EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Summary
Hours
Entries
Expenses
Dtl. Expenses
Flight Time
Viewers
Categories
Project:
Sport
- Project Summary
- Optional PDF document function
Add entry descriptions
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
Cost
# Pictures
60
Jun 04, 2020
Riveted fuel tanks on
Wings
3
$0.00
1
59
May 29, 2020
Dissassembled Carb
Fuel System
1
$0.00
1
58
May 29, 2020
Baggage compartment & Elevator push rod tunnel.
Fuselage
8
$0.00
3
57
May 14, 2020
Fitting wings and flaps to fuselage etc
Wings
14
$0.00
12
56
May 12, 2020
Aileron and flap rigging
Wings
12
$0.00
8
55
Apr 29, 2020
Installed optional folding wing components.
Wings
4
$0.00
6
54
Apr 29, 2020
Flap lever and linkage
Controls
3
$0.00
2
53
Apr 24, 2020
Aileron bell crank installations.
Controls
6
$0.00
7
52
Apr 23, 2020
Installed Wings
Wings
6
$0.00
8
51
Apr 22, 2020
Finished installing elevator trim cable. Completed final assembly of tail section. Installed spar guide blocks and adjusters. Installed flap detent plate.
Controls
6
$0.00
5
50
Apr 21, 2020
Riveted tail section after rigging.
Controls
2
$0.00
0
49
Apr 21, 2020
Riveted tail section after rigging.
Controls
2
$0.00
1
48
Apr 21, 2020
Riveted bottom forward skin on, worked on fitting rudder pedals.
Fuselage
3
$0.00
0
47
Apr 21, 2020
Cheek and joggle fitment, exhust tunnel.
Fuselage
8
$0.00
1
46
Apr 20, 2020
Installed aileron hinges and riveted skins on to right wing.
Wings
6
$0.00
1
45
Apr 20, 2020
Riveted more ribs. Ran pitot tube. Conduit
Wings
7
$0.00
2
44
Apr 19, 2020
Fuselage construction
Fuselage
$0.00
1
43
Apr 19, 2020
O-320 A1A Assembly
Engine
40
$0.00
7
42
Apr 16, 2020
Elevator balance, rudder cables, return springs etc
Controls
12
$0.00
7
41
Oct 29, 2019
Finished elevator aft push tube and painted it. Worked on elevator balance weight brackets. Made master cylinder extensions and mounted master cylinders. Set brake pedal locations.
Controls
7
$0.00
6
40
Oct 28, 2019
Removed vertical stabalizer to install elevator down stop. Worked on elevator aft push pull tube.
Controls
4
$0.00
4
39
Oct 15, 2019
Removed Elevators and riveted inner ribs and drive horns onto inner ribs. Reinstalled elevators and re leveled. Drilled hole in drive horn for heim bearing installation per build manual.
Fuselage
5
$0.00
0
38
Sep 13, 2019
Installed elevators and leveled and fixtured for elevator drive horn installation
Fuselage
2
$0.00
5
37
Sep 12, 2019
Assembled and installed control stick assembly. Installed nylon slide nblocks for wing spars.
Fuselage
14
$0.00
4
36
Sep 11, 2019
Installed rudders and brake pedals. Installed upper and lower nylon blocks for spar sliders.
Fuselage
4
$0.00
0
35
Aug 21, 2019
Bottom skin fitting, assembly of rudder and brake pedals.
Fuselage
8
$0.00
0
34
Aug 20, 2019
Upper panel, seat back construction.
Fuselage
12
$0.00
11
33
Aug 01, 2019
Fit front cheek former's.
Fuselage
5
$0.00
4
32
Jul 26, 2019
Fit vertical stabilizer, worked on main gear
Fuselage
9
$0.00
10
31
Jul 25, 2019
Fit and up drilled all horizontal brackets
Fuselage
5
$0.00
1
30
Jul 10, 2019
Fit horizontal tail and brackets
Fuselage
5
$0.00
4
29
Jun 20, 2019
Joining tail cone to front cage.
Fuselage
14
$0.00
5
28
Jun 19, 2019
Started fitting skins to fuselage cage.
Fuselage
4
$0.00
3
27
Jun 12, 2019
Tailcone final assembly
Fuselage
8
$0.00
2
26
Jun 06, 2019
Tail spring mount and tail cone rear.
Fuselage
16
$0.00
4
25
Jun 02, 2019
Worked on assembly of push rod tube cover.
Fuselage
4
$0.00
1
24
May 22, 2019
Assembled side panels and bottom panel to bulkheads, squared assembley and updrilled.
Fuselage
8
$0.00
3
23
Apr 24, 2019
Assembled upper formers and upper skins on rear fuselage.
Fuselage
3
$0.00
3
22
Apr 22, 2019
Fitted longerons & stiffners to rear tail cone panels.
Wings
8
$0.00
1
21
Apr 21, 2019
Fitted and assembled bulkheads.
Fuselage
5
$0.00
1
20
Apr 16, 2019
Installed elevator balance weight, installed rudder cables, installed rudder return springs and bracket, installed rudder pedal adjusters. Fitted rudder horn stops. Ran elevator trim cable. Checked rudder travel.
Controls
12
$0.00
0
19
Apr 10, 2019
Fitted fuel tanks to wings
Wings
8
$0.00
3
18
Feb 22, 2019
Left & Right fuel tank assembly proceedure.
Wings
33
$0.00
13
17
Feb 19, 2019
Built fuel tank jig.
Fuel System
2
$0.00
4
16
Feb 18, 2019
Finished wings, on to fuel cells.
Wings
12
$0.00
1
15
Feb 17, 2019
Squared and leveled right wing, began installing upper wing skins.
Wings
2
$0.00
1
14
Feb 09, 2019
Installed pitot tube connection and riveted the skins on the left wing.
Wings
4
$0.00
3
13
Feb 08, 2019
Debur, dimple and countersink.
Wings
4
$0.00
2
12
Feb 07, 2019
Debur, dimple repeat.
Wings
8
$0.00
3
11
Feb 06, 2019
Removed skins from left wing for deburring and dimpling. Made inspection plates for both wings and installed left plate on skin.
Wings
8
$0.00
3
10
Feb 05, 2019
Fitted all skins and updrilled to #40 on left wing.
Wings
7
$0.00
5
9
Feb 03, 2019
Mounted right wing ribs and riveted.
Wings
5
$0.00
3
8
Feb 02, 2019
Shortened rear spars as per plans for sport wing. Cut holes in rear spars for aileron drive linkage.
Wings
2
$0.00
1
7
Jan 31, 2019
Spar construction
Wings
52
$0.00
7
6
Jan 24, 2019
Wing construction
Wings
$0.00
8
5
Jan 17, 2019
Aileron Construction
Controls
16
$0.00
8
4
Dec 22, 2018
Flap construction
Controls
11
$0.00
1
3
Jan 26, 2018
Building of the empennage.
Empennage
62
$0.00
12
2
Jan 09, 2018
Kit Delivered, Inventory checked. Unpacked
Workshop
5
$0.00
3
1
Dec 31, 1969
Set up wing jigs and began working on wing ribs.
Wings
16
$0.00
4
------------
--------------
-------------
Totals
562
$0.00
230