Project: Heath     -     Project Summary     - Optional PDF document function
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
131     May 11, 2024 Squaring up fuse and tail surfaces Assembly 6 $0.00    4   
130     May 01, 2024 Attach engine Assembly 3 $0.00    4   
129     Apr 29, 2024 Lots of little things Assembly 6 $0.00    4   
128     Apr 15, 2024 Tail feathers Assembly 3 $0.00    4   
127     Apr 12, 2024 Final assembly Assembly 4 $0.00    4   
126     Apr 09, 2024 Color Coats Paint / Decals 27 $0.00    4   
125     Mar 18, 2024 Through silver Covering 36 $0.00    0   
124     Mar 18, 2024 Through silver Covering 100 $0.00    4   
123     Nov 14, 2023 Fabric gussets Covering 16 $0.00    4   
122     Oct 24, 2023 Finishing rib-stitching Covering 56 $0.00    3   
121     Aug 08, 2023 Finished applying fabric Covering 48 $0.00    4   
120     Jun 25, 2023 Covering update Covering 48 $0.00    4   
119     Apr 21, 2023 Covering prep continued Covering 3 $0.00    2   
118     Apr 20, 2023 Fuel strainer Fuel System 2 $0.00    1   
117     Apr 19, 2023 More prepping for covering Covering 6 $0.00    4   
116     Apr 16, 2023 Stripped right struts Covering 4 $0.00    2   
115     Apr 07, 2023 Rib stiffeners Covering 4 $0.00    1   
114     Mar 31, 2023 Ailerons and wings Covering 3 $0.00    4   
113     Mar 30, 2023 Prepping ailerons Covering 4 $0.00    4   
112     Mar 29, 2023 Varnish horns Covering 2 $0.00    3   
111     Mar 28, 2023 Rib bottoms Covering 1 $0.00    0   
110     Mar 28, 2023 Rudder and stabilizer horns Covering 3 $0.00    3   
109     Mar 28, 2023 Strut attach brackets Covering 3 $0.00    3   
108     Mar 27, 2023 Varnish ribs Covering 2 $0.00    0   
107     Mar 27, 2023 Wing ribs Covering $0.00    4   
106     Mar 25, 2023 Tach Drive Engine 4 $0.00    3   
105     Mar 22, 2023 Sanding and smoothing Covering 3 $0.00    4   
104     Mar 21, 2023 Fuselage prep Covering 4 $0.00    4   
103     Mar 20, 2023 Remove wings Covering 2 $0.00    4   
102     Mar 20, 2023 Timing cover Engine 1 $0.00    1   
101     Mar 15, 2023 Installed cylinder #4 Engine 4 $0.00    4   
100     Mar 15, 2023 Rotator Covering 2 $0.00    4   
99     Mar 14, 2023 More. Disasembly Covering 3 $0.00    4   
98     Mar 11, 2023 Dissassembly Covering 3 $0.00    4   
97     Mar 10, 2023 Engine remove and tach drive Engine 4 $0.00    4   
96     Feb 18, 2023 Prop Hub Puller Engine 1 $0.00    1   
95     Feb 13, 2023 Cracked cylinder Engine 3 $0.00    2   
94     Feb 09, 2023 Finished fuel cap Fuel System .5 $0.00    1   
93     Feb 09, 2023 Established weigh points for CG Misc 1 $0.00    1   
92     Feb 09, 2023 Plumb engine Firewall 2 $0.00    2   
91     Feb 05, 2023 Aileron fair lead Controls 1 $0.00    2   
90     Feb 05, 2023 Correct strut bolts Wings 2 $0.00    2   
89     Feb 05, 2023 Seat belt install Cockpit 1.5 $0.00    3   
88     Feb 04, 2023 Seat belts Cockpit 3 $0.00    4   
87     Dec 30, 2022 New seat belt setup Cockpit 2 $0.00    1   
