Project: Heath   -  
            All Modified Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Paul Isakson   -  
Project:   Plans-built Heath   -   VIEW REPORTS
Total Hours:780
Total Flight Time:
Total Expense:$8.00
Start/Last Date:Oct 11, 2020 - No Finish Date
Engine:Heath-Henderson
Propeller:St Croix
 
Friendly URL: https://eaabuilderslog.org?s=Heath

Home or Last Project Picture

May 01, 2024     Attach engine - (3 hours)       Category: Assembly
Mounted engine and marked tach cable hole and drilled 7/8”. Installed gascolator rod, oil line, and tach cable. Fixed lower left motor mount attachment.


 
Apr 29, 2024     Lots of little things - (6 hours)       Category: Assembly
Started engine and tach works. Cotter keyed all landing gear bolts. Cotter keyed other misc bolts. Safetied hinge pins on elevator.
Finished bolting of engine mount. Installed tachometer.


 
Apr 15, 2024     Tail feathers - (3 hours)       Category: Assembly
Installed all the bracing wires on the tail surfaces, including leather patches where the control wires exit the fuselage.


 
Apr 12, 2024     Final assembly - (4 hours)       Category: Assembly
Cable holes in fuse identified and cut out. Cables run. Tail feathers installed.


 
Apr 09, 2024     Color Coats - (27 hours)       Category: Paint / Decals
Applied finish coats to all parts. Started reassembly.


 
Mar 18, 2024     Through silver - (36 hours) Category: Covering
Adding more hours. 100 hours max.
 
Mar 18, 2024     Through silver - (100 hours)       Category: Covering
Using the Stits process, white poly brush was applied followed by coats of poly spray. All seams ironed before applying the poly spray wet sanded between coats. Ready for final finish.


 
Nov 14, 2023     Fabric gussets - (16 hours)       Category: Covering
Fabricated fabric gussets were needed. 49 in total plus 5 doilies for inspection rings.


 
Oct 24, 2023     Finishing rib-stitching - (56 hours)       Category: Covering
Finishing rib stitching on all surfaces. Time for finish tapes.


 
Aug 08, 2023     Finished applying fabric - (48 hours)       Category: Covering
Finished covering the fuselage today. Wings and tail surfaces are now covered. Start with poly brush next week.


 
Apr 21, 2023     Covering prep continued - (3 hours)       Category: Covering
Installed fuel tank. Prepared covering supplies. Cleaned shop up.


 
Apr 20, 2023     Fuel strainer - (2 hours)       Category: Fuel System
Fabricated fuel strainer for fuel tank


 
Apr 19, 2023     More prepping for covering - (6 hours)       Category: Covering
Finished stripping struts and they are ready for sand blasting and powder coating. Removed wing strut attach brackets for sand blasting and powder coating. Pressure tested fuel tank at 3psi overnight and ready for installation. Installed inter rib bracing on left wing.


 
Apr 16, 2023     Stripped right struts - (4 hours)       Category: Covering
Stripped right side struts and oiled the insides.


 
Apr 07, 2023     Rib stiffeners - (4 hours)       Category: Covering
Finished installing 1/4 x 1/4 spruce strips to strengthen ribs. Coated with varnish.


 
Mar 31, 2023     Ailerons and wings - (3 hours)       Category: Covering
Varnished ailerons. They are ready to cover. Started adding 1/4 x. 1/4 spruce strips between the ribs t strengthen the wings when shrinking the fabric.


 
Mar 29, 2023     Varnish horns - (2 hours)       Category: Covering
Applied first coat of varnish to tail horns. Sealed fuselage fairing strips with varnish where they were sanded.


 
Mar 28, 2023     Rib bottoms - (1 hour) Category: Covering
Varnished the sanded rib bottoms.
 
Mar 28, 2023     Rudder and stabilizer horns - (3 hours)       Category: Covering
Stripped the white paint off of the rudder and stabilizer horns. Polished the brass ends out the horns.


 
Mar 28, 2023     Strut attach brackets - (3 hours)       Category: Covering
Removed, stripped, and primed strut attach brackets on wings.


 
Mar 27, 2023     Varnish ribs - (2 hours) Category: Covering
Coated the bare spots on the bottom ribs with spar varnish.
 
Mar 25, 2023     Tach Drive - (4 hours)       Category: Engine
Bob Power brought the timing cover by today. Installed tch drive adaptor and final. Fitted internal drive adapter.


 
Mar 22, 2023     Sanding and smoothing - (3 hours)       Category: Covering
Sanded all the fuselage fairing strips. Sanded rib tops on both wings. Blocked up and spaced the fuel tank so all the weight is not on the mounting brackets.


