thru that we fabricated. Started to take down paint booth. Ordered wiring supplies from Stein.


 
Aug 30, 2022     Inserts Category: Instrument Panel
Final fit of all panel inserts. Drilled in place. Continue to figure out wiring order for radio and transponder.
Trimmed seat pans to clear side panels.
 
Aug 28, 2022     Inserts Category: Instrument Panel
Fit and drilled rt. panel insert.
Fit radio column panel.
Installed header tank in fuselage.
 
Aug 25, 2022     Radio       Category: Instrument Panel
Drilled radio racks to aluminum angle on panel.


 
Aug 23, 2022     Radio insert       Category: Instrument Panel
Filed radio insert to size. Respaced radio rack attach brackets. Had set at 6 1/4" but radio racks are 6 5/16". Drilled for PEM nuts.


 
Aug 22, 2022     Throttle bracket       Category: Instrument Panel
Added PEM nuts to Aerosport panel for #6 screws that attach throttle bracket. Cut and fit EFIS panel insert. Took a lot of filing to get it just right. Clamped in place and drilled to carbon panel.


 
Aug 16, 2022     Throttle       Category: Instrument Panel
Countersunk holes for throttle reinforcement. Riveted on using AN426 rivets. Countersunk for #6 screws that hold throttle bracket to panel. Started to look at wiring for GRT Avionics.


 
Aug 14, 2022     VENTS Category: Instrument Panel
Drilled 2 1/2" hole in aluminum to test fit fresh air vents. Fit is good. Drilled holes in Aerosport panel for fresh air vents.
 
Aug 13, 2022     interior       Category: Interior Finish
Rivet seat side panel brackets in place. Trimmed left side panel to fit. When screwed in place on center bracket the panel is able to easily vibrate. Will look into possibly making another mount to make more secure


 
Aug 12, 2022     Template Category: Instrument Panel
Made poster board templates for panel insert cutouts. Transferred to old RANS panel to cutout and test fit. Can use aluminum for radio stack. Will need to buy aluminum for EFIS panels due to RANS panel screw holes showing on inserts.
 
Aug 10, 2022     Panel       Category: Instrument Panel
Back drilled using PEM nuts for panel inserts. Made paper template of panel inserts. Will transfer to poster board for final fit.


 
Aug 08, 2022     Carbon       Category: Instrument Panel
Used Dremel with a sanding disk and sanded wall thickness of carbon panel to fit subpanel. Filed subpanel for alignment. Clamped carbon panel in place and back drilled using PEM nuts for location. Countersunk holes for flush screws.


 
Aug 07, 2022     Panel Category: Instrument Panel
Filed subpanel to fit carbon. Need to Dremel carbon wall thickness on left/right ends to left subpanel fit. Carbon is too thick on the sides.
 
Aug 04, 2022     Panel Category: Instrument Panel
Back to work after returning from OSH.
Countersunk #6 screw location for holding Aerosport panel to Rans panel. Installed screws. Test fit for alignment with carbon panel. Started to trim carbon for fit.
 
Jul 19, 2022     Aerosport Category: Instrument Panel
Enlarged the holes in the RANS subpanel for PEM nut clearance. Drilled the throttle bracket to the aerosport panel. Studied the plans for the remaining steps.
 
Jul 16, 2022     Panel Category: Instrument Panel
Back drilled AeroSport panel to the RANS subpanel. Aligned angle for the radio stack and drilled to AeroSport subpanel. Angles are set at 6.25" spacing for radio trays.
 
Jul 13, 2022     Firewall Category: Firewall
Marked firewall locations for all holes that need drilled.
 
Jul 10, 2022     Seat pans Category: Interior Finish
Drilled and riveted on seat pan reinforcement angles. Used flush 18" solid rivets.
 
Jul 09, 2022     Interior Category: Interior Finish
Installed center channel cover behind flap cover. Drilled and riveted angle to the F3 bulkhead. Adjusted this angle to match the angle of the cover. Drilled holes for the screws that attach cover to angle and flap cover.
 
Jul 05, 2022     Flap cover       Category: Interior Finish
Final fit of flap cover. Used heat gun to soften plastic and the press indentation into it to give more space to clear bolt on the side. Glued on ABS strip and drilled holes.


 
Jul 01, 2022     Rudder cable cover       Category: Interior Finish
Found exit location of rudder cables in fairing. Marked and drilled fairing for cables.


 
Jun 28, 2022     Interior       Category: Fuselage
Fit and installed left side lower forward interior sides. Fabricated a tab like on the right side to hold side in place to floor. Trimmed rudder cable cover to size and fit in place. Drilled 1 hole for alignment.


 
Jun 27, 2022     Interior       Category: Fuselage
Finished drilling control stick covers in place. Determined fit of rt. lower side pieces and drilled in place. Made a tab to attach forward for side to floor. Without the tab the side was not aligned and would vibrate.


 
Jun 25, 2022     Interior       Category: Fuselage
Installed elevator pushrod. Set control throw to determine control stick location and adjusted rod end bearings. Drilled control stick covers in place.


 
Jun 23, 2022     Interior Category: Fuselage
Studying plans for interior install. Placed all pieces in approx positions to determine how they all fit together.
 
