Project: Utah-Jay     -     Project Summary     - Optional PDF document function     - Multi-sectional PDF
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours     Cost # Pictures
285     Apr 07, 2024 Moving right along Wings 50 $0.00    17   
284     Feb 21, 2024 Wingtip trailing edge closeout Wings 2 $0.00    2   
283     Feb 20, 2024 Wingtip pin hole filling and sanding Wings 6 $0.00    0   
282     Feb 08, 2024 Wing Tip Light Base Lighting 2 $0.00    1   
281     Feb 08, 2024 Right wing tip fitted Wings 4 $0.00    4   
280     Feb 06, 2024 Fuel Tank fittings Wings 2 $0.00    2   
279     Feb 06, 2024 Main Skin Riveted Wings 4.5 $0.00    2   
278     Feb 04, 2024 Right Wing Photo Dump Wings 100 $0.00    37   
277     Nov 03, 2023 PAINT! Boot Cowl 5.5 $0.00    6   
276     Nov 02, 2023 Paint Prep Boot Cowl 6.5 $0.00    0   
275     Oct 31, 2023 General pre-paint prep Boot Cowl 6 $0.00    0   
274     Oct 30, 2023 Nose bowl is all primed Engine Cowl 1.5 $0.00    0   
273     Oct 30, 2023 Fixed a faulty Carb Heat sensor reading Avionics 2 $0.00    0   
272     Oct 30, 2023 Boot cowl removal for painting Boot Cowl 3 $0.00    1   
271     Oct 29, 2023 Fill, sand, prime and repeat Engine Cowl 5 $0.00    3   
270     Oct 29, 2023 Upsized holes for #6, #8 screws and #4 Rivets Engine Cowl 4 $0.00    4   
269     Oct 28, 2023 More nose Bowl sanding Engine Cowl 5 $0.00    3   
268     Oct 27, 2023 Installation of Sky Bolt fasteners Engine Cowl 2 $0.00    6   
267     Oct 26, 2023 Baffle Seal Baffling 6 $0.00    5   
266     Sep 03, 2023 Drilled the TW Spring for mounting Empennage 1 $0.00    3   
265     Sep 03, 2023 95% done with pre-engine start cooling Baffling 5 $0.00    7   
264     Sep 01, 2023 Silicone sheets installed Baffling 6 $0.00    6   
263     Aug 31, 2023 Co-Pilot Scat Tube protection Cabin Air 2.5 $0.00    2   
262     Aug 31, 2023 Rear seal installation Baffling 4 $0.00    1   
261     Aug 30, 2023 Clamped wires Engine .5 $0.00    2   
260     Aug 30, 2023 Silicone to baffling Baffling 5 $0.00    3   
259     Aug 28, 2023 Final baffle day, except for the silicone Baffling 8 $0.00    7   
258     Aug 27, 2023 Air Ducts plumbed Baffling 6.5 $0.00    3   
257     Aug 26, 2023 Left Front Ramp Baffling 2.5 $0.00    1   
256     Aug 25, 2023 Cabin heat, oil cooler, plug lines run Baffling 6 $0.00    8   
255     Aug 23, 2023 Trimmed sides and bracketed front intake area Baffling 8 $0.00    6   
254     Aug 22, 2023 Front Ramp baffling area Baffling 4.5 $0.00    4   
253     Aug 11, 2023 Baffling Baffling 6 $0.00    5   
252     Aug 05, 2023 Baffling Engine 4 $0.00    10   
251     Aug 05, 2023 Brakes Landing Gear .5 $0.00    2   
250     Aug 05, 2023 Control Cables Engine 1.5 $0.00    1   
249     Aug 05, 2023 Control Engine $0.00    0   
248     Aug 04, 2023 Odds and Ends Engine 5 $0.00    3   
247     Aug 03, 2023 Nose Bowl Sanding is finished Engine Cowl 6 $0.00    1   
