Project: wstoelting     -     Project Summary     - Optional PDF document function     - Multi-sectional PDF
Entry Titles Only           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
395     May 10, 2024 SportEX EFIS Avionics $2366.00    2   
Received GRT SportEX EFIS and Outside Air temperature probe. Did initial panel fit check. Now the wiring has to be completed.
 
394     May 05, 2024 Trailered to New Montana Home Fuselage 11 $0.00    3   
My friend, Eric loaned his trailer for me to transport my plane to our new home in Montana. Can finally get back to building.
 
393     Apr 29, 2024 Travel Struts Wings 1.5 $0.00    2   
Preparing airplane for trailer transporting to Montana. Removed front leading edge spar pins, and rotated wings back. Fabricated wing travel support/secure struts from 1/2 square tubing. Secured wings for trailering.
 
392     Apr 26, 2024 Cable Pulleys on Wings Controls 3 $0.00    2   
Located and installed left and right aileron pulleys with cable keepers (4 places). Installed flap control pulleys and cable keepers (2 places). Installed cover/closeout plates.
 
391     Apr 24, 2024 Jury Strut Install Wings 3 $0.00    1   
Located and drilled jury strut holes in weldment and the bracket straps that attach jury strut to wing struts. Painted brackets. Fastened in place with hardware.
 
390     Feb 26, 2024 Mounted Propeller Propeller 1 $0.00    1   
Installed propeller. Used hardware torque info from Kyiv Propeller USA website 18 ft-lbs. Set ground adjustable pitch with gauge provided by NR Prop. Installed propeller without nose cone backing plate for initial engine runups and then will retorque the pitch adjustment screws. Then remove hub to install backing plate.
 
389     Feb 05, 2024 Vinyl Wrap Kickpanels and Turtledeck Fuselage 4 $65.00    3   
Ordered vinyl wrap for kickpanels and turtle deck from Amazon. The orange color and gloss may not match perfectly with airplane paint but adequate. ViVid brand. I am trying to minimize further painting effort due to current Temps, and no more paint booth.
 
388     Jan 24, 2024 Installed Wings Wings 4 $0.00    2   
Moved plane and wings from garage to hangar. Installed wings after arriving at hangar. Still have a few hardware installation fixes but it sure looks like a plane now.
 
387     Jan 02, 2024 Electrical Supplies Instrument Panel $120.14    1   
PIDG ring connectors, toggle switches, 20ga wire, 22ga wire, 2 conductor and 3 Co ductor shielded wire...
 
386     Jan 01, 2024 Windshield Fuselage 6 $0.00    2   
Rough cutout the windshield. This is the second attempt as I undercut the first one. Afterwards, made further precision trimming and drilled mounting holes, sanded smooth edges.
 
385     Dec 26, 2023 Engine Cowling Fuselage 9 $36.00    3   
Fiberglassed inner lower Radiator ducting. Shortened up scoop inlet, clecoed in place, checked fit on airplane, then used epoxy to secure. Next up is finishing with filler then primer.
 
384     Dec 15, 2023 Start your engine! Engine $0.00    1   
Yahoo! Starting after 3 and half years. Video would not save. Saved to YouTube.
https://youtu.be/RITszWDpqu4?feature=shared
 
383     Dec 14, 2023 Battery Charger Tools $72.98    1   
The Lithium Phospate battery requires a charger other than the traditional lead acid type.
 
382     Dec 11, 2023 Panel Finishing Instrument Panel 4 $25.00    3   
Vinyl wrapped the dash, Dymo labeling. Fit radio chassis, EIS unit, cut holes for vents.
 
381     Dec 03, 2023 Spider of Wires Instrument Panel 3 $0.00    1   
Continue to make Wire connections and route to panel. These wires are for Master, auto tune, ignition, fuel pumps, start, landing and heater. Still need to route Nav/Strobe and interior light.
 
380     Nov 19, 2023 Battery Cable Instrument Panel .5 $26.15    1   
Positive battery cable from battery to main relay. #6 gauge Wire, ring terminals, relay diode. $13 in Wire stuff, rest is shipping cost. Installed cable and diode on relay, routed to battery.
 
379     Oct 31, 2023 Switcheroo Instrument Panel $72.83    1   
Time to get the Instrument Panel switches placed and installed. The cost sure adds up, taxes, shipping and etc.
 
378     Oct 21, 2023 Wires, Connectors, Light, Sleeving... Instrument Panel $183.67    4   
Time to get on with the wiring. Purchased 100 ft of 22 gauge & 20 & 6 ft of 10 gauge, plus Pidg ring terminals, and rubber boots, 100 ft of .25 in Dia sleeving, plus clear heat shrink for labels. Also an interior light having both red and white LED.
 
377     Sep 24, 2023 Battery Contactor & Starter Relay Firewall 1 $0.00    1   
Found a place to locate the battery contactor and starter solenoid/relay on the cabin side of firewall. Trying to tuck things clear of the rudder pedals. Drilled firewall and installed rivnuts to locate components.
 
376     Sep 23, 2023 Canopy Glass Fuselage 4 $0.00    1   
Cut, trimmed, drilled Lexan. Aligned and fitted, located Rivet mounting holes. Tried to apply tinting film prior to mounting but learned that was the wrong approach. Scrapped tinting. Riveted overhead "glass" in place.
 
375     Sep 02, 2023 Access Door Interior Finish 2 $0.00    3   
Decided to install door into aft baggage compartment wall where I can gain access to stowed tool kit.
 
374     Sep 01, 2023 Door Install Fuselage 2 $0.00    2   
Doors were placed into position and hinge pins installed. Installed gas struts. Door latches were modified by threading ends for turn knots. Much better look and feel than the welded hoop.
 
373     Aug 27, 2023 Exhaust Pipe Engine 2 $130.00    1   
Needed to fabricate exhaust pipe connection between header collector and mounted muffler. Ordered 2in elbow, 2 inch straight pipe, 2 to 2.5 adapter, band clamp, and sleeve clamp. Had a local guy weld up the 304 stainless pipe.
 
372     Aug 26, 2023 Heater Outlets Instrument Panel 2 $12.00    2   
Found two Outlets from Miata dash at Pick-a-Part. Used SolidWorks to model spuds for hose connection. Had friend 3d print the parts. Turned out great. Now need to mount in panel.
 
371     Aug 22, 2023 Rock Guard Fuselage .5 $15.75    2   
Used Harvey black pipe wrap, 10 mil, on my front gear legs and leading edges of horizontal stabilizer.
 
370     Jul 27, 2023 VHF Radio Purchase Instrument Panel $835.00    1   
Purchased a Garmin GTR 200, used, from AWG International.
 
369     Jun 25, 2023 Propeller Spacer Install Engine .5 $40.00    1   
Purchased 10.9 grade 8mm x 1.25 40mm long bolts for spacer to psru installation. Purchased Nordlock washers (25 sets). Torqued down the bolts per in reference to bolt grade.
 
368     Jun 17, 2023 EGT and O2 Sensor Routing Engine 3 $0.00    2   
Drilled holes through electrical tray, routed wires through tray. Mounted O2 Module, tightened thermal couple's to headers, drilled large hole through firewall, fabricated firewall bundle seal. Wired thermal couple's to connectors and installed.
 
367     May 30, 2023 Throttle Cable Instrument Panel .5 $140.00    1   
The previous cable install was with spiral wire cable which is satisfactory for pull, put not pushing. Have you ever pushed a rope? Ordered and installed a solid wire type.
 
366     May 16, 2023 Propeller Spacer Propeller $435.00    1   
Saber mfg 4" spacer and hardware.
 
365     May 07, 2023 Control Stick Collector Covering Interior Finish 3 $30.00    2   
Redid the decorative interior covering, removing my vinyl fabric covering and used abs plastic sheet instead. Used Heat gun for forming a bend. Made cutouts where appropriate. Overall a better finish and more robust.
 
364     May 06, 2023 Muffler Engine 3.5 $5.00    1   
Machined a hanger block from HDPE, tapped end of block for 1/4-20 bolt, cross drilled to mount to fuselage at unuesed landing gear bracket. Purchased rubber isolater, and used left over light mounting bracket at the cabane.
 
363     Apr 11, 2023 Engine Cowling Fuselage 3 $0.00    2   
Trimming Boot Cowl, upper and lower cowling to fit. Lots more to do.
 
362     Apr 09, 2023 Prop spacer Prop Propeller 1 $0.00    1   
Need to simulate spacer which I have not finished yet in order to fit engine cowling.
 
361     Apr 09, 2023 Heater Installation Instrument Panel 3.5 $0.00    1   
Found a location on underside of equipment rack. Disassembled heater to locate mounting holes, rotated heater core to point the hose connections where desired. Now I need to figure out routing and fittings through firewall.
 
360     Apr 05, 2023 Heater Instrument Panel $220.00    1   
Thus plane is going to be flown in the snowy winters of eastern Washington and needs cabin heat. T7 Designs builds this compact little Heater setup. Now need to place behind the panel, route coolant hoses through the firewall, and duct warm air to the pilot and passenger.
 
359     Apr 01, 2023 Landing Light Mounted Lighting .5 $0.00    1   
Decided on installing just one light on the cabane, and I like the looks. Will find out if adequate.
 
358     Mar 28, 2023 Header Engine $1864.00    2   
What a work of art. I decided my fabrication and modification of a Suzuki Sammurai header from Amazon just would not be the most durable and performance way to go. So from a $200 product to a $1800 product seems crazy to me but the right decision for the long run.
 
357     Mar 26, 2023 Decorative Control Stick Covering Interior Finish 2 $0.00    1   
Had Vinyl material, cut to shape, installed gear shift boots, glued backing material to hold shape. Used contact adhesive.
 
356     Mar 25, 2023 Brakes and Wheels Landing Gear 2 $0.00    2   
Installed brake flanges, installed calipers, made lines for linking dual calipers. Installed spacers and then wheels.
 
355     Mar 23, 2023 Wheel Spacers Landing Gear 3.5 $0.00    4   
Needed spacers to mount and align wheel/brake rotor with caliper brake mount. Determined spacer width and so designed up what I desired and machined out of 6061T6 aluminum.
 
354     Mar 11, 2023 Installed Main Gear Landing Gear 1 $0.00    1   
Installed main gear legs and Shock system. Greased bolts for install, used engine hoist to lift airframe. Discovered I did not have Aluminum axle sleeves to space wheel and brake caliper setup. Also determined the garage is no tall enough for me to install the tundra tires.
 
353     Mar 04, 2023 Battery Mount Installation Avionics 1 $12.00    1   
Ordered more AN3-4a and AN3-5a hardware for miscellaneous installations like the battery mount. Positioned, located holes, drilled, deburred, mounted battery mount on electronics tray underside.
 
352     Mar 04, 2023 Master Cylinder Brake Lines Fuselage 1 $20.78    1   
My previous installation had lines too short , moving rudder pedals woul stress the remote master cylinder fittings. Ordered additional brake line material, built longer lines and looped the routing. Operation is improved.
 
351     Mar 04, 2023 Oil Cooler Line Engine 1 $10.00    0   
Received needed AN8 fitting having 90 degree bend. Constructed oil line, included fire sleeve and installed.
 
350     Feb 26, 2023 Coolant System/Expansion Tank Engine 10 $238.61    3   
Fittings, silicone coolant lines, clamps, expansion tank. Had a welder weld one aluminum fitting. Mounted tank to firewall, used rivnuts. Lots of time planning routing and etcetera.
 
349     Feb 24, 2023 Battery Mount Avionics 2.5 $0.00    1   
The battery mount I purchased was sized for EarthX680, the battery I have is a 680C, meaning compact. So fabricated my own mount.
 
348     Feb 02, 2023 Fuel Return Line Fuel System 1 $17.00    3   
After fabricating the supply fuel line from firewall to engine, it was time to make the return line. Purchased fuel rail adapter fitting and then cut hose to length, installed fittings, blew out line with air hose and installed.
 