 
Mar 21, 2023     Fuselage prep - (4 hours)       Category: Covering
Removed all the parts down to bare fuselage. Safetied all hardware not already done. Installed and spaced fuselage fairing strips on all sides and bottom. Fuselage installed on rotisery.


 
Mar 20, 2023     Remove wings - (2 hours)       Category: Covering
Removed strut nuts to ready wing removal. Round-end struts go on left side. See pics.


 
Mar 20, 2023     Timing cover - (1 hour)       Category: Engine
Marked center of timing cover for hole to drill tachometer adaptor. Thanks Bob Power.


 
Mar 15, 2023     Installed cylinder #4 - (4 hours)       Category: Engine
Lapped the valves and reassembled the #4 cylinder. Installed intake and exhaust manifold


 
Mar 14, 2023     More. Disasembly - (3 hours)       Category: Covering
Removed ailerons, cables, engine mount, seat belt attachments, fuel line, and throttle quadrant.


 
Mar 11, 2023     Dissassembly - (3 hours)       Category: Covering
Removed rear flight controls-horizontal and vertical. Tied up cables on inside of fuselage. Marked all the flying wires for future assembly. Bagged and marked all hardware.


 
Mar 10, 2023     Engine remove and tach drive - (4 hours)       Category: Engine
Removed engine from airframe and installed on stand. Removed timing cover to make a tool to find center of of hole for tach drive adapter to be installed in new timing cover. Original timing cover hole was off-center and not useable. Tach adaptor has a 3/4”-18 thread and is non-standard. Will order a tap. Repaired cylinder is done and I will pickup on Monday.


 
Feb 18, 2023     Prop Hub Puller - (1 hour)       Category: Engine
Fabricated a prop hub puller today.


 
Feb 13, 2023     Cracked cylinder - (3 hours)       Category: Engine
I found a cracked cylinder around the spark plug hole while doing a leak down test. Cylinders 1-3 were. 80/80 and #4 was 60. Upon further inspection found the leak. Removed the cylinder and am scheduled to bring it to Crow Custom Cast Welding in Hudson Wi tomorrow.


 
Feb 05, 2023     Correct strut bolts - (2 hours)       Category: Wings
Replaced strut bolts at wing and fuselage attachment with correct AN hardware.


 
Feb 09, 2023     Finished fuel cap - (.5 hour)       Category: Fuel System
Bent fuel rod of float on fuel cap float.


 
Feb 09, 2023     Established weigh points for CG - (1 hour)       Category: Misc
CG is 15.5” from leading edge. Wheel weigh point 6 5/16” from leading edge. Tail skid weigh point 157” from leading edge.


 
Feb 09, 2023     Plumb engine - (2 hours)       Category: Firewall
Removed cowling and assembled fuel and oil pressure lines. Hooked up fuel shutoff rod. Removed tachometer for installation of electronic tac.


 
Feb 05, 2023     Aileron fair lead - (1 hour)       Category: Controls
Fastened HMWP friction block to fair lead by tapping 6-32 and using 6-32 truss head screw and reinstalled on wing.


 
Feb 05, 2023     Seat belt install - (1.5 hours)       Category: Cockpit
Installed seat and shoulder harness. Ready for final fitting.


 
Feb 04, 2023     Seat belts - (3 hours)       Category: Cockpit
Found a suitable set of seat belts to modify for installation. Includes lap and shoulder belts. Removed anchor points from lap belt.
New anchor points will be installed to tie into fuselage. Belt anchor point brazed and installed.


 
Dec 30, 2022     New seat belt setup - (2 hours)       Category: Cockpit
Fabricated seat belt holder clamps. I am going to redo the seat belt holders.


 
Dec 30, 2022     Finished fuel cap - (1 hour)       Category: Fuel System
Sealed the cork and painted the cap.


 
Dec 29, 2022     Fuel gauge - (2 hours)       Category: Fuel System
Fabricated fuel gauge. Sight gauge with float going through fuel cap.


 
Dec 28, 2022     Seat belt attachments - (3 hours)       Category: Cockpit
Fabricated seat belt to fuselage attachments. They will have to brazed in place.


 
Dec 27, 2022     Replaced more bolts - (2 hours)       Category: Misc
Plugging forward with bolt replacement. Easier said than done.


 
Dec 26, 2022     Correct bolts - (2 hours)       Category: Engine
Swapped out non-AN hardware on engine mount and mount to fuse to correct AN bolts and hardware.


 
Dec 22, 2022     Firewall tweeks - (4 hours)       Category: Engine
Finished installing rivnuts for bottom cowl pan. Finished gascolator bracket fastening.


 
Dec 20, 2022     Ep engine for removal - (3 hours)       Category: Engine
Took pictures of engine mount details. Removed hoses and wires and now ready for removal.