246     Aug 02, 2023 More Nose Bowl sanding Engine Cowl 9 $0.00    0   
245     Aug 01, 2023 Changed tires Landing Gear 2 $0.00    1   
244     Aug 01, 2023 Sanding Nose Bowl Engine Cowl 5.5 $0.00    1   
243     Jul 31, 2023 Sanding the Nose Bowl Engine Cowl 6 $0.00    3   
242     Jul 31, 2023 Air Box Fiberglass Engine Cowl 1.5 $0.00    1   
241     Jun 26, 2023 Finished the Low Pressure lip and.. Engine Cowl 7 $0.00    3   
240     Jun 25, 2023 Air Scoop Frame Engine Cowl 1.5 $0.00    0   
239     Jun 25, 2023 Low Pressure Lip 2 Engine Cowl 2 $0.00    3   
238     Jun 24, 2023 Prepped and primmed lower door skins Doors 2 $0.00    4   
237     Jun 24, 2023 Lower Air Scoop cover Engine Cowl 1 $0.00    0   
236     Jun 24, 2023 Lower Lip Continued Engine Cowl 3 $0.00    0   
235     Jun 23, 2023 Final Installed Wing Root Panels Interior Finish 4.5 $0.00    2   
234     Jun 23, 2023 Drilled and cleco'ed NACA Ducts Boot Cowl 2 $0.00    2   
233     Jun 23, 2023 Sanding low Pressure lip Engine Cowl 1.5 $0.00    4   
232     Jun 22, 2023 Air scoop frame Engine Cowl 3 $0.00    3   
231     Jun 22, 2023 Low Pressure Lip Engine Cowl 2 $0.00    5   
230     Jun 21, 2023 Low Pressure Lip fabrication Engine Cowl 8 $0.00    11   
229     Jun 18, 2023 SkyBolt installation Engine Cowl 3 $0.00    5   
228     Jun 18, 2023 Sight Gauges Fuel System 2.5 $0.00    1   
227     Jun 15, 2023 Riveting the piano hinges to the top cowl Engine Cowl 3 $0.00    5   
226     Jun 13, 2023 Air Scoop re-engineering Engine Cowl 2.5 $0.00    10   
225     May 12, 2023 Trimmed and installed carb airscoop Engine Cowl 3.5 $0.00    3   
224     May 12, 2023 Installed Balance Tubes in Ailerons Wings 1.5 $0.00    2   
223     May 11, 2023 Aileron Balance tubes Wings 5 $0.00    4   
222     May 11, 2023 Bottom Cowl cut out for exhaust Engine Cowl 2 $0.00    3   
221     May 11, 2023 AirBox Engine Cowl 9 $0.00    10   
220     Apr 12, 2023 Finished the bottom cowl, and completed the cowl doors Engine Cowl 7 $0.00    11   
219     Apr 12, 2023 From sheet metal to bottom cowl Engine Cowl 8 $0.00    8   
218     Apr 04, 2023 Finished the top cowl with the piano hinges installed Engine Cowl 6.5 $0.00    9   
217     Apr 03, 2023 Top Section cut and cleco'ed to the nose bowl Engine Cowl 5 $0.00    8   
216     Apr 03, 2023 Redoing part of the boot cowl Boot Cowl 4 $0.00    6   
215     Mar 31, 2023 Tool tray Tools .5 $0.00    1   
214     Mar 31, 2023 Finished the nose bowl backing Engine Cowl 7 $0.00    8   
213     Mar 31, 2023 Upper Nose Bowl Engine Cowl 1 $0.00    1   
212     Mar 31, 2023 Removable Center Section of Glare Shield Boot Cowl 10 $0.00    3   
211     Mar 31, 2023 Removable Boot Cowl $0.00    0   
210     Mar 27, 2023 Removable Top Section Boot Cowl 1.5 $0.00    1   
209     Mar 27, 2023 Naca Duct Boot Cowl 2.5 $0.00    2   
208     Mar 26, 2023 3rd time was the charm Boot Cowl 5.5 $0.00    4   
