Project: JMillette     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours # Pictures
140     Mar 08, 2024 CB Wiring Avionics 9 2   
139     Mar 07, 2024 Batterys Instrument Panel 6 3   
138     Mar 07, 2024 Farings Farings 8 5   
137     Feb 25, 2024 Contiued mounting Control horns on Elevator Tail Feathers 8 6   
136     Feb 18, 2024 Reskinned the Elevator Tail Feathers 8 4   
135     Oct 29, 2023 Mounted new panel and more cleaning Instrument Panel 6 0   
134     Oct 15, 2023 Clean up day Workshop 6 0   
133     Jun 06, 2023 Cut out new panel. Instrument Panel 8 6   
132     Jun 04, 2023 Panel and Electrical redo Avionics 6 1   
131     May 30, 2023 Panel option redue Avionics 3 2   
130     May 28, 2023 Clean Slate Avionics 6 3   
129     May 07, 2023 Electrical redo Fuselage 6 2   
128     Jan 01, 2023 Wiring from Wing to Panel Lighting 9 7   
127     Dec 30, 2022 Final Fitting of Windscreen Fuselage 16 5   
126     Dec 28, 2022 Final Assembly of Passenger door Fuselage 5 2   
125     Dec 27, 2022 Pilot Door Final assembly Fuselage 5 2   
124     Dec 26, 2022 Painted Door frames and Parts Fuselage 8 3   
123     Dec 23, 2022 Passenger Door Fuselage 8 1   
122     Dec 22, 2022 Decals Installed Paint / Decals 6 2   
121     Dec 12, 2022 Passenger side door Fuselage 8 3   
120     Dec 04, 2022 Reconnected fuel lines Fuel System 8 2   
119     Dec 03, 2022 Reinstalled Wings after paint Wings 7 4   
118     Nov 27, 2022 Painted both wings Paint / Decals 30 4   
117     Nov 07, 2022 Painting Tail feathers Paint / Decals 16 4   
116     Oct 30, 2022 Re did fuel channels Fuel System 8 6   
115     Oct 29, 2022 Disassembly Wings 8 3   
114     Oct 23, 2022 Nose Strut Spacer Landing Gear 4 1   
113     Oct 09, 2022 Installed Flaperons Controls 8 6   
112     Oct 02, 2022 Flaperons Controls 9 2   
111     Oct 02, 2022 Stabilizer end cap Tail Feathers 16 8   
110     Sep 26, 2022 Building of Flaperon (part1) Controls 6 1   
109     Sep 26, 2022 Fairings Wings 16 20   
108     Sep 10, 2022 Fiberglass Fairing Wings 8 13   
107     Sep 03, 2022 Inner wing skins Wings 16 9   
106     Sep 02, 2022 Riveted wing tips Wings 1   
105     Aug 27, 2022 Root Wing Skin Wings 8 7   
104     Aug 20, 2022 Riveted wing tips Wings 4 1   
103     Jul 30, 2022 Radio installed Avionics 1   
102     Jul 30, 2022 Radio installed Avionics 8 1   
101     Jul 29, 2022 Completed wiring in both wings Wings 10   
100     Jul 29, 2022 Completed wiring in both wings Wings 16 10   
99     Jul 28, 2022 Installed Pilot Nav/Strobe Lighting 4 2   
98     Jul 28, 2022 Pilot Wing tip Wings 4 3   
97     Jul 27, 2022 Parking Brake Controls 4 2   
96     Jul 25, 2022 Steering Linkage Controls 5 3   
95     Jul 25, 2022 Mount for Headsets Avionics 4 6   
94     Jul 04, 2022 Static System/BU levil BOM Install Avionics 8 8   
93     Apr 04, 2022 EIS Sensor Terminal Instrument Panel 6 3   
92     Mar 27, 2022 Fuel tanks and fuel line Fuel System 8 6   
91     Mar 25, 2022 Viking Aircraft Fuel Sender Fuel System 16 12   
90     Mar 24, 2022 Finished up the Dorsal Tail Feathers 6 2   
89     Mar 20, 2022 Dorsal Fin and Access panel Tail Feathers 7 4   
88     Mar 19, 2022 replaced the nose strut Landing Gear 6 1   
87     Mar 12, 2022 Fuel Trailer Fuel System 3 4   
86     Mar 06, 2022 Building Fuel Trailer Tools 8 2   
85     Jan 16, 2022 Mounted Tail Tail Feathers 16 10   
84     Jan 09, 2022 Corrected dihedral Wings 8 8   
83     Jan 01, 2022 Struts and mounting bolts Wings 9 3   
82     Dec 29, 2021 Mounted wings Wings 8 7   
81     Dec 27, 2021 Left wing Completed Wings 8 29   
80     Dec 24, 2021 Left wing debur and rivet bottom skin Wings 9 4   
79     Dec 23, 2021 Left wing wire Wings 9 11   
78     Dec 20, 2021 Left wing bottom skin Wings 9 6   
77     Dec 20, 2021 Started left wing Wings 9 2   
76     Dec 16, 2021 Hobbs meter and Flap switch Instrument Panel 2 2   
75     Dec 16, 2021 Sunroof Install Fuselage 8 6   
74     Dec 05, 2021 Installed windscreen Fuselage 5 6   
73     Nov 28, 2021 Installed Landing Light in Right wing Lighting 8 2   
72     Nov 14, 2021 Completed wing tip and started left wing Wings 16 6   
71     Nov 06, 2021 Continued right wing Wings 16 7   
70     Oct 31, 2021 Right wing continued Wings 9 2   
69     Oct 30, 2021 Wings right Started bottom skin Wings 3 7   
68     Oct 26, 2021 Color Scheme Interior Finish 1   
