Project: Heath   -  
            Listing for Category : assembly
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Paul Isakson   -  
Project:   Plans-built Heath   -   VIEW REPORTS
Total Hours:794
Total Flight Time:
Total Expense:$8.00
Start/Last Date:Oct 11, 2020 - No Finish Date
Engine:Heath-Henderson
Propeller:St Croix
 
Friendly URL: https://eaabuilderslog.org?s=Heath

Home or Last Project Picture

May 23, 2024     Wing control assembly - (8 hours)       Category: Assembly
Rigged wings, aligned bolts for cotter pins. Ran aileron cables and adjusted. Plumbed fuel tank.


 
May 11, 2024     Squaring up fuse and tail surfaces - (6 hours)       Category: Assembly
Leveled and squared fuse. Tightened all bracing cables and wires. Safetied all turn buckles.


 
May 01, 2024     Attach engine - (3 hours)       Category: Assembly
Mounted engine and marked tach cable hole and drilled 7/8”. Installed gascolator rod, oil line, and tach cable. Fixed lower left motor mount attachment.


 
Apr 29, 2024     Lots of little things - (6 hours)       Category: Assembly
Started engine and tach works. Cotter keyed all landing gear bolts. Cotter keyed other misc bolts. Safetied hinge pins on elevator.
Finished bolting of engine mount. Installed tachometer.


 
Apr 15, 2024     Tail feathers - (3 hours)       Category: Assembly
Installed all the bracing wires on the tail surfaces, including leather patches where the control wires exit the fuselage.


 
Apr 12, 2024     Final assembly - (4 hours)       Category: Assembly
Cable holes in fuse identified and cut out. Cables run. Tail feathers installed.


 