207     Mar 23, 2023 Boot Cowl avionics access Boot Cowl 3 $0.00    0   
206     Mar 22, 2023 Cotter Pins and Safety Wiring Landing Gear 1.5 $0.00    6   
205     Mar 22, 2023 ELT Gremlin fixed Avionics 3 $0.00    2   
204     Mar 21, 2023 Nose Bowl Engine 1 $0.00    0   
203     Mar 21, 2023 Flying Wires Tail Feathers 2 $0.00    4   
202     Mar 20, 2023 Nose Bowl Engine 3 $0.00    0   
201     Mar 20, 2023 Cotter Pins Tail Feathers 2 $0.00    0   
200     Mar 19, 2023 General Stuff Controls 7 $0.00    7   
199     Mar 16, 2023 Breather system completed Engine 1 $0.00    0   
198     Mar 16, 2023 Radio PTT Avionics 2 $0.00    0   
197     Mar 08, 2023 Remote Oil Filter, Oil Hoses, Breather tube Engine 5 $0.00    9   
196     Mar 07, 2023 Fired Up the Panel Avionics 13 $0.00    2   
195     Mar 01, 2023 Sanded nose bowl Engine 3 $0.00    1   
194     Feb 28, 2023 Nosebowl Engine 2 $0.00    4   
193     Feb 28, 2023 Cable Control Bracket Engine 3 $0.00    1   
192     Feb 27, 2023 Installed engine pre-heater Engine .5 $0.00    1   
191     Feb 26, 2023 Oil Sump Plug Removal Engine .5 $0.00    1   
190     Feb 26, 2023 Data plate installation Fuselage 1 $0.00    1   
189     Feb 26, 2023 Clean up and protect aft wiring Avionics 2.5 $0.00    2   
188     Feb 25, 2023 Added Alternator Shunt and changed Fuse Location Avionics 2.5 $0.00    2   
187     Feb 23, 2023 Ignition Key Power Avionics .5 $0.00    1   
186     Feb 23, 2023 Alternate USB Plugs Avionics 1 $0.00    0   
185     Feb 23, 2023 Alternator / Voltage Regulator Avionics 3 $0.00    3   
184     Feb 23, 2023 Torqued Engine Mount Engine 1 $0.00    1   
183     Feb 22, 2023 Wire Routing/Planning Avionics 4 $0.00    6   
182     Feb 21, 2023 Left Wing wiring. Lighting 4 $0.00    5   
181     Feb 20, 2023 Right wing/Fuselage end wiring Lighting 6 $0.00    9   
180     Feb 16, 2023 Electrical Cables Avionics 1.5 $0.00    0   
179     Feb 15, 2023 Control cable installation and passthrough Controls 8.5 $0.00    8   
178     Feb 06, 2023 Magnetos Engine 3 $0.00    0   
177     Feb 06, 2023 Sky Light Fuselage 2 $0.00    0   
176     Feb 06, 2023 Ground Bus Avionics 2 $0.00    0   
175     Feb 04, 2023 Wiring and EMS Progress Engine 5 $0.00    11   
174     Feb 02, 2023 Installed Solenoids Engine 1 $0.00    2   
173     Feb 02, 2023 Control Cable Bracket Engine 3 $0.00    5   
172     Feb 01, 2023 Oil cooler fittings Engine 2.5 $0.00    0   
171     Jan 15, 2023 Installed screws on the right center and skylight overhead Fuselage 3 $0.00    3   
170     Jan 13, 2023 Wiring Day, hooking up network harnesses and building D-Subs Avionics 5 $0.00    10   
169     Jan 12, 2023 Metal Center Overhead IN Placde Fuselage 2.5 $0.00    8   
168     Jan 11, 2023 Terminated coaxial cable end Avionics 1 $0.00    0   
167     Jan 11, 2023 Installed Skylights Fuselage 4 $0.00    3   
