Project: RansS20.5RP   -  
            Listing for Category : firewall
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Paul Lutz   -  
Project:   Rans S-20.5 Raven   -   VIEW REPORTS
Total Hours:23.7
Total Flight Time:
Total Expense:N/A
Start/Last Date:Jul 11, 2021 - No Finish Date
Engine:Lycoming O235
Propeller:Catto
 
Friendly URL: https://eaabuilderslog.org?s=RansS20.5RP

Home or Last Project Picture

May 03, 2024     Misc - (0.5 hour) Category: Firewall
Installed insulated boots to positive side of battery connectors at battery, master and starter relays. Secured cable on arm of cabin air box. Filed a bevel to right door handle contactor plate to let the locking mechanism sllide over the fuselage tubing easier.
 
Apr 17, 2024     Mount Category: Firewall
Drilled new holes in mount plate due to the threaded rod being in the way of the tubing. Reassembled jig with 1 degree right offset. Started to place tubes into position
 
Apr 15, 2024     Mount - (0.75 hour) Category: Firewall
Removed engine from firewall. Removed u-brackets from mount and secured to engine mount jig.
 
Apr 14, 2024     Mount Category: Firewall
Verified dimensions of firewall holes. Drilled mount. Marked location of engine mount plate on jig and drilled thru plate onto firewall plate. The engine plate is offset to the left due to the 1 degree right thrust
 
Mar 25, 2024     Fittings - (1 hour) Category: Firewall
Drilled out bulkhead eyeball pass thru fitting to fit mixture and throttle cables. Installed fittings. Emailed VR3 engine mount drawing with new dimensions.
 
Dec 28, 2023     Mount Category: Firewall
Tack welded a few more tubes in place
 
Sep 12, 2022     Cabin heat       Category: Firewall
Drilled cabin heat box to firewall. Tried to mount GRT autopilot servis to mount but doesn't fit. RANS mount must be specific to Garmin.


 
Jul 13, 2022     Firewall Category: Firewall
Marked firewall locations for all holes that need drilled.
 
Jun 10, 2022     Brake       Category: Firewall
Drilled brake reservoir to firewall. Used S21 firewall drawings for location. Drilled thru tab and firewall for brake line T fitting and installed.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.