Jun 20, 2022     NACA vents Category: Fuselage
Located and drilled NACA vents to boot cowl. Deburred. Applied silicon sealant to vents and riveted in place.
 
Jun 10, 2022     Brake       Category: Firewall
Drilled brake reservoir to firewall. Used S21 firewall drawings for location. Drilled thru tab and firewall for brake line T fitting and installed.


 
Jun 08, 2022     Rudder Category: Controls
Drilled firewall at tabs for rudder return springs. Installed u-mount and return springs.
 
Jun 07, 2022     Elevator push rod Category: Controls
Installed forward push tube. Fabricated elevator control stops.
 
Jun 06, 2022     Flap/Parking Brake       Category: Fuselage
Installed flap mechanism to fuselage. Fabricated and drilled parking brake reinforcement plate per drawings. Discovered a discrepancy with brake reservoir. Figures drawing shows it on the opposite side of the parts drawing. Will research and verify correct placement.
Looked at S21 firewall and the figures are different. Will use S21 figures and parts drawings as this is what matches our firewall.


 
Jun 02, 2022     Interior controls       Category: Fuselage
Installed master cylinders to fuselage.
Installed control stick. Match drilled forward bagged floor upright in place.


 
May 30, 2022     Fuse       Category: Fuselage
Assembled all aileron pulleys and installed. Installed firewall, bottom and side boot cowl pieces.


 
May 28, 2022     Pulleys       Category: Fuselage
Installed pulleys for rudder cables. Gathered all pieces for aileron pulley assemblies and started to assemble. Not sure how to tighten bolt in the u brackets. There is no room for a wrench or a socket.
Installed bottom boot cowl and placed closed cell foam in place for sound dampening. Glued rubber edging to floorboard. Installed door attachments.


 
May 26, 2022     Rudder cables       Category: Fuselage
Installed cable guide and elevator pushrod guide. Started to fabricate aileron bellcranks.


 
May 24, 2022     Rudder Cables       Category: Fuselage
Moved fuse back into hangar due to inability to get paint from Airtech. No supply of chemicals. Installed rudder pedal pulleys and cable guides.


 
May 21, 2022     Primer       Category: Fuselage
Cleaned fuselage with Zep foaming glass cleaner. Primed fuselage with 2nd coat of AirTech fabric primer.


 
May 19, 2022     Wet sand       Category: Paint / Decals
Used red scotch brite pads and sanded tape edges. Wet Sanded entire fuselage with 320 wet sandpaper.


 
May 17, 2022     Prime Category: Paint / Decals
Primed fuselage fabric with Airtech fabric primer.
 
May 09, 2022     Booth       Category: Paint / Decals
Finished assembling paint booth. Added ceiling and lights.


 
May 07, 2022     Paint Booth       Category: Fuselage
Today we set up the paint booth that we borrowed from Randy. We are ready to install the ceiling and lights.


 
May 03, 2022     Tapes       Category: Fuselage
All tapes glued on. Used iron to go over tapes and smooth pinked edges. Final topcoat of glue applied to all tapes.


 
May 01, 2022     Longeron tapes Category: Fuselage
Glued on left and right top longeron tapes.
 
Apr 27, 2022     Tapes Category: Fuselage
Glued on all fuselage side tapes
 
Apr 26, 2022     Tapes Category: Fuselage
Glued on bottom longeron tapes and door frame tapes.
 
Apr 25, 2022     Tapes Category: Fuselage
Cut and glued left side tapes at door location
 
Apr 25, 2022     Tapes Category: Fuselage
Glued all bottom tapes on place
 
Apr 21, 2022     Taping Category: Fuselage
Marked location of all tapes on fuselage.
 
Apr 19, 2022     Covering Category: Fuselage
Went over all pinked edges with iron the smooth edges.
 
Apr 18, 2022     Covering       Category: Fuselage
Made lexan donuts and placed at antenna locations on fabric. Used soldering iron to burn holes for antenna, gear bolts, and screw locations.


 
Apr 17, 2022     Covering Category: Fuselage
Glued on seaplane grommets to bottom fuse. Covered them with a dollie. Installed fin rib reinforcement lexan. Fuselage is ready for tapes.
 
Apr 15, 2022     Covering Category: Fuselage
Continue to apply reinforcement patches to bottom fuselage
 
Apr 14, 2022     Covering Category: Fuselage
Added reinforcements to bottom fuselage at gear attachment for trike and header tank sump.
 
Apr 13, 2022     Covering       Category: Fuselage
Started adding inspection rings and patches to bottom fuselage.


 
Apr 12, 2022     Covering Category: Fuselage
Finished adding reinforcement patches to side fuselage. Placed patches over ride cable exits and elevator horn exits.
 
Apr 10, 2022     Covering Category: Fuselage
Added reinforcement patches to window frames and at gear leg.
 
Apr 07, 2022     Covering Category: Fuselage
Starting to add fabric reinforcement patches.
 
Apr 02, 2022     Covering Category: Fuselage
Continue to cut out doilies for fabric reinforcement. Glued on doilies.
 
Mar 31, 2022     Covering       Category: Fuselage
Marked location at left fuselage for inspection rings and elevator pushrod exit. Glued plastic rings in place. Cut rudder cable exits to size.