347     Jan 27, 2023 Coolant Line Couplers Engine $17.00    1   
1 inch diameter coolant line couplers.
 
346     Jan 24, 2023 Engine Management System Engine 3 $0.00    1   
Mounted the ECM, Ignition Control Module, Barometric sensor, fuel pump relays to underside of fabricated tray mount.
 
345     Jan 24, 2023 Radiator/oil cooler remount Engine 2 $0.00    2   
Changed up the mounting of the Radiator and oil cooler to improve routing of coolant and oil lines.
 
344     Jan 20, 2023 Fuel, Oil, Water Engine $126.62    1   
Silicone Coolant line, engine start switch, oil coolant line, fuel fittings.
 
343     Jan 16, 2023 Firesleeve and Fitting Fuel System $31.98    1   
Firesleeve for fuel lines, fitting for coolant expansion tank.
 
342     Jan 15, 2023 Fuel Lines to Firewall Fuel System 2 $0.00    1   
Built two fuel lines for cabin side connecting tubing lines to firewall bulkhead fitting. Located bulkhead fitting locations. Drilled holes in firewall. Fabricated hoses using Summiy braided hose and Summit Racing fittings.
 
341     Jan 11, 2023 Fuel lines Engine $125.00    1   
Fuel line fittings and hoses for firewall forward . Two oil cooler fittings too. Now will cut to length and assemble.
 
340     Jan 11, 2023 Spinner Propeller $0.00    1   
Carbon Fiber Nose Cone arrived from Kyiv Ukraine.
 
339     Dec 24, 2022 Seat Belt Install Interior Finish 3 $0.00    2   
Fabricated 4 cable ties for lap belt attachment. Bolt install of Hooker harness seat belts, left and right seat.
 
338     Dec 18, 2022 NR Prop Propeller $867.63    1   
Ordered propeller in August from NR Prop. Kiev, Ukraine. Roman remains in business during the Russian invasion. His family is temporarily in Poland. Intermittent power outages, shelling and etc slowed him down but he managed to get it finished and delivered. Carbon fiber composite, metal leading edges, aluminum hub. Super light.
 
337     Dec 04, 2022 Throttle Control Engine 5 $10.00    2   
Used some aluminum scrap bar material, and some solid round stock. Purchased some extension springs. Engine throttle cable is pulled to open throttle, pilots push throttle forward to open. The mechanism has a 2 to 4 ratio. Took some effort and a few iterations to make it all work. Will still revise wire rope cable on airplane throttle to music wire.
 
336     Dec 01, 2022 Battery Engine $379.00    1   
ETX680C EarthX LiFePO4 battery for the plane. Lightweight and powerful.
 
335     Nov 24, 2022 Systems Routing Engine 10 $76.00    4   
Routed engine harness through firewall and made connections on engine. Cut, rotated, welded coolant tubes at head to route to low side. Painted orange. Fabricated electronics rack from .040 5053 AL. ECM and many other electronics will attach here.
 
334     Nov 01, 2022 Elevators Tail Feathers 5 $0.00    1   
Installed elevator trim piece by riveting hinge piece to trim. Riveted trim cable bracket in place. Spent way too much time installing elevator to horizontal stab. A bushing for push/pull rod was challenging to place and bolting the two elevator halves together.
 
333     Oct 24, 2022 Flying Wires Tail Feathers 1 $0.00    1   
Installed flying wires to horizontal stabilizer and vertical tail.
 
332     Oct 23, 2022 Tinted Quarter Windows Fuselage 3 $0.00    1   
Added tinting to the aft quarter windows. I think I got carried away with the number of fasteners to install.
 
331     Oct 19, 2022 Firewall and Engine Install Engine 6 $0.00    3   
Cut boot cowl shape on firewall stainless steel sheet, located onto fuselage and drilled mounting holes. Riveted in place with CCP42 rivets. I did apply anticipating tape to tubing prior to firewall installation to minimize metal to metal rattle/buzz. Hoisted engine in place and mounted.
 
330     Oct 19, 2022 Paint Landing Gear Legs Paint / Decals 2 $0.00    1   
Sprayed gear legs with Polybrush and Polyspray on previous days, then sprayed multiple coats of orange. Unlike other parts, I did not first apply one coat of white, curious if I will see a brightness difference in natural light.
 
329     Oct 15, 2022 Painted Fuselage Paint / Decals 8.5 $138.48    2   
Purchased more reducer and some Dakota Black Polytone. Lots of time with masking. Used fine line tape. Got paint on it before Temps drop. So far I have purchased $1333.23 of Polybrush, Polyspray, Polytone, reducer, epoxy primer, blush remover, surface cleaner and etc. Lots of labor with painting. Pumpkin Orange, Dakota Black, and Insignia White.
 
328     Oct 06, 2022 Polyspray on Fuselage Paint / Decals 3 $20.00    1   
Applied crosscoats of UV protection to fuselage. Purchased masking tape and filters.
 
327     Oct 01, 2022 Prepping Fuselage for Paint Paint / Decals 4 $0.00    1   
Took a couple of hours to mask the cockpit and other others I did not want spray on. Then wiped down and tack cloth, then two coats of Polybrush sprayed on. First coat in the morning, second coat late afternoon.
 
326     Sep 11, 2022 Right Wing Paint / Decals 6 $0.00    1   
Painted Right Wing, now will add pinstripe at orange/white edge. Lots of labor with painting.
 
325     Sep 11, 2022 Paint Booth Filters and MEK Tools $60.00    1   
Purchased more filters, have purchased several now, they clog quickly on the exhaust side of paint booth. MEK works the best for keeping the paint gun clean.
 
324     Sep 11, 2022 Flap Springs Wings $100.00    1   
Plane Fun Aircraft now sells these alternative flap springs which perform better than the tension type provided in the kit.
 
323     Aug 31, 2022 VHF Antenna Avionics $140.87    1   
Comment E series Top Mount VHF antenna.
 
322     Aug 17, 2022 Left Wing Paint Paint / Decals 6 $0.00    1   
Paint Pumpkin Orange on leading edge to add some character. Wonder if vinyl pinstripe will remain in place.
 
321     Aug 15, 2022 Oil Cooler Mounting Hardware Engine $6.62    1   
AN4-34a bolts and metal stop nuts to mount oil cooler.
 
320     Aug 09, 2022 Left Wing Paint Coats Paint / Decals 4 $0.00    1   
Applied 2 medium coats and a light coat to get full coverage.
 
319     Aug 09, 2022 More Paint Supplies Paint / Decals $341.35    1   
Another gallon of Insignia White, One gallon of Pumpkin Orange, and a gallon of reducer.
 
318     Aug 05, 2022 Left Wing UV Polyspray Paint / Decals 4.5 $0.00    1   
Sprayed first coat of Polyspray. Sanded lightly imperfections, smoothed out lifted plinking on fabric tapes with iron. Applied additional coats of UV protectant Polyspray.
 
317     Jul 24, 2022 Left Wing Polybrush Spray Coats Paint / Decals 4.5 $0.00    1   
Sprayed two coats of Polybrush on left wing. 1st coat on Saturday, then ironed smooth in plinking tapes that peeled up a bit because of solvents in Polybrush.
 
316     Jul 18, 2022 Landing Lights Lighting $77.06    1   
Lights, Fuse Block, Engine Exhaust Gasket, wire harness for lights.
 
315     Jul 02, 2022 Flaps Painted Paint / Decals 4 $0.00    1   
A couple coats of Insignia White applied. Trim off the fabric identifier ink stamps from fabric before applying, they bleed through the multi coats of Polybrush, Polyspray, Polytone. Dang!
 
314     Jun 26, 2022 Ailerons & Flaps UV Coat Paint / Decals 4 $0.00    1   
Working through the process of applying 3 crossroads. Iron out air bubbles, picking tape and lightly sanding with 400 grit paper imperfections between coats.
 
313     Jun 19, 2022 Radiator &Oil Cooler Mount Engine 1.5 $0.00    1   
Fabricated a better mount than my first one, added flanges to stiffen and determining best hardware selection for securing.
 
312     Jun 15, 2022 EGT Bungs Engine 1 $0.00    1   
Gas welded stainless steel EGT bungs to stainless headers.
 
311     Jun 07, 2022 Insignia White Polytone Paint Paint / Decals $252.25    1   
2 gallons of paint, others suggest 3 gallons are needed, ordered 2 Gallons to keep going. Still need some orange and black paint as well.
 
310     Jun 04, 2022 Polyspray Control Surfaces Paint / Decals 8 $0.00    2   
Sprayed 3 crossroads on rudder, stabilizers, smoothed picked tape edges with iron on elevators, ailerons, flaps. Applied first crossroad on elevators.
 
309     May 24, 2022 Polybrush Control Surfaces Paint / Decals 6 $0.00    2   
Sprayed 2 coats of Polybrush on ailerons, flaps, elevators, horizontal stab, rudder. 2 hour rest between coats.
 
308     May 18, 2022 Engine Management System Engine $5975.61    1   
Purchased BD Turnkey AEM EFI kit.
 
307     Apr 24, 2022 Flaps- 2 coats of Polybrush Paint / Decals 2.5 $0.00    1   
Sprayed two coats of Polybrush on flaps. Temps were warm enough. Coats fill the weave of fabric. Waited two hours between coats. Paint booth worked well.
 
306     Apr 11, 2022 Ready to Spray Paint / Decals $427.00    1   
More Polybrush to spray two more coats on everything. Polyspray is the UV protection coating. Plus a quart of surface cleaner and Blush retarded. Still need to buy the Polytone paint.
 
305     Apr 08, 2022 Paint booth Tools 12 $350.00    1   
Waiting for outside Temps to warm up for too long, built temporary paint booth in garage.
 
304     Mar 30, 2022 Wheel Seals for Tubeless Tires Landing Gear $33.98    1   
Returned inner tubes, ordered Matco tubeless kit.
 
303     Mar 24, 2022 Tundra Tires Landing Gear $1600.00    1   
Purchased 27.5 " tall tundra Aero Classic tires that fit the Matco 8 inch wheel. I also purchased inner tubes. The inner tubes were $275. The tires can be run tubeless, uncertain if I will go without tubes.
 
302     Feb 28, 2022 Exhaust Studs Engine .5 $44.10    2   
Installed 8 studs into head. Used 8mmX1.25 38mm studs intended for VW air cooled engines.
 
301     Feb 19, 2022 Header Engine 3.5 $200.00    1   
Modifying Suzuki Sammurai Header. Cutoff flange from header, welded on flanges from APEX engine. $85 header, $115 for acetylene and welding rods.
 
300     Feb 15, 2022 Radiator Mount Engine 3 $180.00    1   
Radiator from eBay, $171 plus mounting hardware for oil cooler and radiator. Fabricated sheet metal bracket.
 
299     Feb 13, 2022 Oil Tank Fitting Spacer Engine 3.5 $0.00    2   
Machined an aluminum spacer to make hose clearance.
 
298     Feb 03, 2022 Aircraft Wiring Manual Research $23.00    1   
EAA aircraft wiring guide.
 
297     Feb 03, 2022 Headphone Jacks Instrument Panel $22.32    1   
2 pairs of jacks and insulating washers for installation.
 
296     Jan 29, 2022 Turtle Deck Stiffener Fuselage 1.5 $0.00    3   
Didn't like how the turtle deck sagged when installed. Add some extra aluminum C channel, so decided to use it as a stiffener. Spaced out rivet holes , drilled 1/16th holes. Countersink. Drilled lightening holes in channel. Installed with solid rivets.
 
295     Jan 29, 2022 Fuel Bulkhead Fittings Fuel System $18.00    1   
Bulkhead fittings for fuel system.
 
294     Jan 23, 2022 Front Quarter Panel Glass Fuselage 1 $0.00    1   
Cut Lexan, drilled panels, match drilled Lexan.
 
293     Jan 23, 2022 Door Glass Fuselage 6 $0.00    2   
Cut Lexan for doors, 4 pieces. Drill door frames, match drill Lexan. Painted rivet heads. Finished edges of Lexan. Rivet in place.
 
