Summary
Hours
Entries
Expenses
Dtl. Expenses
Flight Time
Viewers
Categories
Project:
LincolnSport
- Project Summary
- Optional PDF document function
Add entry descriptions
Project PDF with:
Title Only
Title & Description
All
All w/ Picture Title
-
Last Entry First
First Entry First
Create PDF
Entry #
Created
Title
Category
Hours
Cost
# Pictures
110
Jun 25, 2023
New engine prep
Engine
12
$0.00
9
109
Nov 21, 2019
Glued cowl mounting blocks on
FWF
6.00
$0.00
3
108
Nov 17, 2019
fabricated rear firewall
Research
4.00
$0.00
3
107
Nov 16, 2019
cut SS 0.018 cover for engine backer
FWF
5.00
$0.00
3
106
Nov 14, 2019
Fabricated front firewall
FWF
6.00
$0.00
3
105
Aug 14, 2019
fabricated tabs to weld to fuse
FWF
8.00
$0.00
3
104
Aug 13, 2019
Fuel Tank Fabricatio
FWF
6.00
$0.00
3
103
Mar 27, 2019
made fuel tank add on for extra capacity
FWF
5.00
$0.00
3
102
Mar 26, 2019
cut hole for filler and mocked up add on
FWF
4.00
$0.00
2
101
Mar 23, 2019
rewelding of engine mounting ring do to mistake
FWF
5.00
$0.00
3
100
Mar 15, 2019
fabrication of fire and instrument bulk heads
Fuselage
5.00
$0.00
3
99
Feb 25, 2019
base and top of fuel tank
FWF
4.00
$0.00
3
98
Feb 19, 2019
welded the brake transition to the bungee piece
Landing Gear
2.00
$0.00
2
97
Feb 19, 2019
welded up the motor mount
FWF
2.00
$0.00
2
96
Feb 18, 2019
instrument panel and fuel tank
Cockpit
2.00
$0.00
2
95
Feb 18, 2019
tail brace wire terminations
Rigging
3.00
$0.00
2
94
Feb 17, 2019
finished landing/flying wires/cables
Rigging
3.00
$0.00
3
93
Feb 17, 2019
instrument panel
Cockpit
3.00
$0.00
3
92
Feb 16, 2019
finished fabricating flying/landing cables
Rigging
6.00
$0.00
3
91
Feb 15, 2019
finished instrument panel and started onlanding/fl
Rigging
5.00
$0.00
3
90
Feb 14, 2019
building up instrument and bulkhead
Cockpit
4.00
$0.00
3
89
Feb 12, 2019
drew out instrument panel front bulhead
Cockpit
2.00
$0.00
1
88
Feb 09, 2019
fabricated tabs for stabiliser wires
Rigging
4.00
$0.00
3
87
Feb 04, 2019
built a jig for the engine mount
FWF
5.00
$0.00
3
86
Feb 03, 2019
got motor mount ready for mockup
FWF
4.00
$0.00
2
85
Feb 02, 2019
started the main fabrication of motor mount
FWF
6.00
$0.00
3
84
Feb 01, 2019
prepping for fabrication of motor mount
FWF
4.00
$0.00
3
83
Dec 26, 2018
mock up of fuel tank
Fuselage
3.00
$0.00
3
82
Dec 05, 2018
assembled engine stand and engine
Engine
3.00
$0.00
2
81
Dec 04, 2018
Fabricated axle guides and engine stand
Landing Gear
4.00
$0.00
3
80
Dec 03, 2018
axle collars and engine stand
Miscellaneous
6.00
$0.00
3
79
Dec 01, 2018
instrument and forward bulkhead
Fuselage
3.00
$0.00
3
78
Nov 28, 2018
finalized brake
Landing Gear
4.00
$0.00
2
77
Nov 27, 2018
suspension finaization
Landing Gear
5.00
$0.00
3
76
Nov 21, 2018
Install upper wing and check incidence.
Rigging
3.00
$0.00
3
75
Nov 20, 2018
starting reassembly to check wing rigging
Rigging
3.00
$0.00
3
74
Nov 07, 2018
fixing stringer spacers
Fuselage
2.00
$0.00
2
73
Nov 06, 2018
Modify floorbds and modify attach point
Wings
4.00
$0.00
3
72
Nov 05, 2018
Completely disassemble to fix rear wing attach
Miscellaneous
6.00
$0.00
2
71
Feb 19, 2018
level and rigging basics
Rigging
5.00
$0.00
3
70
Feb 16, 2018
fabrication of n-struts
Wings
5.00
$0.00
3
69
Feb 13, 2018
brake cable fitting mockup
Landing Gear
5.00
$0.00
3
68
Feb 12, 2018
wing struts
Wings
5.00
$0.00
3
67
Feb 07, 2018
wing cabane mock-up
Miscellaneous
3.00
$0.00
3
66
Feb 06, 2018
reassemble gear and wings
General
5.00
$0.00
3
65
Feb 05, 2018
installation of wing and gear
Miscellaneous
5.00
$0.00
3
64
Feb 04, 2018
cockpit control cables
Flight Controls
3.00
$0.00
2
63
Feb 03, 2018
installed rudder pedals
Cockpit
3.00
$0.00
2
62
Feb 02, 2018
cut and install floor boards
Cockpit
5.00
$0.00
3
61
Feb 01, 2018
continued on with flight controls
Flight Controls
5.00
$0.00
3
60
Jan 31, 2018
putting back together
Flight Controls
5.00
$0.00
3
59
Jan 30, 2018
finish installing stringers/formers
Fuselage