 
Mar 30, 2022     Covering Category: Fuselage
Cut fabric out around windows and glued in place.
 
Mar 29, 2022     Covering Category: Fuselage
Cut left fuselage fabric to size. Glued edges in place.
 
Mar 29, 2022     Covering Category: Fuselage
Shrunk left fabric to 300 degrees
 
Mar 27, 2022     Covering       Category: Fuselage
Applied a thick cost of AirTec glue to rt fabric. Shrunk fabric to 300 degree stage. Painted interior window frames. Cut and applied left side fabric to fuselage. Glued perimeter in place.


 
Mar 26, 2022     Fabric covering Category: Fuselage
Cut rt fuselage covering to size. Glued all the edges.
 
Mar 25, 2022     Covering       Category: Fuselage
Cut fabric for right fuselage side. Glued to perimeter.


 
Mar 24, 2022     Covering Category: Fuselage
Applued 2 thick coats of airtech glue to perimeter of fuselage sides where the fabric will be glued
 
Mar 23, 2022     Rotator       Category: Fuselage
Install a fuselage on rotator


 
Mar 22, 2022     Covering Category: Fuselage
Cut and wrapped fabric around bottom longeron tube. Heat shrunk fabric. Installed rear rotator onto trapshooting mounts. Attached plywood to engine mount holes for mounting of the rotator.
 
Mar 21, 2022     Covering Category: Fuselage
Cut bottom fabric to size. Glued perimeter of bottom fabric to longerons.
 
Mar 20, 2022     Fuse Category: Fuselage
Removed landing gear and boot cowl. Moved fuselage into shop and positioned upside down for covering.
 
Mar 19, 2022     Rotator Category: Fuselage
Borrowed fuselage rotator. Drilled rotator rear plate to match TW attach bolts. Cut plywood to fit on engine mount bolts for front rotator attachment.
 
Mar 17, 2022     Covering Category: Fuselage
Covered left elevator.
 
Mar 16, 2022     Covering Category: Fuselage
Finished covering left elevator.
 
Mar 15, 2022     Covering       Category: Fuselage
Glued the fabric around the perimeter of the left elevator. Studied plans for how trim servo installs in right elevator.


 
Mar 14, 2022     Firewall blanket       Category: Fuselage
Used sewing machine to sew a hem on the firewall blanket. Covered bottom of left elevator.


 
Mar 13, 2022     Covering Category: Fuselage
Covered left stabilizer.
 
Mar 12, 2022     Covering       Category: Fuselage
Covered rt stabilizer using Airtec System. Will shrink fabric after glue cures.


 
Mar 08, 2022     Covering Category: Fuselage
Practiced covering one side of a spare rudder. Using Airtec system.
 
Mar 01, 2022     Adsb Category: Fuselage
Drilled adsb and transponder mounts to tabs. Riveted on nutplates. Aligned and drilled S- 21 gear leg fairings to the tabs we welded on a fuselage.
 
Feb 28, 2022     Boot cowl Category: Fuselage
Used a belt sander to sand boot cowl skins flush with firewall flanges.
 
Feb 26, 2022     Foam       Category: Fuselage
Cut EVA foam to go under floorboard. Cutfire blanket for firewall. Cleaned ELT tabs for priming.


 
Feb 24, 2022     Transponder       Category: Fuselage
Welded tabs onto fuselage for attaching ground planes for the transponder and adsb mounts. Welded on tabs to the fuselage for S21 gear fairing


 
Feb 23, 2022     Misc       Category: Fuselage
Drilled all holes in boy cowl top skin to#30. Drilled glareshield downtube covers in place. Drilled ground plane tabs for nutplates.


 
Feb 22, 2022     Visor       Category: Fuselage
Made spacers for tailwheel and installed. Fit visor and drilled.


 
Feb 21, 2022     Misc       Category: Fuselage
Turned fuselage upright. Installed brake cylinders onto rudder pedals. Installed brake line fittings onto master cylinder. Used Loctite 567 for sealant.


 
Feb 20, 2022     Gear       Category: Fuselage
Finished trimming gear leg fairings. Installed tires onto wheels. Installed wheels onto gear legs.


 
Feb 19, 2022     Gear       Category: Fuselage
Trimmed landing gear fairings to size and to fit over gear. Determined location and size of mounts for fairings. Will weld tabs onto fuselage tubes for mounting fairing on rearward side. Determined location for mounting ground planes for ADSB and Transponder antenna. Determined size and location of mounting tabs. Will weld these to fuselage tubes for mounting the ground planes.


 
Feb 17, 2022     Gear       Category: Fuselage
Drilled rt. gear spacer bushing to size. Test fit rt gear leg. Drilled seat belt attachments to final size.


 
Feb 16, 2022     Gear Category: Fuselage
Drilled gear spacers to size. Test fit left gear.
 
Feb 15, 2022     Misc Category: Fuselage
Drilled lower engine mount holes to size in firewall. Back drilled thru engine mount fittings on firewall. Routed elevator trim wire in fuselage. Turned fuselage over for gear fitting.
 
Feb 14, 2022     Autopilot       Category: Fuselage
Positioned, drilled and installed autopilot mounts.