292     Jan 19, 2022 Door Latch Guards Fuselage .5 $0.00    2   
Fabricated two door latch guards that protect the fabric from wear. Then will be secured in place after final paint.
 
291     Jan 19, 2022 Airborne Bracket Engine .5 $25.00    1   
Made a new supoort bracket for air intake that is more rigid and secure than first fabricated part.
 
290     Jan 16, 2022 Oil Kit Engine $90.00    1   
Synthetic oil, filter, plug gaskets.
 
289     Jan 13, 2022 Thermostat Oil Bypass Engine 4.5 $75.00    2   
Removed oil/engine coolant heat exchanger. Machined from 6061 3 in round bar a housing for thermostat bypass. Purchased oil thermostat bypass, machined spacer. Installed onto engine. Ordered 8AN x 22mm fittings. Used bench top lathe/mill to make the parts.
 
288     Jan 09, 2022 3/8" VHB Tape Fuselage $10.00    1   
Very High Bond Tape for door Lexan, and front kick panel Lexan glass installations.
 
287     Jan 09, 2022 Door Window Strut Mounts Fuselage 3.5 $0.00    2   
Built mounting brackets for gas struts for hinged windows on doors. Fabricated from split steel tubes and welded flanges. Brackets painted and riveted to door and window frames. Installed gas struts.
 
286     Jan 02, 2022 Butt Rib to Fuselage Closeout Fuselage 3 $43.00    3   
Made a pattern template with poster board. Purchased .025" aluminum sheet. Cutout sheet metal. Formed bends. Marked and drilled rivet holes. Match drilled fuselage and butt rib. Painted sheet metal. Installed and rivet in place.
 
285     Jan 01, 2022 Door Gas Strut Install Fuselage 1.5 $0.00    3   
Located lower gas strut mount to fuselage, temporarily installed door gas strut mount with hose clamps, secured. Adjusted both brackets till door opened to nearly underside of wing. Drilled door mount bracket, painted bracket, rivet in place. Repeat for other side.
 
284     Dec 30, 2021 Throttle Cable Engine $91.75    1   
Quite an expensive a nice cable that I will cut up to fabricate what I need. I did not find a friction lock type for less.
 
283     Dec 23, 2021 Finished Air Intake Engine 4.5 $0.00    2   
Cut 4 inch PVC pipe to length, shortened flange on end cap, located and drilled holes for throttle body tubes, made supporting brackets, painted end cap, applied carbon vinyl wrap to tube. Installed filter.
 
282     Dec 19, 2021 Oil Cooler, Fittings Engine $107.69    1   
Engine oil cooler, 2 fuel line bulkhead fittings, 2 fuel line connection fittings.
 
281     Dec 19, 2021 Airborne Materials Engine $47.00    3   
4 inch PVC for air box and end cap, plus air filter.
 
280     Dec 06, 2021 Mount Doors to Airframe Fuselage 2 $0.00    3   
Cut larger piano hinge material to length. Mark out and drill holes into hinge. Locate hinge to door frame and match drill, use clecos along the way. Center door to fuselage, mark location. Center hinge half to fuselage door opening and match drill. Rivet hinge half to door and other hinge half to fuselage. Mate door to fuselage install hinge rod to locate and install door X2.
 
279     Dec 04, 2021 Doors Fuselage 3 $0.00    4   
Installed hinged windows in doors. Cut piano hinge to length. Mark out mounting holes into hinge. Drill #30 holes. Place hinge on window frame, drill. Center hinge on door and drill mounting holes. Rivet hinge to window and door. Repeat for other door.
 
278     Nov 30, 2021 PSRU and Head Cover Install Engine 4 $0.00    2   
Cleaned head cover of corrosion and grime (magnesium), removed engine cover, cleaned gasket surfaces. Painted head cover with black wrinkle paint. Installed head cover and SkyTrax PSRU.
 
277     Nov 30, 2021 Head Cover Gasket Engine $33.18    1   
New gasket for head cover for Apex Engine, torque seal for fasteners, retaining compound for PSRU drive gear installation.
 
276     Nov 23, 2021 contacted. Washers Fuselage $8.00    1   
Nylon washers for mounting of forward side panels and rear quarter windows.
 
275     Nov 23, 2021 Starter and Continous Relays Avionics $48.00    1   
Starter solenoid and power relay/contacters.
 
274     Nov 23, 2021 Gear Leg to Fuselage Bolts Landing Gear $5.40    1   
 
273     Nov 20, 2021 Spark Plugs Engine $20.00    1   
New spark plugs for Apex engine.
 
272     Nov 20, 2021 Left Main Gear Leg Covered Landing Gear 4 $0.00    1   
Covered left gear legs with fabric and applied first coat of Polybrush.
 
271     Nov 15, 2021 Rivnuts in Elevator Access Flange Fuselage .5 $0.00    1   
Installed #6 rivnuts in flange mount for elevator access panel mounting. 14 places.
 
270     Nov 13, 2021 Right Gear Leg Fabric Covering Landing Gear 4.5 $0.00    2   
Covered right gear legs using Polyfiber process. Could have gone without but like the final look of airplane with gear legs covered.
 
269     Nov 06, 2021 Left Elevator Tail Feathers 6 $0.00    2   
Applied fabric to the last control surface requiring it. The left elevator has some additional shape features for trim tab which results in more corners to deal with. Applied finish tapes and one coat of Polybrush. Two more spray coats, then UV coating then final paint required yet.
 
268     Oct 31, 2021 Fabric Tapes and Things Fuselage 16 $0.00    3   
After applying fabric and using iron to shrink, applied tapes anywhere metal was behing fabric and seams. Added rudder cable penetratration fairings and elevator access plates. Applied one coat of Polybrush over all surfaces afterwards.
 
267     Oct 11, 2021 Fuel Line Reroute Fuel System $23.43    1   
More Fuel line, needed to reroute so it does not rub on fabric covering. $7 for line, $14+ for shipping.
 
266     Oct 10, 2021 Fabric Covering Fuselage 14 $0.00    3   
Continued covering fuselage, applying to sides.
 
265     Oct 04, 2021 Aileron Fabric Wings 6.5 $0.00    1   
Applied covering to remaining aileron.
 
264     Oct 02, 2021 Right Side Elevator Wings 6 $0.00    1   
Covered starboard elevator.
 
263     Sep 30, 2021 Rudder Fabric Wings 9 $0.00    3   
Applied fabric and tapes to rudder. Used Polyfiber system as with everything else.
 
262     Sep 24, 2021 Horizontal Stabilizer Fabric Wings 3.5 $0.00    1   
Finished Left Stabilizer by adding fabric and tapes to unfinished side.
 
261     Sep 20, 2021 Elevator Inspection Plate Kiy Fuselage $65.00    1   
Purchased Elevator Inspection plate to mount in fabric on fuselage from Just Aircraft.
 
260     Sep 07, 2021 Control Cable Fairings Fuselage $8.86    1   
Control Cable fairings for rudder cable penetrations in aft fuselage fabric.
 
259     Aug 31, 2021 Fabric Covering Fuselage 6 $0.00    2   
First piece of fabric on fuselage. Rolled out fabric on underside. Cut and trimmed extra off. Applied Polytak to lower longreons. Trimmed around landing gear attach points and other fittings. Applied Polytak to fabric and glued in place. Did an initial 225 degree heat shrink to tighten the fabric a bit.
 
258     Aug 28, 2021 Fuselage Rottiserie Stand Tools 4 $0.00    2   
Built after stand and mounted airplane. Ready to apply the fabric.
 
257     Aug 26, 2021 Left Stabilizer Fabric Tail Feathers 4 $0.00    2   
Had enough left over wing fabric to cover one side of stabilizer.
 
256     Aug 23, 2021 Muffler Engine $80.00    1   
KTM dual sport bike muffler. Heavy but quiet.
 
255     Aug 18, 2021 Fuselage rotisserie stand Tools 3 $0.00    3   
Used scrap steel tubing from kit shipping container to fabricate stand for front of fuselage.
 
254     Aug 18, 2021 Right Horizontol Stabilizer Tail Feathers 4.5 $0.00    3   
Covering horizontal stab with left over fabric from wing. Used two pieces, underside first, then top side. Adding tape.
 
253     Aug 14, 2021 Left Aileron Wings 8.5 $38.87    1   
Purchased more MEK. Completed fabric application to left aileron.
 
252     Aug 08, 2021 Left Flap Wings 9.5 $0.00    2   
Added fabric to left flap. Process same as right flap work. Takes a lot of time to do properly. Skill gets better with each time.
 
251     Aug 05, 2021 Landing Gear Fit Up Landing Gear 1.5 $0.00    2   
Reamed fuselage/gear mounting holes. Reamed gear leg holes, V cabane holes and shock connect holes. Mounted legs to fuselage, cabane to fuselage, installed shocks. Bolts provided for gear legs are to short.
 
250     Aug 04, 2021 Right Flap Wings 4.5 $0.00    2   
Added leading edge tapes. Finished trailing edge tape on bottom side. Applied Polybrush to all surfaces.
 
249     Aug 01, 2021 Left Flap Wings 4 $0.00    2   
Applied fabric to flap. Used one piece. Applied adhesive to trailing edge. Wrapped, First applied Polytak to leading edge, and ribs. Drilled ribs for rivets. Used adhesive to bond the fabric. Did low temp shrink to work out the wrinkles on leading edge. Bonded to tip and root ribs. Used thinned Polytak t I bond leading edge. Trimmed fabric, overlapped tip and root ribs. Shrunk fabric at 250F, 300F and 350F.
 
248     Jul 30, 2021 Elevator Trim Tab Wings 3.5 $0.00    3   
Applied fabric to elevator trim tab. Used one piece. Used Polytak along leading edge, wrapped and overlapped, applied adhesive between fabric pieces. Trimmed. Bonded edges. Shrunk. Applied polybrush to all surfaces. Applied tapes to all edges.
 
247     Jul 27, 2021 Right Wing Fabric Wings 3.5 $0.00    1   
Used 6 inch tape for leading edge and two 3 inch tapes for trailing edge.
 
246     Jul 25, 2021 Right Wing Fabric Wings 4.0 $0.00    3   
Added Chordwise tapes over ribs top side and bottom side. Added tapes to false ribs and span wise over rear spar on underside. All were first marked out with #2 pencil and straight edge to get bond lines straight. Precoated fabric where tape was to be applied with Polybrush. Then applied wet, brushed over then dried then second coat over tapes.
 
245     Jul 22, 2021 Right Wing Fabric Wings 3.5 $0.00    2   
Finished fabric edges at trailing and leading edge butt rib and tip rib. Smooth fabric along leading edge. Bonded to gussets around strut fittings and control pulley areas. Installed reinforcement tape on under side ribs and secured fabric with large head rivets before final shrinking because of under camber wing. Used iron shrunk at 250F upper and lower sides. Next will shrink at final 325F or so.
 
244     Jul 19, 2021 Right Wing Top side Fabric Wings 3.0 $0.00    3   
Unrolled fabric across top side of wing. Cut off roll. Used Polytak to apply to trailing edge. Bonded leading edge. Bonded to wing tip rib and rib two. Trimmed leading edge fabric to chalk line for two inch overlap. Used iron at 225 to shrink top side, then rotated to shrink bottom side.
 
243     Jul 18, 2021 Right Wing Fabric Wings 3 $0.00    2   
Installed/applied fabric to lower side of wing. Process is going more smoothly after learning from process on left wing.
 
242     Jul 18, 2021 Magnetometer Wings .7 $0.00    1   
Fabricated a mount for GRT magnetometer to be installed on/in right wing wing tip rib.
 
241     Jul 03, 2021 Polyfiber SuperFil Wings $49.38    1   
Purchased more Polyfiber Superfil to smooth out rib to trailing edge joints, welded joints and etc to improve overall fit and finish of fabric applications. Expensive with shipping when comparing to autobody filler.
 