6.00
$0.00
3
58
Jan 29, 2018
final fitting of bottom former/stringer
Fuselage
6.00
$0.00
3
57
Jan 28, 2018
finished weldingof fuselage add-ons
Fuselage
6.00
$0.00
0
56
Jan 25, 2018
remove controls and start floor boards
Cockpit
5.00
$0.00
3
55
Jan 19, 2018
redo brake pedals
Landing Gear
3.00
$0.00
2
54
Jan 18, 2018
toe brakes again
Landing Gear
5.00
$0.00
3
53
Jan 17, 2018
toe brake ideas
Landing Gear
5.00
$0.00
2
52
Jan 15, 2018
finished trim tab
Flight Controls
5.00
$0.00
3
51
Jan 13, 2018
trim tab
Flight Controls
2.00
$0.00
1
50
Jan 10, 2018
welded axle uprights in place
Landing Gear
3.00
$0.00
2
49
Jan 09, 2018
tail brace wire brackets
Miscellaneous
3.00
$0.00
2
48
Jan 08, 2018
trim cable fairlead
Flight Controls
1.00
$0.00
1
47
Jan 06, 2018
Making sure fuselage is square
Landing Gear
6.00
$0.00
2
46
Jan 04, 2018
trim tab time
Flight Controls
6.00
$0.00
3
45
Jan 03, 2018
right side upright slider
Landing Gear
5.00
$0.00
2
44
Jan 02, 2018
axle sliders on landing gear
Landing Gear
5.00
$0.00
2
43
Jan 01, 2018
anti-torque bungee collars
Landing Gear
4.50
$0.00
3
42
Dec 31, 2017
brake anti-torque fittings
Landing Gear
6.00
$0.00
3
41
Dec 27, 2017
setting up brakes
Landing Gear
4.00
$0.00
3
40
Dec 19, 2017
Modified what I did yesturday
Landing Gear
4.00
$0.00
2
39
Dec 18, 2017
axle anti-twist brackets
Landing Gear
5.00
$0.00
2
38
Dec 16, 2017
whipped cable ends
Flight Controls
3.00
$0.00
1
37
Dec 14, 2017
fabricated fuse rotators
Miscellaneous
4.00
$0.00
2
36
Dec 13, 2017
welded pulley brackets onto fuse
Wings
4.00
$0.00
2
35
Dec 12, 2017
remake of aileron pulley brackets
Wings
5.00
$0.00
3
34
Dec 11, 2017
new bolt order came
Wings
3.00
$0.00
3
33
Dec 10, 2017
ran balancing cable
Wings
6.00
$0.00
3
32
Dec 09, 2017
Balancing cable routing
Wings
6.00
$0.00
3
31
Dec 07, 2017
continuation of aileron cable routing
Wings
6.00
$0.00
3
30
Dec 05, 2017
figuring out the aileron control system
Wings
5.00
$0.00
2
29
Dec 04, 2017
Installed lower wing and other
Wings
5.00
$0.00
3
28
Dec 01, 2017
whipped cable ends
Flight Controls
3.00
$0.00
1
27
Nov 30, 2017
cable antiabrasion and stops
Flight Controls
5.00
$0.00
3
26
Nov 29, 2017
tying it together
Flight Controls
6.00
$0.00
3
25
Nov 28, 2017
installed welded bellcrank
Flight Controls
4.00
$0.00
3
24
Nov 27, 2017
welding elevator transition
Flight Controls
4.00
$0.00
2
23
Nov 21, 2017
fairleads and bellcranks
Flight Controls
4.00
$0.00
3
22
Nov 16, 2017
finalized cable runs
Flight Controls
4.00
$0.00
3
21
Nov 15, 2017
moved 1st stringer station
Fuselage
3.00
$0.00
1
20
Nov 08, 2017
elevator work
Flight Controls
5.00
$0.00
3
19
Nov 06, 2017
elevator and transition
Flight Controls
4.00
$0.00
3
18
Nov 04, 2017
Rudder pedals and elevator transition brackets
Flight Controls
6.00
$0.00
3
17
Nov 03, 2017
continuation of elevator control
Flight Controls
5.00
$0.00
3
16
Nov 02, 2017
Control stick details
Flight Controls
5.00
$0.00
2
15
Nov 01, 2017
Continuation of elevator mockup
Flight Controls
5.00
$0.00
3
14
Oct 31, 2017
fabrication of control stick
Flight Controls
4.00
$0.00
2
13
Oct 28, 2017
Remove lower formers
Fuselage
3.00
$0.00
3
12
Oct 12, 2017
Tail dragger dragger
Miscellaneous
5.00
$0.00
2
11
Oct 12, 2017
tail dragger dragger
Miscellaneous
6.00
$0.00
2
10
Oct 11, 2017
bad fit corrected
Flight Controls
6.00
$0.00
0
9
Oct 10, 2017
refit horizontal stabs
Flight Controls
4.00
$0.00
2
8
Sep 28, 2017
Independant elevators not good
Flight Controls
8.00
$0.00
3
7
Sep 15, 2017
cockpit too small
Cockpit
5.00
$0.00
2
6
Sep 14, 2017
rudder bar
Flight Controls
3.00
$0.00
3
5
Sep 13, 2017
stabilizers fit too tight
Flight Controls
3.00
$0.00
2
4
Aug 23, 2017
fit elevators and rudder
Flight Controls
4.00
$0.00
2
3
Aug 19, 2017
lower stringer fitting
Fuselage
2.00
$0.00
1
2
Aug 18, 2017
Pieces already fabricated
Cockpit
2.00
$0.00
1
1
Aug 16, 2017
Out of storage
General
2.00
$0.00
1
------------
--------------
-------------
Totals
487.5
$0.00
279