103     Apr 26, 2023 Ready for flight? Wings 2.5 $0.00    1   
Wings aligned and attached for first time
 
102     Apr 19, 2023 Post Hanger Trip Rudder 2 $0.00    3   
pictured is two high density plastic parts that are countersunk and tapped, a team bending the canopy frame into place, and a team securing the flapperon torque tubes
 
101     Apr 12, 2023 Baby's first steps! Landing Gear 0.5 $0.00    3   
Today, we finished attaching our landing gear to the plane and our Van's RV-12 took her very first steps! Here are pictures of groups working on the rudder, attaching the breaks onto the landing gear, and the entire Aerolab team standing with our plane standing on her own!
 
100     Apr 05, 2023 Greasing parts Landing Gear $0.00    1   
Greasing part of landing gear assembly
 
99     Apr 05, 2023 Frontal landing gear support Rudder $0.00    1   
 
98     Apr 05, 2023 Flap crank assembly Rudder $0.00    1   
Flap crank assembly
 
97     Mar 22, 2023 Vans RV-7 Rudder Rudder 3.5 $0.00    1   
Dimpling the new rudder for the RV-7.
 
96     Mar 22, 2023 Engine mount Engine 3.5 $0.00    0   
Installing the upper forward engine mount.
 
95     Mar 22, 2023 Flaperon pushrod Wings 3.5 $0.00    1   
Using the mill to drill holes in the flaperon pushrod.
 
94     Mar 22, 2023 Hinges for lower cowl Fuselage 3.5 $0.00    1   
Starting to work on the cowl by securing the lower hinges.
 
93     Mar 22, 2023 Roll Bar Fuselage 3.5 $0.00    1   
Securing the roll bar to the fuselage.
 
92     Mar 08, 2023 Assembled rear bulkhead Fuselage $0.00    1   
Put together three pieces, test fitting but not riveting
 
91     Mar 08, 2023 F1202 B firewall panelbase Fuselage $0.00    0   
Attached to the front of the fuselage
 
90     Mar 08, 2023 Attaching the rollbar Fuselage $0.00    1   
Rollbar attachment
 
89     Mar 01, 2023 canopy rib Fuselage 3.5 $0.00    1   
clecoing the canopy rib assemblies
 
88     Mar 01, 2023 flap crank Fuselage 3.5 $0.00    1   
securing the flap crank assembly
 
87     Mar 01, 2023 roll bar Fuselage 3.5 $0.00    1   
deburring the roll bar
 
86     Mar 01, 2023 control stick rod Controls 3.5 $0.00    1   
Installing control stick rod bearings with washers
 
85     Feb 22, 2023 Sealing the Deal (Deal = Firewall) Fuselage 3.5 $0.00    8   
This week in Aerolab, teams came together to attach their separately assigned parts to the RV7, marking our overall progress. As Aerolab was split into teams, one team applied the fuel tank sealant to firewall penetrations for the fuel line. Another team was match-drilling the door handles on the outer frame, while the other is seen adding stiffeners to the RV7 rudder. The final team was countersinking the rollbar, which is the frame for the RV7 and where the plexiglass will be placed.
 
84     Feb 22, 2023 More exciting photos of our work on the fuselage (+ rudder)! Workshop 3.5 $0.00    8   
Picture 1: Back riveting the rudder.
Picture 2: Working on riveting flange bearings to the flaperon mixer bellcrank.
Picture 3: Installing brake lines.
Picture 4: Attaching the brake reservoir to the firewall. Working on riveting flange bearings to the flaperon mixer bellcrank.
Picture 5: Adjusting the countersink cage for the roll bar assembly.
Picture 6: Riveting F-12116 hinges to upper firewall assembly (Front) Attaching vent door handles (Middle) Riveting top edge of and match-drilling inside of rollbar assembly (Back).
Picture 7: Drilling out a bad rivet.
Picture 8: Dimpling the rudder stiffner.
 