240     Jul 02, 2021 Landing Gear Landing Gear 1 $0.00    1   
Tk1 Shock Monster Gear arrives. Expensive but awesome.
 
239     Jul 01, 2021 Left Wing Fabric Landing Gear 3 $0.00    2   
Applied last span wise fabric tapes. The Leading edge and trailing edge. Used 6 inch wide tape on leading, and two 3 inch tapes for trailing. Marked out straight tape lines with pencil. Applied Polybrush, dried. Then applied wet polybrush when laying down the tape. Finally add a second coat of polybrush over the tape. Ironed out any bubbles, wrinkles.
 
238     Jun 25, 2021 Gear Legs and Shocks Landing Gear $4793.40    1   
Purchased TK1 Monster Gear Legs and Struts.
 
237     Jun 22, 2021 Left Wing Fabric Wings 7.0 $0.00    2   
Bonded lower side ribs, shrunk fabric at 250F, applied reinforcement tapes,, installed rivets, securing fabric to ribs, shrunk at 300F, Applied gussets and fabric dollies over bracket areas, chordwise tapes over ribs top and bottom sides using the polyfiber system instruction.
 
236     Jun 05, 2021 Left wing Fabric Wings 6 $0.00    4   
Continue to work on wing as time permits. Learned plenty along the way, next wing will go better. Had to iron out several wrinkles in fabric, will cut holes for wing strut mounts prior to attaching lower side fabric next time. Applied upper fabric with 2 inch bond line on leading edge, 1 in trailing edge. Did initial 250 degree heat shrink with iron, continued to trim for jury strut and control pulleys. Used soldering iron to burn holes through fabric for rivets in lieu of lacing. Applied reinforcing tape, burnt holes, installed rivets. Next is to shrink at 300 and final 350 prior to applying Polybrush and tapes.
 
235     May 14, 2021 Lower Side Fabric-Left Wing Wings 4 $0.00    2   
First piece of fabric being applied. Still have a few wrinkles to iron out prior to applying top fabric. So much more to do just to finish this wing.
 
234     Apr 28, 2021 Fabric Supplies Wings $120.57    1   
Anti-chafe tape, rib lacing, needle. $20 for tape, $50 for thread, $20 for needle, $20 for shipping. Crikey things add up.
 
233     Apr 25, 2021 Polybrush on Leading/Trailing Edges Wings 1.5 $0.00    1   
Mixed Polybrush with Reducer and applied two coats to leading edge, and trailing edge and fabric plates.
 
232     Apr 25, 2021 MEK Substitute Tools $23.00    1   
Solvent for cleaning brushes and mixing cups.
 
231     Apr 25, 2021 Dry Iron Tools $45.00    1   
Purchased an old style dry iron because the heat should be more consistent than steam type for installing fabric with Polyfiber system.
 
230     Apr 15, 2021 Polyfiber Materials Paint / Decals $414.11    1   
3 gallons of Polybrush, 3 yards of lightweight fabric for doilies, 1 gallon of 65-75 Reducer.
 
229     Apr 15, 2021 Engine Stand Engine Mount Engine 3 $0.00    1   
Fabricated engine mount so it could be hung on stand.
 
228     Apr 12, 2021 SkyTrax PSRU Arrives Engine $3900.00    1   
$3500 + PayPal fees, shipping and insurance. Yikes.
 
227     Apr 08, 2021 Removal From Snowmobile Engine 3 $0.00    3   
Removed Yamaha Apex Engine for 2007 Yamaha MTX.
 
226     Apr 05, 2021 Support for Fuel Shutoff Actuator Fuel System 1.5 $0.00    2   
Fabricated support plate to stabilize long actuator for fuel shutoff.
 
225     Mar 31, 2021 Tech Counselor Inspect Prior to Covering Inspection 3 $0.00    1   
Jeff Bongard inspected fuselage, control surfaces and wing assemblies prior to fabric covering step.
 
224     Mar 29, 2021 Wire Support Track Interior Finish 1.5 $24.00    2   
Purchased household type wire track, lightened it by drilling out material. Mounted in airplane via Adel clamps.
 
223     Mar 28, 2021 Center Cargo Floor Panel Interior Finish 2 $0.00    1   
Modified aluminum floor panel to make cutout relief for fuel lines. Applied vinyl film have 3d carbon fiber look.
 
222     Mar 27, 2021 Fuel Shutoff Fuel System 3 $0.00    2   
Fabricated a fuel shutoff switch extension to work with preferred fuel shutoff location.
 
221     Mar 21, 2021 Prep for Covering Wings & Control Surfaces Wings 15 $0.00    3   
Applying Superfil, sanding, and etc. Tedious effort to blend leading and trailing edges with spars and ribs. Still not perfect, but might say good enough.
 
220     Mar 02, 2021 ACK E-04 ELT Install Avionics 1 $624.16    2   
Received ELT in mail, positioned on mounting plate in aft section of fuselage. Located holes for mounting plate, and ELT brackets and antenna. Installed. Remote switch, audible alert, cabling to be installed later.
 
219     Feb 28, 2021 Control Area Cover Interior Finish 3 $28.00    3   
Purchased floor covering. Cut to fit. Purchased universal shift boots. Fabricated flanges, Mounted shift boots.
 
218     Feb 28, 2021 Pitot and Static Tube Routing Wings 1 $0.00    1   
Routed two tubes from Pitot and static location, into rear spar at rib 2 and extend tubing out the end of spar at root.
 
217     Feb 27, 2021 Floor Panel Covering Fuselage 2 $0.00    3   
Improved fit of forward floor panel for ease of removal, cleaned surface. Applied carbon fiber look vinyl to surface. Similarly did the floor panel aft of seats.
 
216     Feb 18, 2021 Left Aileron Fabric Plates Wings 3 $0.00    3   
Added joggle to fabric plates to install on underside of custom leading edge. Trimmed to fit. Applied chromate primer to underside. Drilled mounting holes, countersunk, applied epoxy to mating surfaces, located in place, installed rivets.
 
215     Feb 12, 2021 Vent Line, Filter, Elbow Fittings Fuel System $29.00    1   
1/4" fuel vent line, header tank drain and fittings for pitot hose.
 
214     Feb 07, 2021 Metal Fuel Routing, Filter Install Fuel System 4 $0.00    2   
Bend and route aluminum tube fuel lines, install fittings, clamp in place, secure.
 
213     Feb 02, 2021 Pitot Tube Mount Avionics 4 $0.00    2   
Made a bracket mount for pitot and static tube assembly. Designed so I could later replace with pitot/aoa is desired later.
 
212     Jan 26, 2021 Fuel Line Mounting Hardware Fuel System $12.43    1   
 
211     Jan 24, 2021 Installed Fuel Line Shutoffs Fuel System 1 $0.00    1   
Routed fuel line along fuselage welded members to wing root ribs. Cut fuel line where shutoff were to be located. Installed and secured with worm clamps.
 
210     Jan 24, 2021 Fuel Line, Thread Sealer, Silicone Tape Fuel System $38.00    1   
Purchased additional fuel line, Permatex PTFE liquid thread sealer, Rescue Tape.
 
209     Jan 23, 2021 Fuel Fittings and Header Tank Install Fuel System 3 $0.00    2   
Applied thread sealer to header tank fittings and installed. Located tank in fuselage and mounted in place with Adel clamps. Began fuel line routing.
 
208     Jan 22, 2021 Filled Leading Edge Cuff Joint Wings 4 $0.00    2   
Scuffed and solvent cleaned spar surface along bonded cuff. Marked flush surface line on spar. Applied tape along line to limit area for filler application. Mixed up super light filler from Polyfiber. Applied to upper and lower mating cuff edge to spar area. Allowed overnight curing and then sanded.
 
207     Jan 22, 2021 Filled Leading Edge Cuff Joint Wings 4 $0.00    0   
Scuffed and solvent cleaned spar surface along bonded cuff. Marked flush surface line on spar. Applied tape along line to limit area for filler application. Mixed up super light filler from Polyfiber. Applied to upper and lower mating cuff edge to spar area. Allowed overnight curing and then sanded.
 
206     Jan 21, 2021 Painted Header Tank Fuel System 3 $0.00    1   
Scuffed surfaces with Scotchbrite. Solvent cleaned surfaces. Warmed up the part and paint and spray area. Applied paint to 5 of the 6 surfaces, dried. Painted remaining surface. Applied Wild West Aircraft decal to Header tank.
 
205     Jan 21, 2021 Fuel Fittings/Filter Fuel System $132.35    1   
Purchased various AN fuel fittings and filter for metal fuel lines from header tank to engine.
 
204     Jan 17, 2021 Rear Quarter Window Fuselage .5 $0.00    1   
Cut from Lexan sheet, rear quarter window. Temporary install to straighten sheet metal for epoxy application.
 
203     Jan 17, 2021 Fuel Line, Return Fuel System 1.0 $0.00    2   
Straightened coiled aluminum tubing, routed from firewall to header tank, made 90�end to route from lower fuselage to tank.
 
202     Jan 17, 2021 Fuel Pump Fuel System 1.5 $0.00    1   
Mounted fuel pump. Fabricated two aluminum straps, used four cushioned clamps.
 
201     Jan 16, 2021 Fuel Line Fuel System $47.28    1   
Purchased 8ft of rubber fuel line. 4ft of line worked for right wing to header tank. Should have measured twice for left wing, too short.
 
200     Jan 08, 2021 Header Tank Fuel System 1.0 $772.50    2   
$750 + shipping. Seems exorbitant, but I practiced TIG welding and fabricating my own. The effort was taking too long and the results would not be satisfactory. Received tank, located and marked mounting points for Adel clamps. Drilled, demurred, mounted.
 
199     Jan 04, 2021 Aileron Cables Controls 1.5 $0.00    3   
Made up aileron cables that run from control mixer to aft of door. Installed nico sleeve, thimble, clevis on 3/16th" wire rope, swaged nico sleeve in place. Routed cable to determine length, cut cable and installed nico sleeve, thimble with turnbuckle. Swaged. Two cable assemblies.
 
198     Jan 04, 2021 Aluminum Fuel Line and Clamps Fuel System $50.18    1   
3/8th inch fuel line -25ft, size 10 adel clamp qty=6, size 8 adel clamp qty=8. And 10 #8 nutplates.
 
197     Jan 02, 2021 Pitot with Static Port Avionics $37.80    1   
Pitot and Static Port for Wing
 
196     Jan 02, 2021 Sandpaper 180 grit Tools $18.00    0   
 
195     Jan 02, 2021 Acetone Tools $11.00    0   
 
194     Dec 30, 2020 Rudder Cable Installation Controls 3 $0.00    3   
Fabricated cables. Clamped rudder and pedals in neutral position. Installed turnbuckles at pedals. Sized cables and swaged ends.
 
193     Dec 29, 2020 Smoothing Out Imperfections Wings 3.5 $0.00    2   
Mixed up light weight filler and applied to left wing at rib/trailing edge interface. False rib to front spar joints. Applied to wing tip/strobe light mounts.
 
192     Dec 28, 2020 Serial# Plate Fuselage .5 $0.00    1   
Located, drilled, riveted serial number plate in place.
 
191     Dec 27, 2020 Varnish False Ribs, Rear Spars, Bracing Wings 3.5 $0.00    2   
Mixed up varnish, brushed on false ribs, rear spars, flaps and aileron false ribs and ribs.
 
190     Dec 27, 2020 Wing Tip &Strobe Light Mounts Wings 2 $0.00    3   
Epoxied light mounts. Fabricated wood closeouts for wingtip at aileron area.
 
189     Dec 26, 2020 Nav Light Mounting To Wing Tips Wings 4 $0.00    3   
Fabricated aluminum brackets for mounting nav/strobe/position lights. Pressed treaded inserts into brackets. Bonded to inside of fiberglass strobe mounts.
 
188     Dec 26, 2020 Nutplates, Adel Clamps, Fuel Line Wings $50.18    0   
Parts for fabric plates, and mounting fuel system.
 
