Entry #CreatedTitleCategoryHours     Cost # Pictures
110     Jun 25, 2023 New engine prep Engine 12 $0.00    9   
109     Nov 21, 2019 Glued cowl mounting blocks on FWF 6.00 $0.00    3   
108     Nov 17, 2019 fabricated rear firewall Research 4.00 $0.00    3   
107     Nov 16, 2019 cut SS 0.018 cover for engine backer FWF 5.00 $0.00    3   
106     Nov 14, 2019 Fabricated front firewall FWF 6.00 $0.00    3   
105     Aug 14, 2019 fabricated tabs to weld to fuse FWF 8.00 $0.00    3   
104     Aug 13, 2019 Fuel Tank Fabricatio FWF 6.00 $0.00    3   
103     Mar 27, 2019 made fuel tank add on for extra capacity FWF 5.00 $0.00    3   
102     Mar 26, 2019 cut hole for filler and mocked up add on FWF 4.00 $0.00    2   
101     Mar 23, 2019 rewelding of engine mounting ring do to mistake FWF 5.00 $0.00    3   
100     Mar 15, 2019 fabrication of fire and instrument bulk heads Fuselage 5.00 $0.00    3   
99     Feb 25, 2019 base and top of fuel tank FWF 4.00 $0.00    3   
98     Feb 19, 2019 welded the brake transition to the bungee piece Landing Gear 2.00 $0.00    2   
97     Feb 19, 2019 welded up the motor mount FWF 2.00 $0.00    2   
96     Feb 18, 2019 instrument panel and fuel tank Cockpit 2.00 $0.00    2   
95     Feb 18, 2019 tail brace wire terminations Rigging 3.00 $0.00    2   
94     Feb 17, 2019 finished landing/flying wires/cables Rigging 3.00 $0.00    3   
93     Feb 17, 2019 instrument panel Cockpit 3.00 $0.00    3   
92     Feb 16, 2019 finished fabricating flying/landing cables Rigging 6.00 $0.00    3   
91     Feb 15, 2019 finished instrument panel and started onlanding/fl Rigging 5.00 $0.00    3   
90     Feb 14, 2019 building up instrument and bulkhead Cockpit 4.00 $0.00    3   
89     Feb 12, 2019 drew out instrument panel front bulhead Cockpit 2.00 $0.00    1   
88     Feb 09, 2019 fabricated tabs for stabiliser wires Rigging 4.00 $0.00    3   
87     Feb 04, 2019 built a jig for the engine mount FWF 5.00 $0.00    3   
86     Feb 03, 2019 got motor mount ready for mockup FWF 4.00 $0.00    2   
85     Feb 02, 2019 started the main fabrication of motor mount FWF 6.00 $0.00    3   
84     Feb 01, 2019 prepping for fabrication of motor mount FWF 4.00 $0.00    3   
83     Dec 26, 2018 mock up of fuel tank Fuselage 3.00 $0.00    3   
82     Dec 05, 2018 assembled engine stand and engine Engine 3.00 $0.00    2   
81     Dec 04, 2018 Fabricated axle guides and engine stand Landing Gear 4.00 $0.00    3   
80     Dec 03, 2018 axle collars and engine stand Miscellaneous 6.00 $0.00    3   
79     Dec 01, 2018 instrument and forward bulkhead Fuselage 3.00 $0.00    3   
78     Nov 28, 2018 finalized brake Landing Gear 4.00 $0.00    2   
77     Nov 27, 2018 suspension finaization Landing Gear 5.00 $0.00    3   
76     Nov 21, 2018 Install upper wing and check incidence. Rigging 3.00 $0.00    3   
75     Nov 20, 2018 starting reassembly to check wing rigging Rigging 3.00 $0.00    3   
74     Nov 07, 2018 fixing stringer spacers Fuselage 2.00 $0.00    2   
73     Nov 06, 2018 Modify floorbds and modify attach point Wings 4.00 $0.00    3   
72     Nov 05, 2018 Completely disassemble to fix rear wing attach Miscellaneous 6.00 $0.00    2   
71     Feb 19, 2018 level and rigging basics Rigging 5.00 $0.00    3   
70     Feb 16, 2018 fabrication of n-struts Wings 5.00 $0.00    3   
69     Feb 13, 2018 brake cable fitting mockup Landing Gear 5.00 $0.00    3   
68     Feb 12, 2018 wing struts Wings 5.00 $0.00    3   
67     Feb 07, 2018 wing cabane mock-up Miscellaneous 3.00 $0.00    3   
66     Feb 06, 2018 reassemble gear and wings General 5.00 $0.00    3   
65     Feb 05, 2018 installation of wing and gear Miscellaneous 5.00 $0.00    3   
64     Feb 04, 2018 cockpit control cables Flight Controls 3.00 $0.00    2   
63     Feb 03, 2018 installed rudder pedals Cockpit 3.00 $0.00    2   
62     Feb 02, 2018 cut and install floor boards Cockpit 5.00 $0.00    3   
61     Feb 01, 2018 continued on with flight controls Flight Controls 5.00 $0.00    3   
60     Jan 31, 2018 putting back together Flight Controls 5.00 $0.00    3   
59     Jan 30, 2018 finish installing stringers/formers Fuselage 6.00 $0.00    3   
58     Jan 29, 2018 final fitting of bottom former/stringer Fuselage 6.00 $0.00    3   
57     Jan 28, 2018 finished weldingof fuselage add-ons Fuselage 6.00 $0.00    0   