83     Feb 08, 2023 2/8/23 Assorted Projects! Fuselage 3.5 $0.00    5   
Today we began assembling the flight controls, installed the panel base for the upper firewall, and fabricated a shim and drill-fitted it onto the rudder skeleton.
 
82     Jan 18, 2023 First day working with the new spring team! Fuselage 1.5 $0.00    6   
Today 12 new members were introduced to the spring team and we began working on the fuselage skins. Put in lots of rivets and clecos!
 
81     Dec 07, 2022 Last Day! Fall 2022 Workshop 3 $0.00    3   
Today's our last day of working on the Vans RV-12iS for the fall semester! The side skins of the fuselage are being integrated, the rudder pedals have been successfully installed, and the firewall is well underway to be continued in the spring. Enjoy some pictures of AeroLab members hard at work before finals week!

A big thank you to Professor Harris and the rest of the team for making this semester a memorable one! Now, onwards to winter break!
 
80     Nov 30, 2022 Riveting is riveting! Workshop 3 $0.00    5   
Picture 1: A happy team attaching the roll bar to the fuselage.
Picture 2: Nothing more thrilling than filing the edges of the aircraft skin.
Picture 3: Upper fuselage (not pictured Henry, who is deep in thought elsewhere).
Picture 4: The first longeron to be produced!!
Picture 5: Making sure the plane has brakes.
 
79     Nov 16, 2022 Build Update! Workshop $0.00    5   
Photo 1: Working on rudder pedals (trying to lock)- Ch. 28, page 2 step 3
Photo 2: Ch. 23, page 4, step 5 - dimpling!
Photo 3: Team working on the floorboards and riveting (enjoying listening to the soundtrack of Frozen)
Photo 4: Prof. Harris and team building base of avionics panel
Photo 5: Shreya ordering a F-1201H (part), and working on upper firewall assembly
 
78     Nov 02, 2022 Working on the airplane! Fuselage 3 $0.00    6   
Coolest day of the class (in my opinion). We had a little field trip to the cable airport to see the cute yellow airplane. Many of us got to sit in it and took pictures. Then, prof Harris took off on it and went 150mph (I think) in a low pass to a rapid ascend. It was super cool and everyone was amazed. Then we came back and continued building the airplane.

Pic 0: Making rectangles! (making hinges)
Pic 1: Working on the lower fuselage
Pic 2: Assembling firewall
Pic 3: Assembling seat ribs
 
77     Oct 12, 2022 Fuselage update Fuselage 3 $0.00    3   
Photo 1: Small parts assembly by Raphael and Kyle
Photo 2: Luis deburring the seat ribs while Joe marks parts where plastic film will be removed.
Photo 3: Kirill, Shreya and Henry trying to figure out how to rivet a difficult piece on mid fuselage
 
76     Sep 21, 2022 Progress Journal 09/21/33 Empennage 3 $0.00    4   
Our little Mudd bees are at work during our first full work class. In the first picture, we have a team working on the rib of the mid-fuselage. In the second picture, we have another team working on the lower fuselage. Here the worker bees are in action riveting lots of nut plates. Next, we have the most important bees at work. They are creating the seat back and ensuring that the pilot gets the proper lumbar support they deserve. Lastly, we have a team working on riveting the primary structure. It is a very exciting day to be a worker bee at Mudd!
 
75     Sep 14, 2022 Fuselage Updates Fuselage 3 $0.00    0   
Rollover structure & forward lower fuselage structure were being happily assembled on this day!
 
74     Sep 07, 2022 First Aerolab of Fall 2022! Workshop 3 $0.00    4   
Welcome to AeroLab for Fall 2022!

Today we learned how to rivet, deburr, use the vertical bandsaw to cut metal sheets, drill, and use sheet metal tools! We're excited to share this journey with you all; we hope you follow us along!