187     Dec 21, 2020 Left Wing Control Pulley Mounts Wings 6 $0.00    6   
Position flap pulley mount near rib#2. Trimmed rib cap. Aligned with flap control horn. Drilled, cleco in place. Abraded mating surfaces, applied epoxy, riveted in place. Did the same with aileron pulley mounts. Slotted trailing edge for flap spring. Positioned trailing edge, drilled and countersunk rivet mounting holes, abraded mating surfaces. Epoxy and rivet in place.
 
186     Dec 21, 2020 Shutoff Valves Fuel System $18.00    1   
Wing tank shutoff valves 6AN male fittings.
 
185     Dec 21, 2020 Left Wing Control Surfaces Wings 1 $0.00    1   
Mixed epoxy adhesive, solvent cleaned mating surfaces, applied epoxy to hinge plates and riveted in place.
 
184     Dec 21, 2020 Left Wing Control Surface Hinges Wings 2 $0.00    3   
Located supports from top of wing contour. Placed flap and aileron in position with spacers to offset from wing trailing edge. Located hinges, clamp in place, drill through hinge mounting plate holes through rib webs. 6 hinge pairs.
 
183     Dec 21, 2020 EAA Certification Guide Step by Step Tools $18.00    1   
EAA Certification Kit
 
182     Dec 21, 2020 Zinc Chromate Primer Paint / Decals $15.00    1   
One rattle can of Zinc Chromate primer.
 
181     Dec 16, 2020 Flap Hinges- Left Wing Wings 1.5 $0.00    1   
Temp installed trailing edge. Clamped straight edges to ribs on top side of wing, and 1/8 spacer to position flap. Match drilled hinge mounting holes,, reamed 3/16th hinge bushing hole x6. Positioned hinges and clamped in place.
 
180     Dec 14, 2020 Left Wing Aileron Leading Edge Wings 2 $0.00    1   
Fitted leading edge to aileron. Drilled rivet holes, countersink each one. Abraded and solvent cleaned spar and metal leading edge. Applied epoxy to 14 ribs, positioned, applied epoxy to main ribs, placed leading edge in place, installed rivets.
 
179     Dec 10, 2020 Leading Edge Cuffs Wings 3 $0.00    2   
Cut relief cuts in leading edge cuffs for lift strut bracket and jury strut bracket. Sanded mating surface, solvent cleaned surfaces applied Dynaflex 260 sealant to mating surface. Taped into place, positioned per template.
 
178     Dec 07, 2020 Leading Edge materials Wings $20.00    0   
One tube of Dynaflex 230 sealant to affix leading edge to front wing spars. 1/16ths thick basswood straps for aileron leading edge.
 
177     Dec 07, 2020 Tailwheel Fuselage Closeout Plate Fuselage 1 $0.00    1   
Fabricated access panel to closeout tailwheel area in fuselage.
 
176     Dec 07, 2020 Left Flap Leading Edge Wings 1 $0.00    2   
Cut leading edge clearance cutouts around hinges and bellcrank.
 
175     Dec 06, 2020 Left Wing False Ribs & Cable Guided Wings 2 $0.00    3   
Marked out locations of 14 false leading edge ribs. Abraded wing stringer and leading edge. Solvent cleaned, applied epoxy to ribs and installed. Used templates to locate control cable holes through main ribs near trailing edge. Drilled pilot hole then opened hole for nylon cable guides. Cut tubing, swaged one end of each, 16 pieces. Installed into ribs, swaged other end. Used heat gun and pressed ends with metal strip to swage.
 
174     Dec 03, 2020 Left Aileron Hinges&Bell Crank Wings 1.5 $0.00    3   
Abraded hinges and bell crank mating surfaces, abraded spar at mounting locations. Solvent cleaned surfaces. Mixed up and applied epoxy to mating surfaces, installed hinges and bell crank with CCP44 rivets. Located leading edge and marked locations of hinges and bell crank. Cut 5/8 inch slots at those locations.
 
173     Dec 02, 2020 Left Wing Trailing Edge Wings 1 $0.00    1   
Lightly abraded inside surface of trailing edge. Masked wing main rib locations. Applied chromate primer.
 
172     Nov 28, 2020 Left Wing Flap Wings 2 $0.00    1   
Trimmed fiberglass flap leading edge to fit. Marked locations for leading edge ribs. Mixed epoxy and applied to false rib edges. Installed and used tape to keep square, applied epoxy to flap ribs and positioned flap leading edge. Taped in place.
 
171     Nov 24, 2020 100 pack of CCP45 rivets Wings $13.57    0   
Rivets to install brakes on ailerons.
 
170     Nov 24, 2020 Loctite EA 9460 Adhesive Tools $31.38    1   
Two tunes of epoxy adhesives.
 
169     Nov 24, 2020 Left Wing Flap Wings 1.5 $0.00    3   
Clamped left flap and aileron together with 1/4 inch spacer. Centered both surfaces with wing, marked centerline of wing ribs 1,2,4,5,7,9 onto front spars. Centered and clamped hinges and bell crank on flap with markings. Secured with hose clamps. Set position of hinge points with measurements from trailing edge. Located flap to wing to confirm alignment. Transfer drilled #30 holes from brackets to spar. Removed hose clamps to access other holes to transfer. Cleco in place and drilled remaining holes. Mixed up epoxy, solvent cleaned surfaces, applied epoxy and riveted flap hinges and bell crank in place.
 
168     Nov 20, 2020 Right Wing Tip Wings 1.5 $0.00    2   
Taped along molded in scribe mark. Trimmed off fiberglass at scribe line. Hung aileron on wing, marked notch area for aileron travel, cut notch in wing tip. Installed wing tip onto wing, transferred drill holes in fiberglass for mounting.
 
167     Nov 18, 2020 False Rib Install, Right Wing Wings 1 $0.00    1   
Selected 14 false ribs. Spaced and marked positions on front spar and stringer two false rib locations evenly spaced between main ribs. Abraded surface, silent cleaned. Mixed and applied epoxy to false rib mating edges, squarely placed and applied fillers of epoxy. 14 places.
 
166     Nov 17, 2020 Right Flap Fabric Plates Wings 1 $0.00    2   
Drilled matching rivet holes in aileron leading edge with fabric plates. Sanded mating surfaces of aileron leading edge around hinges and flap control bracket. Sanded sheetmetal fabric plates. Solvent cleaned surfaces. Mixed epoxy and applied to mating surfaces, riveted plates to edge of leading edge.
 
165     Nov 15, 2020 Fitting Fabric Plates- Right Wing Wings 2 $0.00    1   
Prepared fabric plates for control surface hinges, trimming to fit, adding joggle to aileron hinge fabric plates to work with metal leading edges. Applied epoxy to wing fabric plates, installed in place on ribs with rivets.
 
164     Nov 13, 2020 Fabric Plates - Strut Brackets, Control Surfaces Wings 1.5 $0.00    3   
Located and matched drilled fabric plates with strut brackets. Riveted in place. Fit fabric plates for aileron and flap control brackets. Drill plates, match holes into leading edge of control surfaces.
 
163     Nov 12, 2020 Fabric plates Right Wing Wings 1.5 $0.00    3   
Fitted fabric plates for aileron and flap control pulleys. Clearanced opening, installed nutplates to fabric plates and trailing edge of right wing.
 
162     Nov 11, 2020 Right Wing Trailing Edge Wings 1 $0.00    1   
Countersunk rivet holes in trailing edge, Abraded mating surfaces, applied epoxy and riveted trailing edge to rivets in place.
 
161     Nov 10, 2020 Wing Control Cable Guides Wings 1 $0.00    1   
Cut nylon tubing in 2 inch pieces, 16 pieces for right wing. Heated one ened of each piece and presses end to create a bulb. Installed pieces into previously drilled wing rib holes. Heated and pressed remaining end of tube pieces to lock in place in ribs.
 
160     Nov 08, 2020 Aileron Hinge Brackets, Cable Rib Holes Wings 2 $0.00    4   
Lightly sand, clean right wing aileron hinge brackets. Painted. Printed out rib templates for control cable locations. Placed templates to ribs and drilled with 1/8" drill. Then drilled holes with 5/16th drill. Cut cable bushings.
 
159     Nov 06, 2020 Engine Mount Powder Coat Wings $100.00    1   
 
158     Nov 03, 2020 Flap Hinges Right Wing Wings 2 $0.00    1   
Located flap to hinge brackets, position flap flat with top contour and 1/8 inch gap. Clamp brackets in place, drilled through bracket holes through rib web. Removed flap, epoxied and riveted hinge brackets in place.
 
157     Nov 03, 2020 Flap Hinges Right Wing Wings 2 $0.00    0   
Located flap to hinge brackets, position flap flat with top contour and 1/8 inch gap. Clamp brackets in place, drilled through bracket holes through rib web. Removed flap, epoxied and riveted hinge brackets in place.
 
156     Oct 20, 2020 Engine Mount Engine $2000.00    1   
 
155     Oct 18, 2020 Right Wing Trailing Edge Mounting Wings 1 $0.00    2   
Position Trailing Edge, drill #40 holes into each rib thru trailing edge. Counter sink holes in metal trailing edge.
 
154     Sep 14, 2020 Left Aileron Leading Edge Bonding Wings 2 $0.00    1   
Drilled Aileron Leading edge for rivets into rib caps. Abraided mating surfaces, solvent cleaned, epoxied in place.
 
153     Sep 07, 2020 Aileron Pulley Blocks Right Wing Wings 3 $0.00    2   
Position pulley blocks on rear spar, clearance rib cap. Drill, and cleco in place. Abrade and clean mating surfaces, apply epoxy to mating surfaces, install rivets.
 
152     Sep 06, 2020 Control cable pulley install Fuselage 1 $0.00    1   
Position and locate 8 pulleys.
 
151     Sep 06, 2020 Turtle Deck Install Fuselage 3 $0.00    2   
Make pattern with poster board for trimming clearance for control cables and head rack, trim both sides of turtle deck. Position and locate camlock locations, drill and install Camlocs
 
150     Sep 01, 2020 Flap Pulley Block -Right Wing Wings 2 $0.00    0   
Position Pulley Block to inboard side of rib 2, trim rib cap, align with control bracket on flap, mark location, drill and locate with clecos, abrade and clean rear spar and block. Apply epoxy and rivet in place.
 
149     Aug 31, 2020 Aluminum Header Tank Fuel System 1 $0.00    1   
Practice TIG welding, in prep for tank welding.
 
148     Aug 31, 2020 Left Aileron Leading Edge Splice Wings .5 $0.00    1   
Completed joining the two leading edge pieces with splice. Used 3/32nd solid rivets.
 
147     Aug 31, 2020 Nav/Position/Strobe Lights Fuel System $505.00    0   
Purchased Aveo Nav/Position/Strobe Light and AN4-16A bolts.
 
146     Aug 28, 2020 Fuel Pumps Fuel System $625.00    1   
Purchased Edge Performance fuel pumps setup.
 
145     Aug 20, 2020 Epoxy Left Quarter Window Wings 1 $0.00    1   
Masked and applied epoxy at rear quarter window to fuselage.
 
144     Aug 20, 2020 Epoxy Left Quarter Window Wings 1 $0.00    1   
Masked and applied epoxy at rear quarter window to fuselage.
 
143     Aug 19, 2020 Right Wing Return Spring Wings 1 $0.00    1   
Aligned and attached flap spring bracket to flap spar. Slotted leading edge for flap spring.
 
142     Aug 15, 2020 Left Aileron Leading Edge Wings 2.5 $0.00    4   
Mr. Naoya Kishimoto assisted with modifying aileron rib leading edges for custom leading edge. Marked cut line on ribs, and 14 false ribs. Trimmed away material for fitting metal leading edge. Installed leading edge splice to one of two pieces. Marked rivet location, drilled #40 holes, countersunk for flush rivets. Installed rivets with squeeze and impact gun.
 
141     Aug 15, 2020 Right Wing Flap Pulley Block Wings 2 $0.00    1   
Temp installed flap, positioned pulley block, cut rib cap for clearance, clamped pulley block with pulley in place. Marked trailing edge for flap return spring slot. Drilled out 2 -3/4" holes and then removed material in between.
 
