EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RansS20.5RP
-
Listing for Category : tail feathers
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (473)
Research
- (6)
Workshop
- (1)
Empennage
Fuselage
- (191)
Firewall
- (9)
Tail Feathers
- (9)
Wings
- (109)
Controls
- (2)
Avionics
- (57)
Lighting
Instrument Panel
- (23)
Landing Gear
- (1)
Engine
- (49)
Propeller
Fuel System
- (1)
Interior Finish
- (8)
Paint / Decals
- (7)
Inspection
Tools
Builder Name:
Paul Lutz
-
Project:
Rans S-20.5 Raven
-
VIEW REPORTS
Total Hours:
23.7
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Jul 11, 2021 - No Finish Date
Engine:
Lycoming O235
Propeller:
Catto
Friendly URL:
https://eaabuilderslog.org?s=RansS20.5RP
Home or Last Project Picture
Aug 16, 2021
Primer
Category: Tail Feathers
Primer all tail feathers
Aug 15, 2021
Bead blast
Category: Tail Feathers
Bead blasted areas of tail feathers that were not cleaned enough.
Aug 09, 2021
Primer Prep
Category: Tail Feathers
Sanded left elevator for primer. Reorganized hangar
Aug 08, 2021
Primer prep
Category: Tail Feathers
Sanded rt elevator for prep. Bead blasted elevator and stabilizers for primer.
Aug 07, 2021
Primer
Category: Tail Feathers
Applied primer to rudder using down brush. Using Southern Polyurethanes epoxy primer
Aug 07, 2021
Primer
Category: Tail Feathers
Applied primer to rudder using foam brush.
Aug 06, 2021
Prep
Category: Tail Feathers
Bead blasted rudder welds and areas where couldn't sand.
Aug 05, 2021
Primer prep
Category: Tail Feathers
Sanded a few more areas on stabilizers to get to bare metal. Sanded rudder.
Aug 04, 2021
Prep
Category: Tail Feathers
Sanded stabilizers to remove welding scale and oxidation for priming.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.