Happy hacking,
The F22 Aerolab Team
 
73     Apr 27, 2022 Empennage Complete Empennage $0.00    0   
Finished hard-to-reach screws holding DSUB connector on empennage for servo motor. This wraps up the empennage and wings. The team is now waiting on the fuselage kit, which we ordered last spring. We expect it to arrive this summer and the next class will work on it in the fall.
 
72     Mar 23, 2022 Riveting Stiffening Clips Wings $0.00    1   
Drilled out rivets, Put rivets in stiffening clips
 
71     Mar 23, 2022 Pushrod to actuator to stabilator Wings $0.00    1   
attaching the pushrod to the actuator to the stabilator
 
70     Mar 23, 2022 Riviting wing tips skins Wings $0.00    2   
Riveted the wing tips to install the extensions of the molex connector.
 
69     Mar 02, 2022 Wing Fairing Electrical Wings 2 $0.00    1   
Sanding of flox in molding of fiberglass wing tip light mounts, preparation of electrical wiring related to the area.
 
68     Mar 02, 2022 Electrical Work on Wings Wings 2 $0.00    1   
Attachment of lighting devices to interior of wing fairings and electrical wiring work.
 
67     Mar 02, 2022 Positional Lights Installed Wings 2 $0.00    2   
Positional lights on both wings continuous tested, installed with Plexiglas covers; bolting and riveting in immediate area completed.
 
66     Feb 23, 2022 Empennage tip fairings Empennage 5 $0.00    1   
Fiberglass caps secured onto tailcone assembly
 
65     Feb 23, 2022 Wing lights Wings 3 $0.00    1   
Drill holes and countersink and deburr
 
64     Feb 23, 2022 Wing tip Wings 2 $0.00    1   
Epoxied wing tip and applied release
 
63     Feb 23, 2022 Stabilator Fairings Stabilator 3 $0.00    1   
Fitting fiberglass fairing to stabilator
 
62     Dec 08, 2021 Stabilator Assembly Stabilator 2 $0.00    1   
Installing the AST assembly onto the stabilator assembly.
 
61     Dec 08, 2021 Wing Lights Wings 2 $0.00    2   
Installing the wing lights.
 
60     Dec 08, 2021 Building the Servo Empennage 1.5 $0.00    1   
Installing and building the servo and push rod assembly.
 
59     Dec 08, 2021 Tailcone Assembly Tailcone 3 $0.00    2   
Attaching the vertical-stabilizer assembly to the tailcone assembly using fasteners, installing the lower hinge assembly, and temporarily installing the rudder assembly.
 
58     Dec 01, 2021 Light covers Lighting 3 $0.00    1   
Machined the plexiglass into spec
 
57     Dec 01, 2021 Clevis alignment Empennage 1 $0.00    1   
Constructing the clevis alignment template to align the clevis
 
56     Dec 01, 2021 Fitting the stabilator assembly to the tailcone Empennage 2 $0.00    2   
Checking the fit of the F-1211 Assembly hinges with the stabilator assembly hinge brackets
 
55     Dec 01, 2021 Riveting install doublers to servo tray Tailcone 1.5 $0.00    1   
 
54     Dec 01, 2021 Gluing felt into the tool cabinet Tools 0.5 $0.00    1   
 
53     Nov 17, 2021 Riveting skins to stabilator Stabilator 3 $0.00    1   
Riveting the skins to the stabilator
 
52     Nov 17, 2021 Riveting the skins to the wing Wings 3 $0.00    1   
Riveting skins to the left wing
 
51     Nov 17, 2021 Riveting skins to tailcone Tailcone 3 $0.00    1   
Riveting the skins to the tailcone
 
50     Nov 03, 2021 Stabilator-- mass riveting Stabilator 2.5 $0.00    0   
All rivets on one side and most rivets on other side installed
 
49     Nov 03, 2021 Attaching skin, wires to tailcone Tailcone 2.5 $0.00    1   
Attaching skin and wires to the tailcone from the inside
 
48     Nov 03, 2021 Wing Light Installation Wings 2.5 $0.00    1   
Installing the covers for the landing lights on the wings
 
47     Nov 03, 2021 Stripped Bolt Extraction Process V Stabilizer 2.5 $0.00    2   
Vertical Stabilizer team work on extracting a stripped bolt.
 