140     Aug 15, 2020 Pulley Blocks Wings 1 $0.00    1   
Marked and drilled #30 holes in 6 pulley block mounts for wings. Sanded mating surfaces free of paint.
 
139     Aug 12, 2020 Varnished Left Wing Wings 2 $0.00    2   
Applied Poly Fiber epoxy varnish to wood ribs of left wing.
 
138     Aug 05, 2020 Left Wing Root Rib Lightening Wings 2 $0.00    4   
Marked out cutout pattern similar to right wing. Completed cutouts, bonded and riveted stiffener to underside rib cap.
 
137     Aug 04, 2020 Flap Leading Edge-Right Wing Wings 1 $0.00    1   
Abraded spar of flap where false ribs were to be bonded. Applied epoxy to false ribs and to ribs. Mated leading edge and secured in place.
 
136     Aug 03, 2020 Left Wing Tank Cover Wings 2.5 $0.00    2   
Aligned sheetmetal over ribs one and two. Located holes aligning with nutplates in ribs. Drilled. Installed tank and aligned sheetmetal to locate hole for tank filler spout. Marked and cutout hole.
 
135     Aug 02, 2020 Butt Ribs and Trailing Edge Finish Wings 2 $0.00    2   
Installed reinforcement to butt ribs, epoxy and riveted in place. Applied paint to butt ribs. Applied Zinc Chromate primer to inboard surface to right wing trailing edge.
 
134     Jul 30, 2020 Epoxy Varnish Butt Ribs and Aileron Fuselage 2 $0.00    2   
Applied Varnish to Butt ribs, right wing aileron and flap ribs. Applied varnish to false ribs in leading edge of aileron and flap for right wing.
 
133     Jul 30, 2020 Loctite EA9460 Epoxy Adhesive Tools $33.62    0   
Purchased additional epoxy adhesive.
 
132     Jul 27, 2020 Aileron Hinge and Bellcrank Mounting Wings 1.5 $0.00    3   
Abraded mounting surfaces of hinges, bell rank and front spar. Solvent cleaned, applied epoxy and riveted in place.
 
131     Jul 22, 2020 Aileron Leading Edge Right Wing Wings 2 $0.00    2   
Cut relief clearance cuts around hinge and bell crank locations for hinge brackets from main wing.
 
130     Jul 16, 2020 Aileron Leading Edge Fillers Wings 1 $0.00    1   
Purchased 1" x 24" x 1/16" basswood to use as filler to close gaps between false ribs and leading edge preventing distortion when fabric covering is shrunk.
 
129     Jul 16, 2020 Panel Placement Instrument Panel 1 $0.00    1   
Placed Instrument Panel, marked fastener locations, drilled and positioned panel, cleco'd in place for control stick adjustment. Shortened control sticks for adequate clearance.
 
128     Jul 15, 2020 Flap Leading Edge Wings 1 $0.00    2   
Cut and sanded leading edge hinge and bell crank relief cutouts so flap can be installed.
 
127     Jul 14, 2020 Right Flap Hinges and Bracket Attach Wings .5 $0.00    2   
Abraded mating surfaces of hinges and control bracket and flap spar. Cleaned surfaces with acetone. Applied epoxy adhesive to matting surfaces. Cleco'd in place. Installed CCP-44 rivets.
 
126     Jul 13, 2020 Varnish and Aileron False Ribs Wings 2 $0.00    2   
Applied second coat of epoxy varnish to tight wing ribs. Applied epoxy adhesive to aileron false ribs and installed into right wing aileron. Cleco'd aileron leading edge in place to secure false ribs in place for adhesive to cure.
 
125     Jul 12, 2020 Right wing root rib stiffener Wings .8 $0.00    1   
Placed metal stiffener. Marked for holes, drilled #30. Transferred holes to lower rib cap. Abraded mating surfaces and applied epoxy, riveted in place.
 
124     Jul 12, 2020 Root Rib Web Out Wings 3 $0.00    3   
Decided to remove material from rib #1 right wing similar to patterns on other ribs. Drew out pattern, marked center points for radius. Used hole cutter at locations then used small, reciprocal saw to remove material. Sanded cutouts. Installed fuel tank for verification.
 
123     Jul 11, 2020 Quarter Windows in Kick Panels Fuselage 1.5 $0.00    2   
Cutout desired window profile in aluminum sheet material which are located on forward part of fuselage. Temporary install of rear quarter window features too.
 
122     Jul 10, 2020 Epoxy Varnish to Right Wing Wings 2.5 $0.00    2   
Applied by brush epoxy varnish to wood ribs and gussets of right wing.
 
121     Jul 09, 2020 Epoxy Prime Parts Paint / Decals 1.5 $0.00    3   
Primed more control surface hinges and front kick panels and access plate.
 
120     Jul 08, 2020 Priming of Small Parts Paint / Decals 1.5 $0.00    1   
Applied epoxy primer with spray gun to aileron/flap hinges and control brackets as well as windshield mounting brackets.
 
119     Jul 08, 2020 3/32nd Clecos and #8 Anchors Fuselage $31.85    0   
 
118     Jul 08, 2020 Paint and Sheetmetal Fuselage $22.00    0   
 
117     Jun 28, 2020 Sheetmetal and Paint Fuselage $22.00    0   
Purchased .025 aluminum sheet and orange spray paint.
 
116     Jun 28, 2020 False Rib Install In Right Aileron Leading Edge Wings 2.5 $0.00    2   
Positioned leading edge, marked centerline for Control bracket and hinges. Marked offsets and measured. For other false rib locations. Sanded fiberglass leading edge bonding areas. Applied epoxy to ribs and installed. 24 hour cure.
 
115     Jun 27, 2020 Fuel Tank Cover Leading Edge Mouny Wings 1.5 $0.00    1   
Located piece in place on front spar and marked with Sharpie. Drilled for rivets on rib 1 and 2 rib caps. Scuffed mating surfaces, solvent cleaned. Mixed up epoxy and applied to mating surfaces. Positioned, clamped in place with straight edge, installed rivets and allowed 24 hour cure.
 
114     Jun 23, 2020 Camlocs for Turtledeck and Cowling Fuselage 2 $0.00    2   
Drilled and located CAMLOCS for turtle deck 7 places. Squeezed rivets to install. Located and drilled for CAMLOCS for engine cowling 12 places.
 
113     Jun 22, 2020 Rear Quarter Windows Fuselage 2 $0.00    2   
Cut out windows in sheetmetal, cut from sheetmetal the frame to trap and secure window. Primed and painted the inside. Drilled holes for securing window.
 
112     Jun 15, 2020 Rear Windshield Bracket Fuselage .5 $0.00    1   
Aligned Rear Bracket with butt rib caps using straight edge. Trimmed lower edge to clear fuselage tubing. Marked and drilled mounting holes.
 
111     Jun 14, 2020 Slotted Trailing Edge Left Wing Wings 1 $0.00    1   
Slotted trailing edge for aileron and flap hinges at ribs 5, 7 and 9.
 
110     Jun 13, 2020 Flap and Aileron Rt Wing Brackets Wings 1 $0.00    3   
Drilled rivet holes into front spar of aileron and flap for hinge brackets and bellcranks for right wing.
 
109     Jun 12, 2020 Flap and Aileron Leading Edges Wings 3 $0.00    3   
Cut fiberglass leading edge for flap to length. Trimmed long edges so edges mated with rib caps. Cut metal aileron leading edge to length. Cut slots to clear hinges.
 
108     Jun 10, 2020 Left Wing Trailing Edge Wings 2.5 $0.00    2   
Marked, set punch drilled for nutplates in trailing edge for fuel tank cover mount. Cut trailing edge pieces to length to meet at rib web.
 
107     Jun 07, 2020 Right wing trailing edge. Wings 2.5 $0.00    2   
Cut trailing edge pieces to length for right wing. Chained drilled and filed slots for aileron and flap hinges.
 
106     Jun 02, 2020 Aileron and Flap Install-Right Wing Wings 2 $0.00    1   
Placed wing underside up. Clamp straight edges on wing ribs to support aileron &flap. Cleaned up epoxy around flap spar and rib so hinge can be placed.
 
105     May 31, 2020 Butt Rib Left Wings 2 $0.00    0   
Clamped root rib to butt rib with 1/8 inch spacer. Measured distance to fuselage mounting bosses. Measured and cut standoffs. Drilled mounting to butt rib. Riveted standoffs to butt rib. Drilled and cut features into web for clearance of fitting s and fuel lines.
 
104     May 31, 2020 Aileron Leading Edge Splice Wings 1 $0.00    1   
Aligned leading edge pieces, marked out spacing, drilled for 3/32nd holes. Matched drill splice doubler.. Countersunk for flush solid rivets. Installed rivets.
 
103     May 31, 2020 Filler Rib Left Wing Wings 1 $0.00    1   
Trimmed Filler rib caps flush with web aft edge. Taped wing trailing edge in place for filler rib alignment. Scuffed rear spar for bonding. Cleaned surface. Installed rib and confirmed position and squareness. Applied epoxy, let sit for 24 hours.
 
102     May 30, 2020 Right Aileron Leading Edge Mod Wings 1 $0.00    1   
Modified shape of leading edges of aileron ribs to fit custom shaped Steve Henry aileron leading edge.
 
101     May 30, 2020 Butt Rib Fuel Tank Fuel Fitting Holes Wings 1.5 $0.00    1   
Marked fitting locations to rib, drilled holes in rib to allow installation of fuel line fittings.
 
100     May 30, 2020 Left Wing Fuel Tank Install Fuel System 3.5 $0.00    4   
Temporary installed root rib, clamped supports between ribs 1& 2 to support tank. Clamped tank mounting brackets in place, marked positions, removed tank. Drilled 4 brackets, match drilled front and rear spar. Riveted brackets. Applied epoxy at bracket joints. Match drilled tank to bracket mounting. Installed nutplates.
 
99     May 29, 2020 Left Wing Root Rib Wings 2 $0.00    1   
Fitted rib to spar, positioned similar to right wing. Abraded spars. Solvent cleaned. Epoxies in place.
 
98     May 27, 2020 Fuel Tank Install Left Tank Wings 2 $0.00    3   
Positioned butt rib so 1/8 inch gap with tank at ribs 1 and 2. Clamped 2 straight edges on underside. Positioned tank, clamped mounting brackets to tank and marked positions for attaching brackets to front and rear spars. Marked, drilled brackets, positioned and transferred drilled spars, riveted in place, applied epoxy at bracket spar joints.
 
97     May 12, 2020 Right Wing Fuel Tank Cover Wings 2 $0.00    2   
Drilled and located nutplates in trailing edge. Used strap duplicator to locate fuel tank cover mounting holes. Marked out and located fuel inlet.
 
96     May 11, 2020 Right Wing Wing Tip Nutplates Wings 2 $0.00    1   
Measured out, marked, drilled 1/8 center holes, checked, transferred drilled 3/32nd mounting holes, opened up center holes with #18, counter sunk 3/32nd holes. Riveted nut plates in place.
 
95     May 10, 2020 Installed Left Wing Wings 1 $0.00    0   
Reamed fuselage mounts. Rearranged shop and located fuselage in other garage bay to make room for installing left wing.
 
94     Apr 28, 2020 Left Wing Tip Trimming Wings 1 $0.00    1   
Applied tape along scribe line, used angle grinder with cutting wheel to trim part. Finished edge with hand sander. Sanders flash off at parting line as well.
 
93     Apr 27, 2020 Paint Scheme Concept Paint / Decals $0.00    1   
Nitsuj Designs provided a conceptual paint scheme. Paint Theme name is "Brush Cutter".
 
92     Apr 26, 2020 Right Wing Butt Rib Wings 3 $0.00    2   
Pivoted wing back to place butt rib. Reamed tubing mounts on fuselage. Cut to length rib T-fittings. Clamped Butt rib to root rib, marked and located fuel fitting holes and sight gauge holes.
 