166     Jan 11, 2023 Painted the overhead middle section and inspection covers Paint / Decals 2 $0.00    3   
165     Jan 08, 2023 Alternator Installation Engine 3 $0.00    2   
164     Jan 07, 2023 Measuring for cables Engine .5 $0.00    1   
163     Jan 07, 2023 Throttle/Mixture bracket Engine 2 $0.00    5   
162     Jan 05, 2023 Reinforcement patch on handle area Fuselage 2 $0.00    2   
161     Jan 05, 2023 Battery Box and Cabin Heat Firewall 3.5 $0.00    3   
160     Jan 04, 2023 Holes in Firewall Firewall 4 $0.00    5   
159     Jan 03, 2023 Door Windows and Skins Fuselage 5 $0.00    1   
158     Dec 31, 2022 Upsizing window frame and glass holes Fuselage 2.5 $0.00    1   
157     Dec 30, 2022 Window Framing Fuselage 6 $0.00    4   
156     Dec 28, 2022 Door window frames Fuselage 3 $0.00    6   
155     Dec 28, 2022 Finished AP Servo Harness Avionics 3 $0.00    6   
154     Dec 27, 2022 Installed Connectors for the Control Sticks Avionics 2.5 $0.00    4   
153     Dec 27, 2022 Trim Actuator covers Tail Feathers 2 $0.00    5   
152     Dec 26, 2022 PPT and AP Harness Avionics 3.5 $0.00    6   
151     Dec 24, 2022 Engine Monitors and CHT's Avionics 5.0 $0.00    5   
150     Dec 23, 2022 More Wiring Avionics 2.5 $0.00    3   
149     Dec 21, 2022 Wiring Avionics 4 $0.00    9   
148     Dec 16, 2022 Final mounting of the Oil Cooler Engine 2.5 $0.00    3   
147     Dec 15, 2022 Wire routing Avionics 2 $0.00    2   
146     Dec 15, 2022 Oil Filter Engine 3 $0.00    4   
145     Dec 13, 2022 Nutplates and trays Avionics 5 $0.00    4   
144     Dec 11, 2022 Avionics Trays Avionics 3 $0.00    4   
143     Dec 11, 2022 Windows Fuselage 7 $0.00    2   
142     Dec 08, 2022 Hanging the engine Engine 5 $0.00    5   
141     Dec 07, 2022 Trimmed Avionics Tray Avionics 1 $0.00    1   
140     Dec 07, 2022 Cover Plates Controls 3 $0.00    3   
139     Dec 06, 2022 Wire conduit and Running wires Avionics 2.5 $0.00    6   
138     Dec 06, 2022 Avionics Box Trays Avionics 1.5 $0.00    4   
137     Dec 05, 2022 NACA Cuts Boot Cowl 2 $0.00    1   
136     Dec 04, 2022 Exhaust Suspension Engine 2 $0.00    1   
135     Dec 02, 2022 Mounted the Prop Propeller 1.5 $0.00    2   
134     Dec 02, 2022 Mounting the Exhaust Engine 3 $0.00    4   
133     Dec 02, 2022 Hung the engine Engine 1.5 $0.00    6   
132     Dec 01, 2022 Inspection covers Fuselage 1.5 $0.00    2   
131     Nov 12, 2022 Prep for primer Boot Cowl 4 $0.00    1   
130     Nov 11, 2022 Installed the Panel Avionics 2 $0.00    6   
129     Nov 11, 2022 Installed eats and finalized Seatbelts Interior Finish 2.5 $0.00    3   
128     Nov 10, 2022 Firewall and Engine Mount reinstall action Engine 3 $0.00    3   
127     Nov 10, 2022 Prepped, Primed and reinstalled the boot cowl Boot Cowl 6.5 $0.00    3   
126     Nov 09, 2022 Back on the Gear Landing Gear 6 $0.00    3   
125     Nov 06, 2022 Seat Belt attach points Fuselage 1 $0.00    2   