86     Dec 30, 2022 Finished fuel cap Fuel System 1 $0.00    2   
85     Dec 29, 2022 Fuel gauge Fuel System 2 $0.00    2   
84     Dec 28, 2022 Seat belt attachments Cockpit 3 $0.00    3   
83     Dec 27, 2022 Replaced more bolts Misc 2 $0.00    2   
82     Dec 26, 2022 Correct bolts Engine 2 $0.00    3   
81     Dec 22, 2022 Firewall tweeks Engine 4 $0.00    4   
80     Dec 20, 2022 Ep engine for removal Engine 3 $0.00    4   
79     Dec 19, 2022 Measured for new AN hardware Misc 3 $0.00    4   
78     Dec 16, 2022 Stabilizer Controls 3 $0.00    3   
77     Dec 13, 2022 Final prep of cowling Cowling 4 $0.00    5   
76     Dec 12, 2022 Cowling finished Cowling 4 $0.00    4   
75     Dec 11, 2022 Adding rivnuts Cowling 3 $0.00    3   
74     Dec 10, 2022 Engine cowling Cowling 4 $0.00    4   
73     Dec 09, 2022 Finished fuselage cowling Cowling 3 $0.00    3   
72     Dec 08, 2022 Table top nibbler Misc 3 $0.00    4   
71     Dec 08, 2022 Fit fuselage cowling Cowling 3 $0.00    3   
70     Dec 06, 2022 Finished rivnut installation and eyebrow Cowling 3 $0.00    3   
69     Dec 06, 2022 Rivnuts and screws Cowling 2 $0.00    3   
68     Dec 05, 2022 Cowling fateners Cowling 2 $0.00    3   
67     Dec 04, 2022 Cut out aluminum for fuselage cowling Cowling 4 $0.00    3   
66     Nov 28, 2022 Fuselage cowling Cowling 4 $0.00    3   
65     Nov 27, 2022 Finished cowling mockup Cowling 4 $0.00    3   
64     Nov 23, 2022 Botttom of cowl Cowling 3 $0.00    3   
63     Nov 23, 2022 Started engine cowling fabrication Cowling 2 $0.00    3   
62     Nov 22, 2022 Installation. Of engine controls Cockpit 2 $0.00    2   
61     Nov 21, 2022 Tidied up misc items Misc 4 $0.00    4   
60     Nov 17, 2022 Fabricated choke cable bracket Instrument Panel 2 $0.00    3   
59     Nov 16, 2022 Fabricated Throttle assembly Instrument Panel 4 $0.00    3   
58     Nov 14, 2022 Finished rudder cables Controls 3 $0.00    3   
57     Nov 13, 2022 Tail skid, install seat, make new rudder cables Misc 4 $0.00    4   
56     Nov 11, 2022 Cowling to instrument panel Instrument Panel 2 $0.00    2   
55     Nov 10, 2022 Finished tail brace wires Empennage 3 $0.00    5   
54     Nov 08, 2022 Finished wing rigging Wings 3 $0.00    2   
53     Nov 07, 2022 Level and adjust struts Wings 4 $0.00    3   
52     Apr 24, 2022 Fabricated cylinder 3 header Engine 4 $0.00    4   
51     Apr 22, 2022 richter exhaust headers Engine 4 $0.00    3   
50     Apr 14, 2022 Finished gascolator installation Fuel System 3 $0.00    3   
49     Apr 08, 2022 Install fuel line Fuel System 3 $0.00    3   
48     Apr 07, 2022 Started plumbing Firewall 3 $0.00    3   
47     Apr 03, 2022 Finished controls Wings $0.00    3   
46     Apr 02, 2022 Drag/anti-drag wires Wings 2 $0.00    3   
45     Apr 01, 2022 Install left wing Wings 4 $0.00    3   
44     Mar 31, 2022 Mounted engine Firewall 3 $0.00    3   
43     Mar 30, 2022 Aileron cables Controls 4 $0.00    3   
42     Mar 27, 2022 Drag/anti drag wires Wings 3 $0.00    3   