 
Dec 19, 2022     Measured for new AN hardware - (3 hours)       Category: Misc
Replaced AN hardware with what I have in stock and measured for what else is needed. Will place order soon.


 
Dec 16, 2022     Stabilizer - (3 hours)       Category: Controls
Securely fastened plexiglass chafe plates for stabilizer cables. Replaced stabilizer cable junction bolts with new AN. Replaced stabilizer and rudder hardware with new AN. I will replace all old fasteners with new AN hardware.


 
Dec 13, 2022     Final prep of cowling - (4 hours)       Category: Cowling
Removed and deburred all edges and corners. Finalized and fitted the cowling for easy installation. Cross-bent side cowling pieces to stiffen them up. Reassembled and checked final fitment. It is good and tight fitting.


 
Dec 12, 2022     Cowling finished - (4 hours)       Category: Cowling
Finished installing rivnuts for engine cowl. All screws fit nicely. Still need to install rivnuts on the trailing edge of cowl bottom pan.


 
Dec 11, 2022     Adding rivnuts - (3 hours)       Category: Cowling
Added rivnuts to fasten the cowling pieces together. Did the left side.


 
Dec 10, 2022     Engine cowling - (4 hours)       Category: Cowling
Cut and fabricated front and bottom cowl pieces from .032 2021 T3 aluminum. cut, bend, recut and final fitted. I am going to fasten it all together with clecos after which I will install 8-32 rivnuts.


 
Dec 09, 2022     Finished fuselage cowling - (3 hours)       Category: Cowling
Finished the upper fuselage cowling with correct screws. It looks swell. Practiced cutting on the bench top nibbler and that went well also.


 
Dec 08, 2022     Fit fuselage cowling - (3 hours)       Category: Cowling
Final fitting of fuselage cowing. Attached wood strips to for attachment of cowling to fuselage wit AN742 clamps.


 
Dec 06, 2022     Finished rivnut installation and eyebrow - (3 hours)       Category: Cowling
Installed rivnuts that finished cowl installation. Fabricated eyebrow and installed. Rolled front edge of eyebrow to stiffen it. Cut out left and right side panels for engine compartment.


 
Dec 06, 2022     Rivnuts and screws - (2 hours)       Category: Cowling
Attached fuselage cowling to firewall and instrument panel with 8-32 and 6-32 truss head machine screws. it actually went quite well.


 
Dec 05, 2022     Cowling fateners - (2 hours)       Category: Cowling
Fabricated L-brackets with nut plates to fasten fuselage cowl to instrument panel.


 
Dec 04, 2022     Cut out aluminum for fuselage cowling - (4 hours)       Category: Cowling
Cut out .020 aluminum sheet from tagboard mockups. Rolled aluminum sheeting to match match fuselage curve. Folded cockpit edge to stiffen.


 
Nov 28, 2022     Fuselage cowling - (4 hours)       Category: Cowling
Mocked up forward fuselage covering over instrument bay and cockpit. Mock-ups are ready to go templates.


 
Nov 27, 2022     Finished cowling mockup - (4 hours)       Category: Cowling
Fabricated front of engine cowling attachment point from .020 2021T3 aluminum. Fabricated cowl sides and bottom from tag board.


 
Nov 23, 2022     Botttom of cowl - (3 hours)       Category: Cowling
Cut bottom cowl out of tag board. Worked on getting a close fit.


 
Nov 23, 2022     Started engine cowling fabrication - (2 hours)       Category: Cowling
Cut tag board mockup of engine cowling. Did the front and the sides.


 
Nov 22, 2022     Installation. Of engine controls - (2 hours)       Category: Cockpit
Installed varnished throttle panel and throttle control. Installed choke cable.


 
Nov 21, 2022     Tidied up misc items - (4 hours)       Category: Misc
Installed rivnuts on clamps for throttle panel. Fabricated fair lead for aileron through cable on center top of wing. Cut choke cable and now is ready for installation. 3 coats of varnish on throttle panel.


 
Nov 16, 2022     Fabricated Throttle assembly - (4 hours)       Category: Instrument Panel
Fabricated I/4” plywood panel to anchor throttle and choke controls. Fabricated throttle lever and control rod.


 
Nov 17, 2022     Fabricated choke cable bracket - (2 hours)       Category: Instrument Panel
Fabricated bracket to mount choke cable. Will mount below throttle level.


 
Nov 14, 2022     Finished rudder cables - (3 hours)       Category: Controls
Installed turnbuckles on rudder cables and whipped with 40# nylon casting line and coated with crazy glue. Whipped remaining unfinished cables ends. The control system is now finished.


 
Nov 13, 2022     Tail skid, install seat, make new rudder cables - (4 hours)       Category: Misc
Started tail skid fabrication. Installed seat and fastened down floor boards. Ran new rudder cables. Ready for turn buckets to be installed.