46     Oct 27, 2021 Vertical Stabilizer Skins V Stabilizer 1.5 $0.00    1   
Adding the skins to the vertical stabilizer
 
45     Oct 27, 2021 Stabilator skins Stabilator 1.5 $0.00    2   
Adding the skins to the stabilator
 
44     Oct 27, 2021 Wing skins Wings 1.5 $0.00    1   
Finishing adding the skins to the wings. Focusing on the wing tip.
 
43     Oct 27, 2021 Installing the static air system Tailcone 1.5 $0.00    3   
 
42     Oct 20, 2021 Stabilator Ribs Stabilator 2.5 $0.00    3   
Attached the stabilator ribs to the spar.
 
41     Oct 20, 2021 Tailcone fuselage bulkhead and skins Tailcone 2.5 $0.00    3   
Prepped the tailcone for the fuselage bulkhead and skins. Attached the fuselage bulkhead.
 
40     Oct 20, 2021 Prepping and attaching V Stabilizer Skin V Stabilizer 2.5 $0.00    2   
Prepared and attached the main skin for the vertical stabilizer.
 
39     Oct 20, 2021 Wing Tips Wings 2.5 $0.00    2   
Manufactured landing light cover, attached wing tip aft skin
 
38     Oct 13, 2021 Bending tabs on wing tips Wings 2.5 $0.00    1   
 
37     Oct 13, 2021 Constructing tailcone-fuselage bulkhead Tailcone $0.00    1   
 
36     Oct 13, 2021 Assembling tailcone Tailcone $0.00    1   
 
35     Oct 13, 2021 aft spar for stabilator Stabilator $0.00    1   
 
34     Oct 13, 2021 Fore spar for stabilator Stabilator 2.5 $0.00    1   
 
33     Oct 13, 2021 Riveting spar caps (v. stabilizer) V Stabilizer 2.5 $0.00    1   
 
32     Oct 06, 2021 Assembling ribs for vertical stabilizer V Stabilizer 3 $0.00    1   
 
31     Oct 06, 2021 Assembling spar cap assembly Stabilator 3 $0.00    1   
 
30     Oct 06, 2021 Match drilling Fuselage bulkhead Tailcone 3 $0.00    1   
 
29     Oct 06, 2021 Priming and sealing the Wing Walks Wings 3 $0.00    1   
 
28     Oct 06, 2021 Assembling Tailcone Skins Tailcone 3 $0.00    1   
 
27     Sep 29, 2021 Deburring Tailpieces Tailcone 3 $0.00    1   
 
26     Sep 29, 2021 Affixing Rudder Skin Rudder 3 $0.00    1   
 
25     Sep 29, 2021 Match Drilling Piano Hinges AntiServoTab 3 $0.00    1   
 
24     Sep 29, 2021 Inspecting wing ribs Wings 3 $0.00    1   
 
23     Sep 29, 2021 Assembling vertical stabilizer hinges V Stabilizer 3 $0.00    1   
 
22     Sep 29, 2021 Attatching spar caps to the spars Stabilator 3 $0.00    1   
 
21     Sep 22, 2021 Riveting the wings Wings 3 $0.00    2   
Riveting on the wing skins for the right wing
 
20     Sep 22, 2021 Riveting the rudder Rudder 3 $0.00    2   
Squeeze riveting the rudder horn to the rudder spar
 
19     Sep 22, 2021 Riveting Anti-Servio Tab AntiServoTab 3 $0.00    2   
Riveting the control horn to the Anti-Servio Tab
 