 
Feb 13, 2022     Boot cowl Category: Fuselage
Drilled rt side cowl attach strip to boot cowl. Drilled bottom cowl attach pieces in place. Starting to position and determine how to install autopilot mounts.
 
Feb 12, 2022     Boot cowl Category: Fuselage
Aligned and drilled leet side boot cowl piece for cowl attach.
 
Feb 11, 2022     Boot Cowl       Category: Fuselage
Drilled bottom skin to firewall. Drilled top skins at overlap and on the side where they contact side skins.
Drilled door stop at new location to check door latching operation.


 
Feb 10, 2022     Boot Cowl       Category: Fuselage
Drilled boot cowl to firewall at top and side skins.
Installed door latch. Doesn't work correctly as the latch moves forward it hits the stop and the nut holding the know contacts the fuselage tube. After researching the issue there was a revision to the drawings since our kit was shipped. It moves the latch stop up a half inch.


 
Feb 09, 2022     Boot cowl       Category: Fuselage
Started installation of door locking mechanism. Realigned top boot cowl. Instrument panel has a slight bow even prior to boot skin install. Adjusted boot cowl for equal spacing left to right. Clamped in place. Ready to drill to firewall.


 
Feb 08, 2022     Boot cowl Category: Fuselage
Aligning top boot cowl and firewall spacers. Instrument panel has a slight bow from alignment of to boot cowl. Need to adjust boot cowl to straighten instrument panel. Misc work on doors.
 
Feb 07, 2022     Boot cowl Category: Fuselage
Positioned spacer strips to cowl.
 
Feb 05, 2022     Doors Category: Fuselage
Sanded and polished edges of lexan. Trimmed door fairings to size. Drilled rivet holes to larger size for expansion. Doors are ready to rivet
 
Feb 03, 2022     Door       Category: Fuselage
Trimmed lexan to size. Checked for clearance at center bow where top and bottom meet. Cut center retainer extrusion to size and shape and drilled to door frame. Test fit doors on fuselage.


 
Feb 01, 2022     Door       Category: Fuselage
Trimmed for lexan for clearance at door center tube. Cut extruded channel to fit between fairings at center tube. Drilled in place. Drilled upper and lower lexan to left door. Marked for trimming.


 
Jan 31, 2022     Door Category: Fuselage
Marked and drilled upper door frame per the drawings. Clecoed upper lexan in place and drilled lexan to upper door tube. Marked all lexan around door perimeter and center tube. Trimmed lexan to size. Reinstalled lexan and marked additional trimming needed at door center tube.
 
Jan 30, 2022     Door       Category: Fuselage
Drilled lower lexan to door frame. Drilled upper lexan to door frame sides.


 
Jan 28, 2022     Door       Category: Fuselage
Drilled door trim to both doors. Trying to figure out how to replace the lower lexan window with aluminum.


 
Jan 27, 2022     Doors Category: Fuselage
Aligned and clamped door trim in place.
 
Jan 26, 2022     Upholstery       Category: Fuselage
Installed seat upholstery on both seats


 
Jan 25, 2022     Doors       Category: Fuselage
Measured door bow as instructed in manual. Adjusted to get correct dimension. Placed doors in position to check fit. Drilled upper inside fairing to top door frame tube. Cut to length and filed edges smooth.


 
Jan 24, 2022     Boot cowl Category: Fuselage
Clecoed top boot cowl to instrument sub panel. Starting to layout firewall spacers.
 
Jan 23, 2022     Boot cowl Category: Fuselage
Drilled right skin stiffeners to skin. Marked stiffeners for 2 inch rivet spacing between tabs and drilled to skin. Trimmed forward edge of floorboard flanges to clear floor stiffeners. Filed instrument sub panel at tab locations to clear welds allowing panel to sit flush on tabs. Reposition fuselage in shop for better access to boot cowl.
 
Jan 21, 2022     Boot cowl       Category: Fuselage
Aligned and drilled right skin to fuselage. Used cargo straps to pull skin into position.


 
Jan 20, 2022     Boot cowl Category: Fuselage
Fabricated and drilled bottom and left boot cowl reinforcement angles to tabs. Used strap clamps and pulled skin around firewall and into bottom skin. Drilled tabs to bottom skin.
 
Jan 19, 2022     Boot cowl Category: Fuselage
Aligned left side boot cowl skin. Unable to line up on centerline of station 2 as per the manual. The 2 tabs by the landing gear mount did not have enough edge distance. Moved skin back on station 2 to obtain enough edge distance. When aligning with the station 2 tube the top of the skin is not parallel with top tube. Drilled skin to tabs
 
Jan 18, 2022     Firewall Category: Fuselage
Drilled firewall to fuselage tabs. Aligned bottom boot cowl skin to fuselage. Needed to open up hole around nose gear fitting to shift skin laterally in order to center on fuse. Ready to drill.
 
Jan 17, 2022     Firewall       Category: Fuselage
Initial fit of firewall. Firewall placed with 1/4" bolts at engine mount. Used angles on fuselage side to set side to side location. Installed bottom boot cowl skin to set vertical location.


 
Jan 15, 2022     Flap       Category: Fuselage
Drilled elevator yoke to pushrod. Bolted in place. Assembled flap handle assembly.