56     Jan 25, 2018 remove controls and start floor boards Cockpit 5.00 $0.00    3   
55     Jan 19, 2018 redo brake pedals Landing Gear 3.00 $0.00    2   
54     Jan 18, 2018 toe brakes again Landing Gear 5.00 $0.00    3   
53     Jan 17, 2018 toe brake ideas Landing Gear 5.00 $0.00    2   
52     Jan 15, 2018 finished trim tab Flight Controls 5.00 $0.00    3   
51     Jan 13, 2018 trim tab Flight Controls 2.00 $0.00    1   
50     Jan 10, 2018 welded axle uprights in place Landing Gear 3.00 $0.00    2   
49     Jan 09, 2018 tail brace wire brackets Miscellaneous 3.00 $0.00    2   
48     Jan 08, 2018 trim cable fairlead Flight Controls 1.00 $0.00    1   
47     Jan 06, 2018 Making sure fuselage is square Landing Gear 6.00 $0.00    2   
46     Jan 04, 2018 trim tab time Flight Controls 6.00 $0.00    3   
45     Jan 03, 2018 right side upright slider Landing Gear 5.00 $0.00    2   
44     Jan 02, 2018 axle sliders on landing gear Landing Gear 5.00 $0.00    2   
43     Jan 01, 2018 anti-torque bungee collars Landing Gear 4.50 $0.00    3   
42     Dec 31, 2017 brake anti-torque fittings Landing Gear 6.00 $0.00    3   
41     Dec 27, 2017 setting up brakes Landing Gear 4.00 $0.00    3   
40     Dec 19, 2017 Modified what I did yesturday Landing Gear 4.00 $0.00    2   
39     Dec 18, 2017 axle anti-twist brackets Landing Gear 5.00 $0.00    2   
38     Dec 16, 2017 whipped cable ends Flight Controls 3.00 $0.00    1   
37     Dec 14, 2017 fabricated fuse rotators Miscellaneous 4.00 $0.00    2   
36     Dec 13, 2017 welded pulley brackets onto fuse Wings 4.00 $0.00    2   
35     Dec 12, 2017 remake of aileron pulley brackets Wings 5.00 $0.00    3   
34     Dec 11, 2017 new bolt order came Wings 3.00 $0.00    3   
33     Dec 10, 2017 ran balancing cable Wings 6.00 $0.00    3   
32     Dec 09, 2017 Balancing cable routing Wings 6.00 $0.00    3   
31     Dec 07, 2017 continuation of aileron cable routing Wings 6.00 $0.00    3   
30     Dec 05, 2017 figuring out the aileron control system Wings 5.00 $0.00    2   
29     Dec 04, 2017 Installed lower wing and other Wings 5.00 $0.00    3   
28     Dec 01, 2017 whipped cable ends Flight Controls 3.00 $0.00    1   
27     Nov 30, 2017 cable antiabrasion and stops Flight Controls 5.00 $0.00    3   
26     Nov 29, 2017 tying it together Flight Controls 6.00 $0.00    3   
25     Nov 28, 2017 installed welded bellcrank Flight Controls 4.00 $0.00    3   
24     Nov 27, 2017 welding elevator transition Flight Controls 4.00 $0.00    2   
23     Nov 21, 2017 fairleads and bellcranks Flight Controls 4.00 $0.00    3   
22     Nov 16, 2017 finalized cable runs Flight Controls 4.00 $0.00    3   
21     Nov 15, 2017 moved 1st stringer station Fuselage 3.00 $0.00    1   
20     Nov 08, 2017 elevator work Flight Controls 5.00 $0.00    3   
19     Nov 06, 2017 elevator and transition Flight Controls 4.00 $0.00    3   
18     Nov 04, 2017 Rudder pedals and elevator transition brackets Flight Controls 6.00 $0.00    3   
17     Nov 03, 2017 continuation of elevator control Flight Controls 5.00 $0.00    3   
16     Nov 02, 2017 Control stick details Flight Controls 5.00 $0.00    2   
15     Nov 01, 2017 Continuation of elevator mockup Flight Controls 5.00 $0.00    3   
14     Oct 31, 2017 fabrication of control stick Flight Controls 4.00 $0.00    2   
13     Oct 28, 2017 Remove lower formers Fuselage 3.00 $0.00    3   
12     Oct 12, 2017 Tail dragger dragger Miscellaneous 5.00 $0.00    2   
11     Oct 12, 2017 tail dragger dragger Miscellaneous 6.00 $0.00    2   
10     Oct 11, 2017 bad fit corrected Flight Controls 6.00 $0.00    0   
9     Oct 10, 2017 refit horizontal stabs Flight Controls 4.00 $0.00    2   
8     Sep 28, 2017 Independant elevators not good Flight Controls 8.00 $0.00    3   
7     Sep 15, 2017 cockpit too small Cockpit 5.00 $0.00    2   
6     Sep 14, 2017 rudder bar Flight Controls 3.00 $0.00    3   
5     Sep 13, 2017 stabilizers fit too tight Flight Controls 3.00 $0.00    2   
4     Aug 23, 2017 fit elevators and rudder Flight Controls 4.00 $0.00    2   
3     Aug 19, 2017 lower stringer fitting Fuselage 2.00 $0.00    1   
2     Aug 18, 2017 Pieces already fabricated Cockpit 2.00 $0.00    1   
1     Aug 16, 2017 Out of storage General 2.00 $0.00    1   
------------ -------------- -------------
Totals487.5    $0.00    279   