18     Sep 22, 2021 Fabricating the skid bracket for the tail cone Tailcone 3 $0.00    2   
Match drilling holes in the skid bracket for the tail cone
 
17     Sep 22, 2021 Assembling the spar cap for the stabilator Stabilator 3 $0.00    1   
Connecting the spars to the spar cap for the stabilator
 
16     Sep 22, 2021 Preparing the spar for the vertical stabilizer V Stabilizer 3 $0.00    1   
Drilling and deburring holes for riveting the spar caps to the spar for the vertical stabilizer
 
15     Sep 15, 2021 Hinge Angle and Horn Attach Angle for Stabilator Stabilator 3 $0.00    1   
Riveted nut plate to hinge angle, and assembled horn attach angle for stabilator
 
14     Sep 15, 2021 Rudder Spar Assembly Rudder 3 $0.00    2   
final drilled spar caps and rudder horn for rudder spar assembly
 
13     Sep 15, 2021 Drill bit holder — drilling holes for bits DrillBitHold 3 $0.00    3   
Using a mill to drill holes for drill bits
 
12     Sep 15, 2021 Attaching Wig Skins (left wing) Wings 3 $0.00    2   
Installing rivets to attach wing skins to left wing.
 
11     Sep 15, 2021 Riveting Anti-Servo Tab ribs AntiServoTab 3 $0.00    1   
Final drilled the four ribs on the anti-servo tab skin, and riveted the top flange of the four ribs.
 
10     Sep 15, 2021 Fluting tailcone ribs Tailcone 3 $0.00    1   
Fluting the tailcone ribs so that the parts lay flat when riveting
 
9     Sep 15, 2021 Assembling Spar Cap for Vertical Stabilizer V Stabilizer 3 $0.00    3   
First, drilling holes in spar. Then, using these holes, riveting spar caps to the spar for the rudder
 
8     Sep 08, 2021 Bit Holder DrillBitHold $0.00    0   
Constructing the drill bit holder for all the drill bits we will using
 
7     Sep 08, 2021 Hinge Angle Preparation Stabilator 2.5 $0.00    1   
Countersunk #40 holes in the HS-01231A, separated the hinge angles and rivetted the two hinge bracket assemblies
 
6     Sep 08, 2021 Preparing AST Skin AntiServoTab 2.5 $0.00    1   
Removing material from the HS-1221 AST Skins and Cleco-ing the ribs and spar
 
5     Sep 08, 2021 Hinge Bracket and Spar Cap Preparation V Stabilizer 2.5 $0.00    2   
Preparing the hinge bracket and spar cap. Looking for missing parts: AEX Wedge, COM 3-5 Bearing
 
4     Sep 08, 2021 Final Drilling and Deburring and Match Drilling Rudder 2.5 $0.00    1   
Final drilling and deburring parts R-1204 and R-1205
Match drilling part R-1202
 
3     Sep 08, 2021 Left Wing Riveting and flaperons Wings 2.5 $0.00    3   
Popping Rivets on the wing.
Put rod-end bearings on the flaperon A-1206 Pivot Brackets and let the thin film of Loctile 243 cure it for 24 hours
 
2     Sep 08, 2021 Breaking edges of the top and bottom skins of the tailbone Tailcone 2.5 $0.00    2   
Breaking edges of tailcone skin (F-1278, F-1280-L&R, F-1281-L&R, F-01282L) using the breaker. Broke them in the direction of the J-stiffener. F-1278 increase the break towards the back. Skipped the deburring because it wasn't effective
 
1     Sep 01, 2021 First Build Day: Riveting the Wings Wings 1 $0.00    4   
7-12 students spent 1 hour inserting pop rivets into the wings (number of builders varied over the hour). For most builders, it was their first time working on the plane or riveting.
  ------------ -------------- ------------- Totals235.5    $0.00    179   