 
Jan 13, 2022     Seats       Category: Fuselage
Started assembly of fuel shut off valve. Attempted to install seat sliders. However, if installed per drawings and manual the seat back will contact station 2A prior to the seat stop with pin in lower hole. Emailed RANS and they started to use most forward hole location for pin. Drilled and riveted slider tracks to this dimension


 
Jan 12, 2022     Tank Category: Fuselage
Drilled header tank for fuel fittings.
 
Jan 11, 2022     Seat rails       Category: Fuselage
Finally got the 2 final nutserts installed in fuselage tubing. There was no access due to the diagonal tubing. Installed seat rails onto fuselage tubing. Made spacer for control column attachment.


 
Jan 07, 2022     Tank Category: Fuselage
Aligned and drilled upper baggage cargo net closeout in place. Installed 10-32 nutserts to bottom seat tubes. Installed, drilled and riveted header tank mount in place. Glued rubber channel to track mount.
 
Jan 03, 2022     Baggage Category: Fuselage
Deburred baggage stiffeners. Riveted to front and aft floors.
 
Jan 01, 2022     baggage Category: Fuselage
Notched forward and aft baggage floor stiffeners to shape. Drilled stiffeners to their respective positions.
 
Dec 31, 2021     Seats Category: Fuselage
Finished fabrication of seats. When countersinking seat side plates only do 1 side. The other side will get nuts on the bolts therefore the holes don't need countersunk. Drilled seat tracks to bottom of fuselage tubing.
 
Dec 29, 2021     Control stick Category: Fuselage
Finished assembly of control sticks. Drilled 1/4" hole on inboard pilot stick for wire exit. Greased bearings and control stick shaft. Assembled and tightened. Started assembly of elevator control tubes.
 
Dec 25, 2021     Control Stick       Category: Fuselage
Assembled control sticks per the drawings. Started fabrication of seats.


 
Dec 23, 2021     Aft baggage       Category: Fuselage
RANS responded to our email and stated it is ok for side panels to be high across the station 3 bullhead. Therefore, we proceeded to drill baggage area in place.


 
Dec 22, 2021     Baggage       Category: Fuselage
Fabricated aft wall and floor stiffeners. Initial fit of baggage compartment. Side walls line up with tube as per drawings but bottom flange is 5/16 off station 3 tube. Emailed RANS about this.


 
Dec 21, 2021     Baggage Category: Fuselage
Installed nutplates for forward floor. Initial fit of rear baggage area.
 
Dec 20, 2021     Floor board       Category: Fuselage
Aligned front floorboard parallel with front tube and seat tube. Drilled in place. Had to notch flange to clear tubing.


 
Dec 19, 2021     Rudder Pedals       Category: Fuselage
Placed engine on the engine stand. Drilled trim tab halves together and riveted at the locations called out. Holes where left open where the hinge lock rib will be installed. Installed rudder pedals to the rudder weldments.


 
Dec 16, 2021     Rudder pedals       Category: Fuselage
Fabricated rudder pedals.
Drilled leading edge of trim tab skins. Used weights to hold level on table while drilling.


 
Dec 14, 2021     ELT       Category: Fuselage
Installed finished ELT mount. Secured to tubing with Adel clamp. Riveted window frames in place. Gathering parts for elevator trim tab assembly.


 
Dec 14, 2021     Window frames Category: Fuselage
Aligned and drilled rt. window frame in place. Started to fabricate ELT mount.
 
Dec 13, 2021     Window frames Category: Fuselage
Aligned and drilled rt. window frame in place. Started to fabricate ELT mount.
 
Dec 12, 2021     Mounts       Category: Fuselage
Riveted com mount in place. Installed ELT mount. Riveted vertical fin rib in place. Determined mounting bracket for ELT antenna in order to place inside fuselage. Fitting window frame.


 
Dec 11, 2021     Bottom Stringers Category: Fuselage
Fabricated and installed all bottom stringers.
 
Dec 09, 2021     Stringers Category: Fuselage
Continued to fit left middle stringer. Fabricated spaces as needed from delrin rod. Secured stringer to fuselage with safety wire.
 
Dec 08, 2021     Stringers       Category: Fuselage
Cut and fit rt mid and lower stringer. Made spacers for mid stringer and installed stringers Installed left lower stringer. Initial cut and fit of left mid stringer


 
Dec 07, 2021     Stringer       Category: Fuselage
Fit top stringer in place. Marked locations of fuselage standoffs and drilled stringer. Drilled for safety wire and installed.


 
Dec 06, 2021     Painting Category: Fuselage
Finished painting of the cockpit area.
 
Dec 05, 2021     Paint Category: Fuselage
Continue painting the cockpit area. Using Rust-Oleum
 
Dec 04, 2021     Paint Category: Fuselage
Started to paint cockpit area. Using Rust-Oleum Smoke Gray
 
Dec 03, 2021     Shop       Category: Wings
Moved work tables out of shop. Brought fuselage into so and organized.


 
Dec 02, 2021     Struts Category: Wings
Finished drilling all strut bracket to strut. Deburred holes and riveted in place.
 