91     Apr 26, 2020 Tapped Sight Gauge Fittings Fuel System .5 $0.00    1   
Located, marked, drilled and tapped 1/8NPT threads for sight gauge fittings in right wing tank.
 
90     Apr 25, 2020 Rib 9 Nutplates for Wing Tips Wings 2.5 $0.00    3   
Located, marked, drilled, countersinked, riveted 23 nutplates into last rib of left wing.
 
89     Apr 25, 2020 Duplicator Strap Tools $9.50    0   
Hole duplicate. Will use for locating mounting holes in wing tips.
 
88     Apr 25, 2020 Epoxy Varnish Wings $88.50    0   
Ev-400 Epoxy Varnish kit Qt.
 
87     Apr 24, 2020 Right Wing Tank Nutplate Mounted Wings 1 $0.00    1   
Located Nutplates with clecos to 4 drilled mounting holes. Transferred drill 3/32nd holes. Countersinked. Mounted nutplates with rivets, 4 places.
 
86     Apr 24, 2020 Tank Cover Front Mount Nutplates Wings 2 $0.00    2   
Installed nutplates to the two wing tank front mounts. Used 3 inch spacing. Drilled 1/8 holes on centers. Cleco'd nutplates to locate mounting holes, drill 3/32nd holes. Opened up 1/8 holes with #18 drill for thru holes. Riveted in place with solid rivets.
 
85     Apr 23, 2020 Left Root Rib Nutplate Install Wings 1 $0.00    1   
Marked Out Three Inch spacing. Drilled 1/8 inch holes on center. Cleco'd nutplates to locate 3/32nd holes. Drilled out 1/8th holes with #18 hole. Countersink rivet holes. Located rivets and squeezed to locate nut plates.
 
84     Apr 21, 2020 Butt Rib Reinforcement Wings 2 $0.00    1   
Steve Henry recommended improvement-adding reinforcement to the butt rib rib cap. The cap is stapled and glued to the web. The windshield is mounted to this rib. Fabricated aluminum angle extrusion to follow contour of upper rib cap. Will be epoxies and riveted in place.
 
83     Apr 20, 2020 Left Wing-Installed Wing Joint Doublers Wings 1 $0.00    1   
Match drilled doublers to spars. Abraded mating surfaces, cleaned surfaces with acetone. Epoxied, bolted and riveted in place. Cleaned surfaces of excess.
 
82     Apr 19, 2020 Left Wing-Strut Brackets Wings 1.5 $0.00    1   
Bonded previously drilled spar/lift strut brackets, interface front and rear spars. Installed Jury strut brackets. Cleaned and abraded surfaces, applied epoxy to both sides and rivet in place.
 
81     Apr 18, 2020 Flight Test Manual and check cards Wings $17.95    0   
Ordered EAA's Flight Test manual and test check cards.
 
80     Apr 18, 2020 Lift Strut Brackets- Left Wing. Wings 1.5 $0.00    1   
Drilled front and rear spar of left wing for lift strut brackets.
 
79     Apr 18, 2020 Left Side Kickpanel Nutserts Fuselage 2 $0.00    1   
Drilled out mounting holes to install 8-32nd nutserts. Used nursery puller to complete installation.
 
78     Apr 16, 2020 Fuel Tank Cover Nutplates Wings 3 $0.00    1   
Chalked lined on upper rib caps. Drilled 1/8 inch holes on ribs 1 & 2 every 3 inches. Cleco'd nutplates in place to locate 3/32nd mounting holes. Drilled holes. Cleaned surfaces. Countersink 3/32nd rivet holes. Cleco'd nutplates into position, installed flush solid rivets, used rivet squeezer to compress rivets to secure nutplates.
 
77     Apr 15, 2020 Right Wing Tank Rib Wings 1 $0.00    1   
Cut rib caps flush for trailing edge. Marked location on rear spar. Abraded spar surface, solvent cleaned. Applied epoxy, positioned end rib behind fuel tank. Used trailing edge to secure in place.
 
76     Apr 15, 2020 Left Wing Stringer Install Wings 1 $0.00    1   
Install stringer through ribs 2 to 9, mark where to cut to length. Abrade stringer for bonding to each rib. Clean surface with acetone. Position stringer. Apply epoxy.
 
75     Apr 14, 2020 End Rib Drag Links Wings 2 $0.00    2   
Fabricated drag links from leftover stringer material. Cut to length, pinched ends, bent angles, drilled mounting holes, transferred holes to rib and spar, drilled holes, abraded metal mating surfaces, applied epoxy and rivet in place.
 
74     Apr 12, 2020 Left Wing Gussets Wings 1.5 $0.00    1   
Positioned wing to work. Sanded mating surfaces. Applied epoxy to gussets, positioned. Applied epoxy fillets to both sides of 8 gussets between spars and drag links.
 
73     Apr 12, 2020 Bonding Root Rib Wings 1 $0.00    1   
Abraded spars, used acetone to clean up surfaces. Assured proper place and position of root rib. Epoxy rib in place.
 
72     Apr 12, 2020 Root Rib Cutouts Wings 1 $0.00    1   
Marked locations for fuel tank fittings locations onto root rib. Used hole saw to make holes.
 
71     Apr 11, 2020 Front Kick Panels Fuselage 1 $0.00    2   
Installed 8-32 nutserts 13 places for locating right side footwell side panel. Drilled out panel mounting holes to accept 8-32 screws. Marked out window cutout.
 
70     Apr 11, 2020 Ailerons Trailing Edge Wings 2 $0.00    1   
Prepared trailing edge pieces for flaps. Cut to length, abrade mating areas, temp install for drilling mounting holes,#40, through rib caps, both sides. Countersink for 3/32 rivets. Mix up epoxy, apply to rib caps, install trailing edge, install rivets, wipe off squeeze out epoxy. Cure for 24 hours.
 
69     Apr 10, 2020 Flaps Wings 2 $0.00    2   
Prepared trailing edge pieces for flaps. Cut to length, abrade mating areas, temp install for drilling mounting holes,#40, through rib caps, both sides. Countersink for 3/32 rivets. Mix up epoxy, apply to rib caps, install trailing edge, install rivets, wipe off squeeze out epoxy. Cure for 24 hours.
 
68     Apr 08, 2020 Rear Side Windows Fuselage 2 $0.00    2   
Made window frame pattern made with poster board from fuselage. Cut frame from .025 aluminum sheet. Located onto fuselage to size window. Marked out window on sheet. Cut window out and dressed edges with file.
 
67     Apr 07, 2020 Fuel Tank Install Wings 1 $0.00    1   
After brackets were installed, placed tank and drilled mounting holes in each of the four brackets. Shimmed with thick tape where needed to eliminate and play at mating surfaces.
 
66     Apr 06, 2020 Fuel tank support brackets Wings 2 $0.00    2   
Right Wing: Placed temp supports across underside of ribs #1 & #2. Positioned tank, clamped mounting brackets to mounts on fuel tank. Marked positions on front and rear spars. Removed tank, marked out 4 hole positions on each bracket, drilled #30 holes. Relocated brackets and drilled holes into spars. Riveted in place and backfilled with epoxy.
 
65     Apr 05, 2020 Flap Trailing Edges Wings 2 $0.00    0   
Cut trailing edge material to length. Filed edges smooth. Installed onto flap ribs, marked on edge width of rib caps, both sides. Center punch for drilling #40 hole on trailing edge on each rib cap. Drilled. Ordered 3/32nd countersink.
 
64     Apr 05, 2020 Countersinks Tools $25.60    0   
#30 & #40 Countersink cutters needed for Micro adjust countersink tool. $12.85 a piece
 
63     Apr 05, 2020 Camloc Pliers Tools $16.95    0   
Camloc Pliers Tool needed to locate CamLoc Receptacles
 
62     Apr 02, 2020 Installed Right Wing Wings .5 $0.00    1   
Temporarily installed right wing to locate fuel tank and root rib.
 
61     Apr 02, 2020 Trim Trailing Edge Rib Cap Strips Wings 1 $0.00    4   
Trim and sand upper and lower cap strips at trailing edge flush with ribs. Radius edges so trailing edge installs flush.
 
60     Apr 01, 2020 Lift Strut Wing Brackets Wings 2.5 $0.00    2   
Lift Strut locations preset by factory. Aligned and match drilled bracket hole locations into front and rear spar of right wing. Cleco'd has holes were drilled. Removed, cleaned holes, painted brackets, abraded mating surfaces, mixed up epoxy, applied to mating surfaces, riveted in place and cleaned up epoxy squeeze out.
 
59     Mar 30, 2020 Jury Strut Brackets, Right Wing Wings 1 $0.00    2   
Measured and positioned jury brackets 90 degrees normal to bottom of front and rear spars. Drilled 1/8 holes in brackets teamed 3/16ths holes in tabs, abraded mating surfaces applied epoxy. Riveted in place. Cleaned excess squeeze out.
 
58     Mar 29, 2020 Header Tank Fabricate Fuel System 2 $0.00    3   
Folded sheetmetal flat patterns to make a header tank. Had no sheetmetal brake. After forming, radiused edges, and did final fitting.
 
57     Mar 28, 2020 Rivnut Puller Workshop $26.00    0   
Purchased rivnut puller to install 8-32 fasteners.
 
56     Mar 28, 2020 Header Tank Fabrication Fuel System 2 $0.00    1   
Used prototype mockup to layout flat patterns on 3003-H14 .063" sheet aluminum. Cut out flat patterns.
 
55     Mar 28, 2020 Wing Tip Rib Drag Links Wings 1.5 $0.00    1   
Fabricated drag links from leftover stringer material. Drilled for rivets. Abraded mating surfaces. Mixed up Hysol and applied to cleaned mating surfaces. Installed rivets. Cure for 24 hours.
 
54     Mar 28, 2020 Attachment Doubler Wings 2 $0.00    3   
Installed upper and lower doubles to forward and aft spar fuselage attachment points for right wing. Located, drilled #30 holes 4 places per doubler. Mixed up Hysol epoxy, abraded mating surfaces. Cleaned, applied Hysol to mating surfaces. Installed rivets and fastener. Let cure 24 hours.
 
53     Mar 25, 2020 Gussets Wings 2 $0.00    1   
Installed gussets between drag links and spars on right wing. Shaped gussets to fit. Roughed up surfaces on drag links and spars where gussets install. Applied Hysol to edges of gussets and installed eight places. Then applied Hysol fillets to all sides of install.
 
52     Mar 21, 2020 Brake Line Routing Landing Gear 1.5 $0.00    3   
Routed Matco brake lines between cylinders and parking brake valves.
 
51     Mar 21, 2020 Systems support tray Fuselage 1.5 $0.00    0   
Used an extra aluminum channel piece and modified for a system routing and supporting feature underneath floor board.
 
50     Mar 19, 2020 Brake master cylinder installation Landing Gear 2 $0.00    2   
Reamed mounting holes in fuselage and rudder pedal assembly. Fitted pedal brake mounts. Installed cylinders and marked drill points in pedal mounts. Drilled 5/16ths holes. Painted pedal mounts. Reinstalled master cylinder assemblies and connected pedals to cylinders using the appropriate hardware.
 
49     Mar 18, 2020 Parking brake control unit Landing Gear 1.5 $0.00    1   
Located mounting plate below control mixer with Adel clamps. Mounted brake fluid flow control unit. Cut pull cable to length and installed.
 
48     Mar 18, 2020 Switch Plate Fuselage 1.5 $0.00    1   
Fabricated plate to install forward of control mixer for mounting parking brake pull cable and tailwheel locking lever. Shaped aluminium plate, drilled mounting holes, drilled holes for parking brake pull cable and tailwheel locking lever. Installed.
 
47     Mar 17, 2020 Tailwheel Landing Gear 1 $0.00    1   
Received Tundra Lite tailwheel in mail. Mounted it to Superstol tailwheel suspension by aligning and drilling for 1/4" securing bolts.
 
46     Mar 16, 2020 Header Tank Pattern Fuel System 2 $20.00    1   
Made a mockup header tank with foam board. Measured, made first pattern from cardboard, fitted, made adjustments to make final pattern. Will now transfer to .063 aluminum sheet. Foam board assembled with hot glue gun.
 