67     Oct 24, 2021 Right Wing Wings 5 7   
66     Oct 24, 2021 Started skeleton of Right Wing Wings 8 6   
65     Oct 03, 2021 Vertical Stab Tail Feathers 16 10   
64     Sep 08, 2021 Chip in prop Propeller 0 3   
63     Sep 06, 2021 Started wiring the Avionics Avionics 16 9   
62     Sep 05, 2021 Made Decals for air intake Paint / Decals 3 2   
61     Aug 29, 2021 Painted and installed Seat frames and Interior Interior Finish 16 5   
60     Aug 29, 2021 Built Pilot Door Fuselage 8 5   
59     Aug 22, 2021 Painted Glare Shield and Seat Frames Paint / Decals 8 5   
58     Aug 21, 2021 First Start of Viking Engine Engine 4 0   
57     Aug 21, 2021 Primed and Painted Cowling Paint / Decals 16 3   
56     Aug 14, 2021 Cowl Work Engine 16 15   
55     Aug 11, 2021 Brake line covers Landing Gear 2 4   
54     Aug 07, 2021 Electrical completion for Engine Engine 8 6   
53     Aug 01, 2021 Electrical of Engine/circuit breakers Engine 8 15   
52     Jul 25, 2021 Cowl Continued Engine 5 7   
51     Jul 11, 2021 lower cowl install Fuselage 8 11   
50     Jun 27, 2021 Installed header tank Fuel System 8 12   
49     Jun 20, 2021 Switch panel and circut breakers Instrument Panel 8 16   
48     Jun 07, 2021 Engine install: Electricals continued Engine 8 14   
47     May 28, 2021 Engine install: Electricals Started Engine 8 6   
46     May 25, 2021 Corrected Radiator plumbing Engine 2 7   
45     May 24, 2021 Engine Install: Overflow and Hoses continued Engine 6 4   
44     May 23, 2021 Engine Install: Radiator Hoses Engine 11   
43     May 23, 2021 Radiator Plumbing Engine 4 10   
42     May 23, 2021 Installed engine mount and Engine Engine 16 7   
41     May 20, 2021 Decals Paint / Decals 1 2   
40     May 18, 2021 Engine Unboxing Engine 1 4   
39     May 16, 2021 Nose Gear and Brakes Landing Gear 8 7   
38     May 15, 2021 Painted Exterior Trim Paint / Decals 8 8   
37     May 09, 2021 Prepped for paint and Painted the fuselage Paint / Decals 16 3   
36     May 02, 2021 Elevator pulleys Empennage 16 14   
35     May 01, 2021 Panel Completed Instrument Panel 32 31   
34     Apr 22, 2021 Ordered Eng. and Firewall forward kit Engine 0   
33     Apr 18, 2021 New removable panel and Mounted Avionics to panel Avionics 16 8   
32     Apr 15, 2021 Tie downs and Cargo area Fuselage 4 4   
31     Apr 11, 2021 Printed decal tests Paint / Decals 2 2   
30     Apr 10, 2021 Completed paint of Rudder Pedals and reassembled Fuselage 16 14   
29     Apr 04, 2021 Painted the interior Paint / Decals 8 3   
28     Mar 27, 2021 New lighting Workshop 6 1   
27     Mar 22, 2021 Prep for A/C install in Working area Workshop 6 1   
26     Mar 22, 2021 Received GRT Avionics Package Avionics 1 1   
25     Mar 22, 2021 installed sliding seats Interior Finish 8 3   
24     Mar 22, 2021 Upper front skin Fuselage 8 2   
23     Feb 27, 2021 Mocked up Rudder controls Controls 8 1   
22     Feb 16, 2021 Continued front Stiffiners Fuselage 2 6   
21     Feb 06, 2021 Mocked up controls/Final Install Controls 16 6   
20     Jan 31, 2021 On the Gear Landing Gear 16 3   
19     Jan 23, 2021 Painted Landing gear Landing Gear 16 29   
18     Jan 19, 2021 Fuselage Continued Fuselage 23 21   
17     Jan 10, 2021 Joined the Fuselage Fuselage 8 6   
16     Jan 09, 2021 Corrected the mistake Fuselage 9 3   
15     Jan 04, 2021 Started work on the forward fusealge Fuselage 24 14   
14     Dec 23, 2020 Continued working Empennage Empennage 7 15   
13     Dec 20, 2020 Side Walls and Top Empennage 20 7   
12     Dec 14, 2020 Empennage Build started Empennage 16 7   
11     Oct 08, 2020 Completion Elevator Tail Feathers 8 4   
10     Sep 28, 2020 Purchase of Full Kit (Airframe and Finishing) Research 0   
9     Sep 27, 2020 Started assembly of the Elevator Tail Feathers 6 6   
8     Sep 20, 2020 Completion on the Horizontal Stab Tail Feathers 7 8   
7     Sep 13, 2020 Horizontal Stabilizer Part 2 Tail Feathers 4 27   
6     Sep 09, 2020 Horizontal Stabilizer Part 1 Tail Feathers 5 7   
5     Aug 28, 2020 Tail Kit Arrived and Inventory Tail Feathers 1 1   
4     Aug 13, 2020 Purchase of Tail Kit Research 1 0   
3     Aug 09, 2020 Completion of rudder assembly Tail Feathers 5 8   
2     Aug 08, 2020 Rudder Trial Fit Tail Feathers 2 2   
1     Jul 30, 2020 The journey begins... Research 1 2   
------------ -------------
Totals1151    841   