Dec 01, 2021     Aileron/Strut Category: Wings
Finished right aileron. All control surfaces complete. Started on struts. Marked centerline of holes. Aligned 1 strut bracket and drilled to strut.
 
Nov 30, 2021     Aileron Category: Wings
Started right aileron
 
Nov 29, 2021     Aileron Category: Wings
Finished left aileron
 
Nov 28, 2021     Aileron Category: Wings
Started left aileron
 
Nov 27, 2021     Flap Category: Wings
Drilled skin to leading edge. Deburred holes. Riveted together. Flap complete
 
Nov 26, 2021     Right Flap Category: Wings
Started assembly of Rt. Flap. Riveted flap hinges and control actuator onto ribs. Installed ribs into skin and aligned flap so 0 twist. Drilled bottom skin ribs. Riveted top and bottom skin to ribs.
 
Nov 24, 2021     Flap       Category: Wings
Turned flap over and checked for twist. Drilled skin to ribs using pilot holes. Aligned marked centerline of rib in skin pilot hole for drilling. Riveted flap together.


 
Nov 23, 2021     Flap       Category: Wings
Riveted flap hinges to ribs. Made a .020 aluminum cover for end ribs to cover opening in end rib. Marked centerlines on ribs. Assembled flap. Ready to measure for twist and drill skin to ribs


 
Nov 22, 2021     Flap Category: Wings
Pressed in bushings for flap hinges. Studied plans for flap assembly.
 
Nov 21, 2021     Flap       Category: Wings
Moved completed wing to storage. Set up shop for flap and aileron build. Bent leading edge skins of flap and ailerons.


 
Nov 20, 2021     Tank       Category: Wings
Reinstalled gas tank in wing. Riveted root rib into place. Prosealed tank to skin.


 
Nov 18, 2021     Tank       Category: Wings
Drilled tank vent hole. If following directions to drill after flange is installed there is a risk of drilling into the threaded hole. Doing this now eliminates drilling into gas cap vent flange hole. Cleaned out tank by vacuuming. Installed gas cap flange with Proseal.


 
Nov 17, 2021     Tank       Category: Wings
Drilled gas cap flange, sight gauges, and fuel line locations. Installed sight gauges tank fittings and fuel line fitting. Used blue locktite to secure.


 
Nov 16, 2021     Riveting Category: Wings
Finished riveting bottom skin. Wing is ready to turn upright for fuel tank install.
 
Nov 15, 2021     Riveting Category: Wings
Continued to rivet bottom skin ribs. Stopped 4 holes from trailing edge in order to drill. Drilled bottom skin trailing edge to rear spar. Deburred all holes.
 
Nov 14, 2021     Countersink       Category: Wings
Countersunk bottom leading edge of spar. Riveted spar, tank stiffeners, and ribs up to rear stringer on bottom skin.


 
Nov 13, 2021     Primer Category: Fuselage
Finished priming fuselage. Deburred and dimpled bottom leading edge of skin.
 
Nov 12, 2021     Spar - (1 hour)       Category: Wings
Checked spar for twist from root to tip. Clecoed bottom skin in place. Drilled skin to lower front spar. Finished sanding fuselage tubing.


 
Nov 11, 2021     Stringers Category: Wings
Trimmed rear stringer to clear spar truss. Polished edges and deburred stringers. Primed another bag on fuselage.
 
Nov 10, 2021     Blasted       Category: Fuselage
Finished bead blasting all fuselage tubing clusters. Aligned wing and set level for bottom skin install. Cut bottom stringers to size.


 
Nov 09, 2021     Blast Category: Fuselage
Bead blasted all tabs and clusters in cockpit area
 
Nov 07, 2021     Prime Category: Fuselage
Continue to prime fuselage
 
Nov 06, 2021     Prep Category: Fuselage
Sanded tubing in cockpit area for primer.
 
Nov 05, 2021     Sanding Category: Fuselage
Continue to sand tubes in preparation for primer. Riveted flap and aileron gap seals in place.
 
Nov 04, 2021     Primer Category: Fuselage
Finished primer bay. Started to blast next bay.
 
Nov 03, 2021     Primer Category: Fuselage
Starting to prime area bead blasted
 
Nov 02, 2021     Bead blasted       Category: Fuselage
Starting to bead blast fuselage. Blasted first bay.


 
Nov 01, 2021     Rt wing Category: Wings
Deburred aileron and flap gap seals. Reinstalled. Ready to rivet
 
Oct 31, 2021     Rt wing       Category: Wings
Finished riveting to skin up to rear spar.
Cut gap seals to fit. Aligned and drilled gap seals.


 
Oct 30, 2021     Rt Category: Wings
Riveted stringers to top skin. Riveted leading edge.
 
Oct 29, 2021     Spar Category: Wings
Drilled skin to leading edge spar. Deburred and dimpled. Countersunk spar. Ready to rivet.
 
Oct 28, 2021     Top skin Category: Wings
Placed top skin in place ton right wing. Aligned skin with leading and trailing edges to square wing. Clamped skin in place for drilling.
 
Oct 27, 2021     Skins Category: Wings
Used delrin leading edge forming tool to bend top and bottom skins for rt. wing.
 