41     Mar 26, 2022 Pulley brackets and offsets Controls 5 $0.00    3   
40     Mar 24, 2022 Finish elevator controls Controls 3 $0.00    3   
39     Mar 23, 2022 Final elevator cable assembly Controls 2 $0.00    3   
38     Mar 21, 2022 Finalize elevator cable Controls 3 $0.00    3   
37     Mar 12, 2022 Oil pressure and ignition Instrument Panel 2 $0.00    3   
36     Mar 11, 2022 Adjust elevator cables Controls 2 $0.00    4   
35     Mar 10, 2022 Control stick and cables Controls 3 $0.00    3   
34     Mar 09, 2022 Installed right struts Wings 2 $0.00    3   
33     Mar 08, 2022 Finished struts and sent off for welding Wings 3 $0.00    1   
32     Mar 07, 2022 Fabricate struts Wings 3 $0.00    3   
31     Mar 06, 2022 Prep engine for installation Firewall 3 $0.00    3   
30     Mar 05, 2022 Mounted right wing Wings 3 $0.00    3   
29     Mar 04, 2022 Cut down J3 struts to use on Heath Wings 4 $0.00    3   
28     Mar 01, 2022 Finish cables and prep wing for installation Wings 4 $0.00    3   
27     Mar 01, 2022 Finish cables and plrkep Wings $0.00    0   
26     Feb 28, 2022 preporation for mounting wwings Wings 4 $0.00    3   
25     Feb 24, 2022 control stick preparation Controls 4 $0.00    3   
24     Feb 22, 2022 modify floor board Controls 2 $0.00    1   
23     Feb 21, 2022 prep control stick Controls 3 $0.00    3   
22     Feb 04, 2022 Stabilizer control wires Controls 4 $0.00    3   
21     Jan 25, 2022 stabilizer brace wires Tail Feathers 3 $0.00    2   
20     Jan 24, 2022 tail brace wires Tail Feathers 2 $0.00    3   
19     Jan 24, 2022 tail brace wires Tail Feathers 2 $0.00    1   
18     Jan 22, 2022 stabilizer brace wires Tail Feathers 2 $0.00    2   
17     Jan 21, 2022 stabilizer horn brace wires Tail Feathers 2 $0.00    2   
16     Jan 20, 2022 rudder horn brace wires Tail Feathers 3 $0.00    3   
15     May 03, 2021 Rudder and elevator guides Tail Feathers 4 $0.00    3   
14     May 02, 2021 Installed horizontal and vertical stab Tail Feathers 3 $0.00    2   
13     Apr 26, 2021 Turtle deck Fuselage 3 $0.00    1   
12     Apr 25, 2021 Motor mount and wing supports Misc 4 $0.00    3   
11     Apr 24, 2021 Fuse assembly on gear Landing Gear 5 $0.00    6   
10     Apr 21, 2021 Gear assembly Landing Gear 5 $0.00    2   
9     Apr 18, 2021 Landing gear Landing Gear 8 $0.00    2   
8     Apr 10, 2021 Landing gear Landing Gear $8.00    0   
7     Feb 14, 2021 Strip all smaller parts Fuselage 24 $0.00    4   
6     Feb 12, 2021 Brought to sandlaster Fuselage 2 $0.00    0   
5     Jan 28, 2021 Masked for sandblasting and painting Fuselage 24 $0.00    0   
4     Jan 14, 2021 Strip fuselage and other metal parts Fuselage 40 $0.00    1   
3     Nov 20, 2020 New floor boards Cockpit 6 $0.00    2   
2     Nov 13, 2020 Pickup of Heath project Retrieve 1 $0.00    4   
1     Nov 01, 2020 Uncover, disassemble and inspect Inspection 12 $0.00    7   
------------ -------------- -------------
Totals786    $8.00    375   