124     Nov 06, 2022 Seat Belt attach points Fuselage 1 $0.00    2   
123     Nov 06, 2022 Covering is done Fuselage 9 $0.00    9   
122     Nov 03, 2022 Left and Right side covering finished Fuselage 6.5 $0.00    7   
121     Nov 02, 2022 Left side finished Fuselage 6 $0.00    3   
120     Oct 31, 2022 Covering the Vertical Stabilizer Fuselage 7 $0.00    6   
119     Oct 27, 2022 Prepped for Left Side Covering Fuselage 3 $0.00    7   
118     Oct 21, 2022 Right side Fabric Fuselage 6 $0.00    6   
117     Oct 20, 2022 Cut both right and left fabric and attached left Fuselage 8 $0.00    3   
116     Oct 19, 2022 Prep for covering Fuselage 4.5 $0.00    4   
115     Oct 18, 2022 Inspection Covers Fuselage 1 $0.00    3   
114     Oct 18, 2022 Bottom Covering Complete Fuselage 15 $0.00    4   
113     Oct 17, 2022 Prepped for Covering Fuselage 2 $0.00    2   
112     Oct 17, 2022 Gear Covered Landing Gear 18 $0.00    10   
111     Aug 23, 2022 Right side Cargo enclosure Fuselage 3 $0.00    7   
110     Aug 15, 2022 Left side cargo covering Fuselage 4 $0.00    5   
109     Aug 12, 2022 Fitting of the skylights Fuselage 2.5 $0.00    7   
108     Aug 11, 2022 Finished covering Tail Feathers Tail Feathers 50 $0.00    17   
107     Aug 11, 2022 Cargo wall window covering Paint / Decals 1 $0.00    4   
106     Jun 19, 2022 Trim Tabs, Elevators and Horizontals covered Paint / Decals 25 $0.00    9   
105     Jun 16, 2022 Horizontal Stab Covering Paint / Decals 8 $0.00    19   
104     Jun 16, 2022 Horizontal Stab Covering Paint / Decals 8 $0.00    18   
103     Jun 09, 2022 Covering Elevators and Trim Tabs Paint / Decals 31.5 $0.00    13   
102     Jun 07, 2022 Covering tailfeathers Paint / Decals 14 $0.00    1   
101     Jun 06, 2022 Covering issues Paint / Decals 18 $0.00    3   
100     May 20, 2022 Inspection holes/plates Empennage 8 $0.00    13   
99     May 17, 2022 Drilled and set the clamps to hold the brake lines Landing Gear .5 $0.00    1   
98     May 17, 2022 Finished Wing Root Panels Interior Finish 4 $0.00    8   
97     May 12, 2022 Installed seat bottom cushions Interior Finish 1.5 $0.00    2   
96     May 12, 2022 Wing Root Panel Fuselage 4 $0.00    6   
95     Apr 06, 2022 Wire retention and wires Avionics 2 $0.00    3   
94     Apr 06, 2022 Floor boards and cargo area Fuselage 2 $0.00    1   
93     Apr 05, 2022 Middle section of the roof/sky light Fuselage 3 $0.00    5   
92     Apr 05, 2022 Floor Boards Interior Finish 2 $0.00    3   
91     Apr 04, 2022 Center roof section Fuselage 3 $0.00    3   
90     Apr 04, 2022 ADAHARS Tray Avionics 3 $0.00    1   
89     Apr 01, 2022 Brake lines Landing Gear 2 $0.00    3   
88     Apr 01, 2022 Securing Lines Fuel System 2 $0.00    6   
87     Mar 28, 2022 Brake Line mock up Controls 2.0 $0.00    1   
86     Mar 28, 2022 Flap Cable Rub Block Fuselage .5 $0.00    2   
85     Mar 24, 2022 Right seat bottom webbing installed Fuselage 3 $0.00    4   