Oct 26, 2021     Bellcranks       Category: Wings
Installed aileron and Bell tank. Secured bolts with safety wire.


 
Oct 25, 2021     Rt Category: Wings
Riveted ribs to rear spar.
 
Oct 24, 2021     Rt. Wing       Category: Wings
Drilled flap and aileron brackets to ribs. Drilled flap teleflex cable bracket to rib. Deburred all holes and riveted in place. Installed truss to front and rear spar. Clecoed all ribs to spars. Ready to rivet in place.


 
Oct 23, 2021     Rt wing       Category: Wings
Riveted spar gussets in place. Aligned landing light in cutout. Marked and drilled brackets to spar. Cleaned and polished edges. Riveted to spar. Drilled strut fittings to wing truss.


 
Oct 19, 2021     Tank       Category: Wings
Installed tank into left wing. Installed root rib. Used Paracord in ends of tank stiffeners to raise up so rib can slide between skin and stiffeners. Removed Paracord when rib in place. Prosealed skin to tank at gas cap flange.


 
Oct 18, 2021     Tank Category: Wings
Pressure checked tank. Placed balloon over vent and inflated tank to 2 psi. Sprayed soapy water on all fittings to check for leaks. After 4 hrs balloon still inflated.
 
Oct 17, 2021     Tanks Category: Wings
Determining how to pressure check tank. Will inflate to 1 or 2 psi with Vans pressure fitting. Will place inflated balloon over vent. Watch for balloon to deflate.
 
Oct 16, 2021     Tank       Category: Wings
Used gas cap flange as a pilot and drilled vent hole location. ProSealed gas cap flange in place.


 
Oct 15, 2021     Tank       Category: Wings
Drilled sight gauge holes. Vacuumed tank of drill shavings. Installed fuel fittings.


 
Oct 12, 2021     Tank Category: Wings
Drilled fuel pickup hole. Marked hole locations for sight gauge.
 
Oct 11, 2021     Tank Category: Wings
Drilled 3" hole for fuel tank cap fitting.
 
Oct 10, 2021     Tank       Category: Wings
Installed fuel tank. Centered fuel cap in skin opening. Marked for drilling. Used tank alignment jig and drilled to tank.


 
Oct 07, 2021     Wing Category: Wings
Finished riveting left bottom wing skin.
 
Oct 05, 2021     Riveting Category: Wings
Started to rivet bottom wing skin in place. Riveted bottom fuel tank stiffeners in place.
 
Oct 04, 2021     Cleco Category: Wings
Secured wiring for landing lights and pitot tube lines. Drilled and installed OAT sensor.
Clecoed bottom skin into position
 
Oct 03, 2021     Stiffeners Category: Wings
Riveted stiffeners to bottom skin
 
Sep 26, 2021     Pitot       Category: Wings
Count mount bracket to accept pitot mast. Cut template to match. Clecoed into position. Ready to verify placement then drill skin.


 
Sep 24, 2021     Pitot Category: Wings
Marked template for hole spacing and transfer drilled to bracket. Marked bracket for pitot mast cutout.
 
Sep 23, 2021     Gretz Mount Category: Wings
Fabricated pilot mast mount from 0.042 2024T3 aluminum. Drilled to rib flush with skin. Made template to stimulate bracket. Will use this to drill holes into bracket and skin.
 
Sep 22, 2021     Spars Category: Wings
Countersinking the bottom of leading edge spar.
 
Sep 21, 2021     Spars Category: Wings
Used bottom skin pilot holes to drill leading and trailing edge spars.
 
Sep 16, 2021     Bottom skin       Category: Wings
Turned wing over and leveled. Cut stringers to length and notched to clear strut brace. Placed soon on position. Preliminary thoughts on how to mount pitot tube


 
Sep 15, 2021     Wing       Category: Wings
Fabricated wing saddle. Secured to bench. Flipped wing over.


 
Sep 13, 2021     Riveting       Category: Wings
Riveted remainder of wing and gap seal. Top of wing completed.


 
Sep 12, 2021     Gap seals       Category: Wings
Drilled gap seals to wing trailing edge. Deburred spar and gap seals. Cut out gap seals for pushrod exit. Wing is ready to finish rivet.


 
Sep 11, 2021     Gap seals Category: Wings
Cut off gap seal tabs per the plans. Initial fit of gap seals
 
Sep 10, 2021     Leading edge Category: Wings
Dimpled skin leading edge. Countersunk spar to match.
 
Sep 10, 2021     Leading edge Category: Wings
Dimpled skin leading edge. Countersunk spar to match.
 
Sep 09, 2021     Drill       Category: Wings
Drilled skin to leading edge spar.


 
Sep 08, 2021     Stringers Category: Wings
Cut stringers to size. Riveted stringers to to wing skin
 
Sep 07, 2021     Misc Category: Wings
Squared up the wing using the skin as a guide. Aligned skin corners with spars and ribs until square. Clamped wing in place.
 
Sep 06, 2021     leveling Category: Wings
Used a digital lever to adjust the wing for no twist. Clamped spars into place. Riveted left landing light to brackets.
 
Sep 05, 2021     Skins       Category: Wings
Used delrin leading edge fourth block to shape leading edge on to and bottom skins of left wing. Ran all wires for left wing. Put a wire sleeve over wires at ribs 1 and 2.


