Project: RansS20.5RP     -     Entry

Jan 31, 2022 Door Category: Fuselage
Marked and drilled upper door frame per the drawings. Clecoed upper lexan in place and drilled lexan to upper door tube. Marked all lexan around door perimeter and center tube. Trimmed lexan to size. Reinstalled lexan and marked additional trimming needed at door center tube.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.