45     Mar 14, 2020 Forward Skin Panels Fuselage 2 $0.00    1   
Used poster board for pattern. Cut left and right skin panels from. 025 aluminum sheet. Drilled pilot holes and used clecos to secure panels for final fitting. Used body hammer to shape panel edge to door frame edge. Cut pattern for windows in forward skin panels.
 
44     Mar 12, 2020 Header Tank Fuel System $110.18    0   
Purchased 48 inch x 48 inch X 0.063 inch 3003H14 material to fabricate a header tank.
 
43     Mar 08, 2020 Windshield A Post Mount Fuselage 1.3 $0.00    3   
Drilled out windshield post mounting holes with #30 bit. Fitted formed sheetmetal pieces to fuselage. Trimmed where needed. Back drilled through mounting tabs. Ready for primer.
 
42     Mar 07, 2020 Side Floor Panel Closeouts Interior Finish 1.5 $0.00    2   
Because I am choosing not to apply fabric covering on interior sides of fuselage I fabricated side of seat closeouts that extend beyond structure to close gaps with applied exterior covering. Provided AL sheetmetal strips are not used. Made poster board templates, cut sheetmetal, drilled mounting holes, zinc Chromate primer, and painted.
 
41     Mar 06, 2020 Stick Grip Install Controls 1 $0.00    2   
Determine where the PTT wires should exit the sticks. Found some grommets for the routing wiring through sticks. Drilled sticks, routed wires, installed grip with tube diameter adapter, mounted PTT cap, fixing it to stick with rivet.
 
40     Feb 28, 2020 Control Stick Grips. Controls $106.53    1   
Purchased RAC Stick Grips. $46.55 each, tax and shipping
 
39     Feb 24, 2020 Bottom Stringer Fuselage 1.5 $0.00    1   
Cut standoffs to a length that provides a nice stringer profile. Drill fuselage bushings, align stringer standoffs and match drill. Bushings had to be reamed. Primed standoffs with chromate primer. Rivet Standoffs. Align stringer and mark standoff locations. Drill stringer. Prepare epoxy adhesive. Apply adhesive to standoffs, install stringer. Secure stringer in place with bungees. Cure overnight.
 
38     Feb 21, 2020 Tundra Lite Tailwheel Purchase Landing Gear $1064.46    1   
Ordered 8" SuperSTOL Tundra Lite Taillwheel from Pekola Enterprises- Jim Pekola $957+$Tax+$22 shipping.
 
37     Feb 13, 2020 Control stick shaping Controls 2 $0.00    0   
Added bends to the control sticks to jiggle and improve position of stick handle in relation to reach from seated position.
 
36     Feb 09, 2020 Elevator Push/Pull Rod Install with Control Mixer Controls 4 $0.00    3   
Installed Control Mixer, Positioned control sticks and drilled for mounting. Formed bends into long elevator push/pull rod for alternate routing below floor. Installed push/pull rods to bell crank.
 
35     Feb 08, 2020 Paint Tools $20.00    0   
Purchased black & safety orange enamel paint in rattle cans, and 3 feet of non-skid tape.
 
34     Feb 08, 2020 Assembly- Seats, Rudder Pedals, Control Mixer Fuselage 3.0 $0.00    3   
Riveted Seat back & base aluminum panels to seat frames, assembled seat backs to seat frames with hardware, installed seat adjuster spring pins. Installed rudder pedal assembly to fuselage. Assembled control mixer, control stick pivots, and tie rod.
 
33     Feb 05, 2020 Paint Parts Fuselage 1.0 $0.00    0   
Painted miscellaneous parts, push/pull elevator control rods, touch-ups on rudder pedal assembly.
 
32     Feb 03, 2020 Paint Parts Fuselage 1.5 $0.00    0   
Paint Seat Frames, Control Mixer and other miscellaneous parts.
 
31     Jan 26, 2020 Finishes for Metal Parts Fuselage 4 $0.00    2   
Prep Chrome moly/steel parts for paint. Scotch brite all surfaces and etc. Hang from fixture.
 
30     Jan 25, 2020 Elevator Install Fuselage 2.5 $0.00    2   
Installed elevators to horizontal stabilizers. Clamped leading edges. Applied welding clamp to elevator horns to secure alignment. Removed leading edge clamps and positioned elevators so 5/16th" hole could be drilled through horns for elevator push/pull rod clevis installation. Drilled and reamed. Removed elevators from plane, cleaned finished hole, placed elevators on flat surface, clamped horns and removed material to fit clevis. Reinstalled elevators to plane.
 
29     Jan 24, 2020 Manual Trim Control Assembly. Fuselage 2 $0.00    1   
Trimmed flat aluminum sheet to fit manual trim cable mount on elevator. Located mounting holes, drilled with #30 drill, installed blind rivets. Aligned elevator trim with elevator, sized piano hinge, cut to length and notched, drilled for mounting piano hinge between elevator and elevator trim part. Located assembly with clecos. Fabricated more robust angle for cable mount in lieu of provided L-bracket. Drilled for rivets, aligned with elevator trim actuator arm, located angle to plate mounted in elevator and drilled #30 holes for rivets. To be mounted at final assembly after fabric installed to control surfaces.
 
28     Jan 18, 2020 Fly Wires Fuselage 6 $0.00    2   
Built wood frames to hole the Horizontal stabilizers at horizontal, and the vertical fin vertical. Used Swage-it Tool to make up the Flying wires- upper and lower.
 
27     Jan 13, 2020 Seat Adjustment Rail Installation Fuselage 0.6 $0.00    1   
Located and drilled the seat adjustment positions in the left and right seat adjustment rails.
 
26     Jan 12, 2020 Seat Adjustment Rail Installation Fuselage 1.5 $0.00    1   
Located seat adjustment rails, drilled & reamed 1/4" mounting bolt holes in rail, temporary install of flap pulleys, located seat adjustment stops for aft position.
 
25     Jan 12, 2020 Fly Wires Fuselage 1 $0.00    1   
Ream 1/4" bushings in Horizontal Stabs and Vertical Fin for mounting of Fly Wire Tabs. Gathered appropriate bolt/washers/nut hardware and located tabs.
 
24     Jan 09, 2020 Seat Backs Fuselage 2 $0.00    2   
Trim .040 Aluminum sheet to fit seat frames-Seat backs (2), Seat Bases (2). Drill for rivet installation.
 
23     Jan 06, 2020 Flap Handle Assembly and Install Fuselage 1.5 $0.00    2   
Drilled Push button rod, assembled plates with flap handle with spring detent and appropriate hardware. Tested actuation. Located into fuselage, drilled mounting holes, reamed fuselage mounting bushings. Handle and pushbutton detent rod will be painted.
 
22     Jan 05, 2020 Manual Trim Control Assembly. Fuselage 1.5 $0.00    1   
Dressed up the manual trim handle with lightening holes, drilled pilot holes in plate for pre-assembly.
 
21     Jan 04, 2020 Seat Runners Fuselage 2 $0.00    1   
Installed 4 seat runners (PTFE) Strips. Drilled, countersinked, and riveted in place.
 
20     Jan 02, 2020 Horizontal Stabilizers Fuselage 1 $0.00    1   
Shorten front stabilizer bushing .060" for flush fitment of stabilizers, confirmed zero degree angle of incidence, drilled 3/16ths holes in front stabilizer mounts.
 
19     Dec 31, 2019 Swage-It #2 Tool, Nico Gauge, & EP-420 Primer Tools $161.48    0   
Ordered Nicopress (Swage-it #2) for cable making. Ordered EP-420 Epoxy Primer, with catalyst and reducer. All purchased through Aircraft Spruce.
 
18     Dec 31, 2019 Top, Side Aluminum Stringer Install Fuselage 1.5 $0.00    2   
Sanded all fuselage spigots, Vertical Fin and aluminum stringers in vicinity of structural epoxy application with 180 grit, cleaned all sanded surfaces with acetone. Applied epoxy, completed installation, seized all installation positions with bungees. After epoxy drying for 2 hours, smoothed transition areas where fabric covering would telltale through. Riveted top stringer to vertical fin during epoxy application, used CP44 rivet.
 
17     Dec 31, 2019 Hysol Epoxy Plunger Tools .5 $0.00    1   
Made a dual plunger tool for pushing out the Hysol Epoxy Structural adhesive from tubes. Epoxy was squirted into zip lock bag for mixing and dispensing.
 
16     Dec 30, 2019 Finishes for Metal Parts Research .5 $0.00    0   
Reviewing Poly-fiber Aero-Thane information. Checking on prices. Sent inquiry of which orange color option best matches the Cardinal Color safety orange.
 
15     Dec 30, 2019 Fitted Aluminum Stringers Fuselage 1 $0.00    1   
Removed temporary installed aluminum stringers, added corrosion finish to ends of all the welded spigots that were cut to define fabric covering shape. fabricated an additional support for upper aluminum stringer. Top and side stringers are now ready to be bonded in place.
 
14     Dec 30, 2019 Revise forward Fuselage Stand Fuselage 0.5 $0.00    1   
Removed cross support for my fuselage stand, welded 45° braces instead. Fix allows me to install Bottom fuselage stringer.
 
13     Dec 24, 2019 Rudder Pedal Assembly Prior to Painting Fuselage 1.5 $0.00    1   
Scotch brite the metal pieces, shaped and drilled the plastic spacers,assembled, aligned mounting brackets and assembly in fuselage, drilled bottom bracket of assembly through the oil holes to rivet mounting brackets. Now the assembly is ready for paint, later the rivets will be drilled out.
 
12     Dec 21, 2019 Fitted Aluminum Stringers Fuselage 3 $0.00    2   
Fitted Top Aluminum Stringer to fuselage, welded spigots had to be trimmed for proper installation of top stringer, had to install Horizontal Stabilizer Front attach bracket to finalize fitment of Top stringer.
 
11     Dec 17, 2019 Ordered Reamers and Clecos from Aircraft Spruce Workshop $65.07    0   
Ordered 10 1/8" Clecos, 3/16", 1/4", 5/15", 3/8" Reamers.
 
10     Dec 16, 2019 Footwell, baggage Floor Panels Fuselage 1 $0.00    0   
Fitted Aft Baggage Panel
 
9     Dec 14, 2019 Footwell, baggage Floor Panels Fuselage 1.5 $0.00    1   
Fitted Baggage Floor Panels
 
8     Dec 13, 2019 Footwell, baggage Floor Panels Fuselage 2.5 $0.00    1   
Fit Aluminum Footwell Floor Panel.
 
7     Dec 10, 2019 Picked up Parts from Powder Coater Fuselage 1 $873.60    0   
Returned powder coated parts to shop.
 
6     Nov 29, 2019 Scotch brite fuelage -prep for powder coat. Fuselage 6 $0.00    1   
Prep Fuselage, Vertical Fin, Horizontal stabilizers(2), elevators(2), Jury struts (2), welded door assys (2), wing struts (2)
 
5     Oct 24, 2019 Picked up Parts from Powder Coater Landing Gear 1 $65.52    0   
Picked up Matco Wheels after powder coating black.
 
4     Oct 15, 2019 Dissembled Matco Wheels for Powder Coating Landing Gear 1 $0.00    1   
Split Matco Wheels to prepare for Powder Coating
 
3     Oct 11, 2019 Inventory Kit Inspection 4 $0.00    0   
Uncrate, inventory parts, read through the 14 pages of Bill of Materials.
 
2     Oct 09, 2019 Airplane Kit Arrives Workshop 1.5 $1169.63    2   
My Just Aircraft Highlander quick build kit arrives via Semi-Tractor trailer. Unload to trailer, then transport to garage and unload and slide crate in garage. Shipping charges shown.
 
1     May 04, 2019 Order Highlander from Steve Henry Research 1 $32810.00    0   
Ordered Quick Build kit
  ------------ -------------- ------------- Totals799.9    $70783.69    587   




NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.