 
Sep 04, 2021     Landing lights Category: Wings
Used left wing landing light brackets to make another set for right wing.
 
Sep 03, 2021     Landing lights       Category: Wings
Drilled nutplates to landing light brackets. Cut brackets to final size.
Drilled landing light brackets to spar.


 
Sep 02, 2021     Wing       Category: Wings
Bead blasted doors and primed. Checked that all items were completed in preparation for skinning wing. Continued to work on landing light mount. Drilled 3/4" angle to the circuit boards on the FlyLed lights. Drilled these to the mounts and positioned in spar cutout.


 
Sep 01, 2021     Bellcranks       Category: Wings
Safety wired aileron and flap bellcrank bolts. Drilled a hole in rib to use as safety wire connection point. Installed aileron cable and safetied cable to bellcrank per installation instructions. Ran wires for landing lights and position lights. Waiting on delivery of magnatometer and OAT probe from GRT Avionics. Will run these wires when receive. Drilled ribs for grommets and ran pitot and AOA tubing. Made landing light brackets from 0.040 aluminum.


 
Aug 31, 2021     Bellcranks Category: Wings
Installed Flap and Aileron bellcranks
 
Aug 30, 2021     Rear Spar Category: Wings
Riveted rear spar in place.
 
Aug 29, 2021     Ribs       Category: Wings
Leveled wing build table. Drilled and riveted flap and aileron hinges onto the ribs. Drilled out location holes in the ribs to 1/4" for bellcrank attachment. Clecoes wing ribs to the front spar.


 
Aug 28, 2021     Bushings       Category: Wings
Installed bushings into flap and aileron hinges. Bolted wing truss onto front spar.


 
Aug 26, 2021     Strut Attach Category: Wings
Match drilled the strut truss brackets to the strut truss.
 
Aug 25, 2021     bellcrank       Category: Wings
Final assembly of flap bellcrank assembly. Added pushrod tubes to aileron and flap bellcranks. Drilled 1 hole on lift strut brackets to 1/4 and the attach hole to 7/16.


 
Aug 24, 2021     Bellcranks       Category: Wings
Initial installation of flap bellcrank components.


 
Aug 23, 2021     Spars       Category: Wings
Cut out landing light openings in leading edge spars. Polished edges. Installed bearings in flap and aileron bellcranks. Installed aileron bellcranks to support tubes. Used loctite and safety wire to secure bolt.


 
Aug 19, 2021     Landing lights       Category: Wings
Used template to mark outline of landing light lense cutout. Drilled corner holes.
Arranged aileron and flap components for assembly.


 
Aug 18, 2021     Reaming Category: Wings
Reamed spar attach to .374. Test fit bolt. No play noticed
 
Aug 17, 2021     Spar prep       Category: Wings
Drilled main spar wing attach holes. Drilled undersized and will ream to 0.001 under. Fluted all ribs.


 
Aug 16, 2021     Primer Category: Tail Feathers
Primer all tail feathers
 
Aug 15, 2021     Bead blast Category: Tail Feathers
Bead blasted areas of tail feathers that were not cleaned enough.
 
Aug 13, 2021     Spars Category: Wings
Riveted spar reinforcements. Marked spars for rivets that do not get riveted
 
Aug 11, 2021     Spars       Category: Wings
Clecoed spar attachment reinforcements in place. Verified correct length of front spar


 
Aug 09, 2021     Primer Prep Category: Tail Feathers
Sanded left elevator for primer. Reorganized hangar
 
Aug 08, 2021     Primer prep Category: Tail Feathers
Sanded rt elevator for prep. Bead blasted elevator and stabilizers for primer.
 
Aug 07, 2021     Primer Category: Tail Feathers
Applied primer to rudder using down brush. Using Southern Polyurethanes epoxy primer
 
Aug 07, 2021     Primer Category: Tail Feathers
Applied primer to rudder using foam brush.
 
Aug 06, 2021     Prep Category: Tail Feathers
Bead blasted rudder welds and areas where couldn't sand.
 
Aug 05, 2021     Primer prep Category: Tail Feathers
Sanded a few more areas on stabilizers to get to bare metal. Sanded rudder.
 
Aug 04, 2021     Prep Category: Tail Feathers
Sanded stabilizers to remove welding scale and oxidation for priming.
 
Jul 19, 2021     Inventory Category: Research
Today we finally finished inventorying the kit. Will start construction after Oshkosh
 
Jul 17, 2021     Inventory       Category: Research
Continuing the inventory. About 1/2 way done with the small parts box.


 
Jul 16, 2021     Spars       Category: Wings
All the large pieces have been inventoried. Today we started inventory all the small bags and hardware. There is a lot of bags.
Deburred the front and rear spars. Degreased the spars.


 
Jul 14, 2021     Inventory Category: Research
Continuing to inventory all kit pieces
 
Jul 13, 2021     Inventory Category: Research
Started to inventory the kit.
 
Jul 12, 2021     Inventory       Category: Research
Removed all components from shipping crate. Took crate apart and made a storage box to hold parts.


 
Jul 11, 2021     Kit Arrival       Category: Research
Kit was delivered today


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.