Project: msmst25     -     Project Summary     - Optional PDF document function
Entry Titles Only           Project PDF with: -

Entry #CreatedTitleCategoryHours # Pictures
47     Apr 15, 2021 Fiberglass work on the empennage fairings Empennage 6   
Continuing fiberglass work on the fairings and attaching fairings. Had to start over after the first attempt. One layer of glass wasn't strong enough to support the structure.
 
46     Mar 28, 2021 Cabin cover Fuselage 6   
Continue to drill and countersink holes for cabin cover. Used right angle drill for countersinking.
 
45     Mar 26, 2021 Cabin cover and shim for baggage door Fuselage 3   
Continue fitting cabin cover. Match drilling cabin cover. Installed shim for baggage door top to skin joint.
 
44     Mar 06, 2021 Rear seat backs, flap motor, flap control Fuselage 17   
Install PH Aviation Flap motor. Assemble and install rear seat backs. Attach and seal brake lines.
 
43     Feb 22, 2021 Flap motor and controls and rear seats Fuselage 12   
Building brackets for PH Aviation flap motor. Assembling and drilling rear seat backs. Assembling control mechanisms
 
42     Feb 09, 2021 Brake and rudder pedals Fuselage 11   
Assemble and install brake lines from TS Flightlines
 
41     Jan 12, 2021 Baggage floors, access panels Fuselage 10   
Spent most of a week designing and fabricating and install access panels. Installed doubler for comm antenna. Installed conduit.
 
40     Jan 03, 2021 Attached tailcone Fuselage 5   
Section 32
Tailcone attached
 
39     Jan 03, 2021 Upper forward fuse Fuselage 11   
Section 32
Completed the upper forward fuselage subassembly.
 
38     Dec 19, 2020 Section 29 complete Fuselage 10   
Section 29
Final rivets for section 29. Had to use a few cherrymax rivets for hard to reach spots. Floor panels installed. Landing gear mounts installed. Repaired the dent after dropping bucking bar.
 
37     Dec 04, 2020 Riveting under structure Fuselage 4   
Section 29
Riveting ribs and longerons in place, attaching skins. Multiple rivets needed to be inserted not called out in the plans.
 
36     Dec 02, 2020 Priming fuselage parts and beginning riveting Fuselage 2   
Section 29
Primed parts. Cut out baggage door. River nutplates. Begin riveting under structure. Install tunnel access panel.
 
35     Nov 26, 2020 Disassembly and deburring Fuselage 5   
Section 29
Match drilling the firewall brackets. Dulled multiple drill bits. Disassembling the fuselage. Deburring.
 
34     Nov 23, 2020 Screwing up the longerons Fuselage 3   
Section 29. continue final drilling the skins into the ribs, firewall and longerons. Accidentally drilled an extra hole in the right longeron and gusset. Waiting for Van's support to give guidance.
 
33     Nov 20, 2020 Bending and attaching forward fuselage skins Fuselage 3   
Section 29
Continue bending the forward fuselage skins and attaching. Prepping ribs for attachment.
 
32     Nov 17, 2020 Fuselage side skins Fuselage 3   
Attaching and final drilling the mid fuselage side skins to frame and longhorns.
 
31     Nov 16, 2020 Bending mid fuselage side skins Fuselage 6   
More work on section 29. Bending the mid fuselage side skins.
 
30     Nov 15, 2020 Fuselage side skins Fuselage 5   
Section 29-1 thru 29-4
Bending fuselage longerons and drilling. Making clamp for bending side skins. Forming clamps out of angle for side skins.
 
29     Nov 04, 2020 More riveting and bolting Fuselage 2   
Page 28-14
Continuing to rivet bottom skins to bulkhead. Bolting forward bulkhead sections in place. Had to drill out several nutplates because the wrong size was used. Cut myself multiple times.
 
28     Nov 03, 2020 Mating Forward and Aft fuselage Fuselage 2   
Page 28-14
Riveted aft bulkhead to forward and aft bottom skins. Help from Matt Willis. Need different bucking bar.
 
27     Nov 02, 2020 Firewall and bottom skin riveting Fuselage 6   
Page 28-13
Riveted Firewall assembly to forward skin. Attached ribs to firewall. Added "oops" rivets to bottom skin errors with good results. Attached forward center bulkhead assembly to forward fuselage assembly. Torqued bolts to final tightness (28 in/lbs).
 
26     Oct 31, 2020 Riveting ribs to bottom skin Fuselage 9   
Riveted skins and forward bulkheads to bottom skin. Had to drill out one row of rivets because rib put in backwards. Started assembling brake lines from firewall to tunnel, but seem to be too long.
 
25     Oct 29, 2020 Fuselage parts prep Fuselage 6   
Pages 28-9 to 28-10
Final drilling fuselage assembly. Disassemble. Deburr and dimple all holes. Attach nut plates. Mistakenly drilled nut plate screw holes to #19 instead of #12, had to remove and redrill and reattach. Countersunk VA-188 instead of dimpling because I thought it was too thick, but needed to order replacement.
 