 
Nov 11, 2022     Cowling to instrument panel - (2 hours)       Category: Instrument Panel
Fabricated cowling to instrument panel mounting brackets.


 
Nov 08, 2022     Finished wing rigging - (3 hours)       Category: Wings
Tightened up all the drag and anti drag cables and rechecked rigging. All is good


 
Nov 07, 2022     Level and adjust struts - (4 hours)       Category: Wings
Fall is here and time to restart my project. Leveled fuselage and adjusted wing struts for level and then adjusted rear struts to get 2 degree incidence.


 
Apr 24, 2022     Fabricated cylinder 3 header - (4 hours)       Category: Engine
Created a jig to fabricate the #3 header. Fitted 2 pieces with a flange for welding. Welded up by Jason B. Installed and cut to length. I made up 2 sets of headers.


 
Apr 22, 2022     richter exhaust headers - (4 hours)       Category: Engine
Fabricating exhaust headers. Built a jig to hold exhaust flanges and pipes for spot welding. I made 6. The last one has to be routed around the carb and I will make that jig when these are welded.


 
Apr 14, 2022     Finished gascolator installation - (3 hours)       Category: Fuel System
Ran fuel line from gascolator to carb. Fabricated shut off tube and fit to gascolator. Started on fabricating exhaust stack welding jig.


 
Apr 08, 2022     Install fuel line - (3 hours)       Category: Fuel System
Bent 5/16' copper fuel line from tank to gascolator. Mounted Gascolator and install appropriate fittings. Need 1/8” npt to 1/4” brass fitting for line to carb.


 
Apr 07, 2022     Started plumbing - (3 hours)       Category: Firewall
Installed mag switch and wiring. Started installation of fuel system. Will be using Tillotson gascolator. Drilled appropriate holes for oil pressure line and wiring Ann installed rubber grommets.


 
Apr 03, 2022     Finished controls       Category: Wings
Fabricated aileron balancing cable and installed. Finished control stick to left aileron cable and installed. Ready to plumb the engine.


 
Apr 02, 2022     Drag/anti-drag wires - (2 hours)       Category: Wings
Fabricated left side drag/anti-wires and install. Mounted left aileron.


 
Mar 31, 2022     Mounted engine - (3 hours)       Category: Firewall
Mounted engine, fits perfectly.ready to prepare left wing for installation.


 
Mar 30, 2022     Aileron cables - (4 hours)       Category: Controls
Fabricated control stick tonight aileron cable. Also 1/2 of the left cable


 
Mar 27, 2022     Drag/anti drag wires - (3 hours)       Category: Wings
Fabricated drag/anti drag wires for right wing and installed. Really stiffened up the wing.


 
Mar 26, 2022     Pulley brackets and offsets - (5 hours)       Category: Controls
Fabricated 4 aileron pulley brackets and standoffs.


 
Mar 24, 2022     Finish elevator controls - (3 hours)       Category: Controls
Crimped and silver soldered copper stops on control still elevator cables. Trimmed elevator cables at elevator and whipped the ends.


 
Mar 23, 2022     Final elevator cable assembly - (2 hours)       Category: Controls
Installed plexiglass dividers to separate cables from rubbing. Installed copper stops on cable at control stick. Everything works great.


 
Mar 21, 2022     Finalize elevator cable - (3 hours)       Category: Controls
Pictures describe the actual work better than words. Black tubing used is high density nylon 66. Bent up upper elevator cable nylon guide with a little heat. Whipped cable ends.


 
Mar 12, 2022     Oil pressure and ignition - (2 hours)       Category: Instrument Panel
Cut hole for ignition switch and fit oil pressure gauge. Fabricated 1/4” oil pressure line.


 
Mar 11, 2022     Adjust elevator cables - (2 hours)       Category: Controls
Adjusted elevator cable travel so they don't chafe on fuse tubing. Will have to add a piece of plexiglass to protect the belly from chafing. I also added rudder cable guides to the bottom of the seat.


 
Mar 10, 2022     Control stick and cables - (3 hours)       Category: Controls
Mounted control stick with friction tubes and cables for elevators. Found some cable travel issues and will have to correct.


 
Mar 09, 2022     Installed right struts - (2 hours)       Category: Wings
Picked up struts from welder. Installed on right wing. They fit great.


 
Mar 08, 2022     Finished struts and sent off for welding - (3 hours)       Category: Wings
finished cut4ting down struts and sent to welder. Ordered parts for drag and anti drag wires. Mounted oil gauge


 
Mar 07, 2022     Fabricate struts - (3 hours)       Category: Wings
cut and insert doubler. 2 are ready for welding. Finish the other 2 tomorrow.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.