84     Mar 23, 2022 Right Rear Window Fuselage 2.5 $0.00    3   
83     Mar 23, 2022 Seat Back webbing Interior Finish 2 $0.00    4   
82     Mar 22, 2022 Rear Windows Fuselage 1 $0.00    2   
81     Mar 22, 2022 Secured fuel lines Fuel System 1 $0.00    0   
80     Mar 22, 2022 Completed Cargo extension/box Fuselage 3 $0.00    3   
79     Mar 22, 2022 Antenna trays Avionics 4 $0.00    2   
78     Mar 09, 2022 GPS and Comm antenna shield Avionics 6.5 $0.00    9   
77     Feb 20, 2022 Cargo Closeout and Baggage Door Fuselage 15 $0.00    7   
76     Feb 20, 2022 Static Port tubing Avionics .5 $0.00    0   
75     Feb 16, 2022 Static Port location finalized Avionics .5 $0.00    3   
74     Feb 16, 2022 Back wall of cargo area Interior Finish 6 $0.00    6   
73     Feb 12, 2022 Rear Windows Fuselage 3 $0.00    3   
72     Feb 12, 2022 Re-did the left side boot cowl Fuselage 2 $0.00    2   
71     Feb 12, 2022 Installed the Static Ports Avionics 1.5 $0.00    2   
70     Feb 12, 2022 Fabricated plates for covering Tail Feathers 4 $0.00    7   
69     Feb 06, 2022 Right Lower Door Window Fuselage 2 $0.00    3   
68     Feb 05, 2022 Rudder Pedal Spring Fuselage .5 $0.00    1   
67     Feb 05, 2022 Left Lower Door Fuselage 3 $0.00    1   
66     Feb 03, 2022 Rudder Cables Fuselage 2 $0.00    3   
65     Jan 13, 2022 Upper and Lower Door Fuselage 7 $0.00    13   
64     Jan 11, 2022 Upper Side Stringer Fuselage 1 $0.00    0   
63     Jan 11, 2022 Skylight Fuselage 1.5 $0.00    2   
62     Jan 08, 2022 Golf Club cargo tube Fuselage 3.5 $0.00    2   
61     Jan 08, 2022 Mouse Trap doors Fuselage 5 $0.00    6   
60     Jan 05, 2022 Upper Doors Fuselage 7.5 $0.00    11   
59     Jan 05, 2022 Upper D Fuselage $0.00    0   
58     Jan 03, 2022 Upper Door Window Frame Fuselage 3 $0.00    5   
57     Dec 28, 2021 Lower doors Fuselage 3 $0.00    9   
56     Dec 24, 2021 Lower door Fuselage 9.0 $0.00    17   
55     Dec 22, 2021 Lower Door top fitting Fuselage .5 $0.00    2   
54     Dec 22, 2021 Lower Door Windows Fuselage 6.5 $0.00    5   
53     Dec 16, 2021 Rear Window frames Fuselage .5 $0.00    1   
52     Dec 16, 2021 Door Skin Fuselage 3.5 $0.00    5   
51     Dec 16, 2021 Mounted the landing gear, wheels and tires Landing Gear 2 $0.00    4   
50     Dec 15, 2021 Measured Elevator for Deflection Controls .5 $0.00    0   
49     Dec 15, 2021 Final assembly of control sticks Controls 1.5 $0.00    4   
48     Dec 15, 2021 Cut Stick Down and Installed Grips Controls 2 $0.00    1   
47     Dec 15, 2021 Hung Doors and Windows Fuselage 1.5 $0.00    2   
46     Dec 14, 2021 Sky Light and Window Former Painting Fuselage 2.5 $0.00    1   
45     Dec 14, 2021 Stringers Fuselage 1.5 $0.00    1   
44     Dec 14, 2021 Flap Rigging to the 1-2 plate Controls 1 $0.00    2   
43     Dec 13, 2021 Rigging the Elevator Controls 3 $0.00    4   
42     Dec 13, 2021 Trim Rigging Controls 3 $0.00    3   