24     Oct 27, 2020 Fuselage attachment Fuselage 2   
Page 28-9
Mates forward and center fuselage assemblies. Deburred spacers.
 
23     Oct 26, 2020 Forward Fuselage Assembly Fuselage 2   
Pages 28-3 to 28-8
Attach nut plates, assemble forward fuse. Attach fwd fuse bottom skin and final drill. Attach fwd center section bulkhead assembly to forward fuse subassembly.
 
22     Oct 22, 2020 Mid fuse bulkheads Fuselage 3   
Deburring and priming multiple parts
 
21     Oct 20, 2020 FWD Fuse Ribs Fuselage 0   
Page 28-2
Deburr, final drill, machine countersink Attach angles and outboard forward seat rail supports.
 
20     Oct 06, 2020 Mid Fuse Ribs Fuselage 0   
Page 26-4 to 26-5
Attaching seat rib subassemblies to aft center section bulkhead subassembly. Rivet ribs to bulkhead. Create rear seat rib subassemblies.
 
19     Oct 05, 2020 Mid Fuse Ribs Fuselage 0   
Page 26-2 to 26-3
Continue assembly of inboard seat ribs. Create outboard seat rib subassemblies. Deburr all parts. Rivet assemblies.
 
18     Oct 04, 2020 Mid Fuse Ribs Fuselage 0   
Page 26-2
Create reinforcing angles. Assemble inboard seat rib subassemblies. Deburring all parts.
 
17     Oct 03, 2020 Mid Fuse Bulkheads Fuselage 0   
Page 25-7 to 25-8
Assemble and rivet Rear spar bulkhead assembly. Assemble, drill, disassemble, deburr, prime and rivet Fuselage bulkhead assembly.
 
16     Oct 01, 2020 Mid fuse bulkheads Fuselage 0   
Page 25-7
Cleco and drill Rear spar bulkhead assembly. Disassemble and deburr all parts.
 
15     Sep 25, 2020 Mid Fuse Bulkheads Fuselage 0   
Page 25-5 to 25-6
Assemble and rivet the aft center section bulkhead assembly.
 
14     Sep 24, 2020 Mid Fuse Bulkheads Fuselage 0   
Page 25-5
Create aft seat rail subassemblies. Assemble, match drill and disassemble Aft center section bulkhead assembly. Deburr and countersink.
 
13     Sep 23, 2020 Mid Fuse Bulkheads Fuselage 0   
Pages 25-3 to 25-4
Match drilling landing gear mounts. Had to purchase new mount after drilling a hole in the wrong place.
Countersink bulkhead. Assemble and rivet FWD center section bulkhead assembly.
 
12     Sep 22, 2020 Mid Fuse Bulkheads Fuselage 0   
Pages 25-2 to 25-3
Create stiffener angles. Match drill stiffener angles. Attach and final drill mid seat rail supports. Match drill bulkhead and seat rail support assemblies.
 
11     Sep 21, 2020 Mid Fuse Bulkheads Fuselage 0   
Inventory of slow build fuselage
 
10     Aug 11, 2020 Empennage Attachment Empennage 1   
Pages 11-4 to 11-8
Attaching horizontal stabilizer. Attaching vertical stabilizer. Assembling pushrod. Attaching rudder.
 
9     Aug 03, 2020 Tailcone riveting, battery mount assembly Empennage 1   
Pages 10-23 to 10-24
Continue riveting tailcone skins
 
8     Aug 02, 2020 Tailcone assembly Empennage 0   
Pages 10-20 to 10-22
Continue riveting skins to tailcone assembly. Attaching aft deck and stops/doublers/angles. Attaching aft top skin and riveting in place.
 
7     Aug 01, 2020 Tailcone assembly Empennage 0   
Page 10/20
Reassemble tailcone after priming. Rivet skins to bulkheads, frames and stiffeners
 
6     Jul 30, 2020 Tailcone bulkhead riveting Empennage 0   
Page 10-18 to 10-19
Riveting tailcone bulkheads together.
 
5     Jul 25, 2020 Tailcone assembly Empennage 0   
Page 10-16 and 10-17
Battery channel prep. Battery/bellcrank mount prep. Elevator bell crank assembly
 
4     Jul 23, 2020 Tailcone assembly Empennage 0   
Page 10-15 and 10-16
Trim right side skin. Deburr all holes and edges. Dimple bulkhead holes. Countersinking and dimpling longhorns, skins, frames and bulkheads
 
3     Jul 21, 2020 Tailcone assembly Empennage 0   
Page 10-14
Attach shoulder harness anchors. Drill cover plate.
 
2     Jul 20, 2020 Aft deck drilling Empennage 0   
Attaching stop/doubler and angles to aft deck and final drilling all holes
 
1     Jul 19, 2020 Tailcone assembly and skins Empennage 0   
Section 10 Pages 8-12
Fabricate and attach rudder stop brace. Attach tailcone skins to bulkheads and longhorns. Attaching aft deck and horizontal stabilizer attachment angle. Match and final drilling. Attach and final drill top skins.
  ------------ ------------- Totals0    156   




NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.