41     Dec 12, 2021 Ski/Golf Club compartment Fuselage 1 $0.00    3   
40     Dec 12, 2021 Axle Landing Gear 1.5 $0.00    0   
39     Dec 10, 2021 Wheels and Tires Landing Gear 2 $0.00    2   
38     Dec 10, 2021 Brake Torque Plates Landing Gear 1.5 $0.00    2   
37     Dec 09, 2021 Torque Plate Installation Landing Gear 2.5 $0.00    0   
36     Dec 08, 2021 Bottom Cowl extension re-do Boot Cowl .5 $0.00    0   
35     Dec 08, 2021 Tires Landing Gear .5 $0.00    0   
34     Dec 03, 2021 Trim Tabs Tail Feathers 4 $0.00    6   
33     Dec 02, 2021 Counter Sinking holes Instrument Panel 1 $0.00    2   
32     Dec 02, 2021 8 days of Boot Cowl Work Boot Cowl 55 $0.00    41   
31     Dec 02, 2021 Panel Attach fabricated Instrument Panel 3 $0.00    5   
30     Dec 02, 2021 Insulation and sound proofing Firewall 8 $0.00    7   
29     Dec 02, 2021 Drilling and fitting to Fuselage Firewall $0.00    0   
28     Dec 02, 2021 Installed the Landing Gear Landing Gear 6 $0.00    7   
27     Dec 02, 2021 ELT Mount Avionics 3 $0.00    1   
26     Dec 02, 2021 Sky Light and windshield attach area Fuselage $0.00    1   
25     Dec 02, 2021 Floorboards Interior Finish 9 $0.00    8   
24     Dec 02, 2021 Mock Cable lines Controls 3 $0.00    6   
23     Dec 02, 2021 Fuel lines finished and leak tested Fuel System 6 $0.00    23   
22     Dec 02, 2021 Fuel Lines Fuel System 7 $0.00    8   
21     Dec 02, 2021 Rudder installation Tail Feathers 3 $0.00    0   
20     Dec 02, 2021 Rudder Pedal Installation Controls 3 $0.00    1   
19     Dec 02, 2021 Right rear line Fuel System 4 $0.00    5   
18     Dec 02, 2021 Tube for Rudder Cables Controls 1 $0.00    1   
17     Dec 02, 2021 Correcting mistakes Fuel System 4 $0.00    4   
16     Dec 02, 2021 Fuel Selector and Gascolator Fuel System 5 $0.00    0   
15     Dec 02, 2021 Door Formers Fuselage 5 $0.00    5   
14     Dec 02, 2021 Bottom Stringers Fuselage 4 $0.00    2   
13     Dec 02, 2021 Trim system Controls 8 $0.00    6   
12     Dec 02, 2021 Trim Wheel Controls 1 $0.00    0   
11     Dec 02, 2021 Stringers Pt. 1 Fuselage 4 $0.00    3   
10     Dec 02, 2021 Setting the Angle of the Horizontal Tail Feathers 7 $0.00    4   
9     Dec 02, 2021 Leveling the fuselage Tail Feathers 2 $0.00    4   
8     Dec 02, 2021 Control Stick assembly and installation Controls 4 $0.00    2   
7     Dec 02, 2021 Flap Controls Controls 4 $0.00    2   
6     Dec 02, 2021 Seat Adjustment mechanism Fuselage 5 $0.00    3   
5     Dec 02, 2021 Window Fuselage 3 $0.00    1   
4     Dec 02, 2021 Strut Assembly Landing Gear 2 $0.00    1   
3     Dec 02, 2021 Built workbench and arranged drill and grinding wheel Workshop 2 $0.00    1   
2     Dec 02, 2021 Delivery Fuselage 5 $0.00    2   
1     Dec 02, 2021 TailWheel Landing Gear 1 $0.00    1   
------------ -------------- -------------
Totals1317.5    $0.00    1142   





NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.