Project: Bovine-RV14A     -     Project Summary     - Optional PDF document function     - Multi-sectional PDF
Add entry descriptions           Project PDF with: -

Entry #CreatedTitleCategoryHours # Pictures
237     Mar 10, 2024 Fuselage rotisserie Workshop 1.0 1   
236     Mar 05, 2024 Finishing kit delivery Workshop 3.0 2   
235     Oct 21, 2023 Drilling out the rudder spar Tail Feathers 5.0 4   
234     Sep 26, 2023 Propeller and spinner delivered Propeller 1.0 4   
233     Sep 23, 2023 Cutting elevator foam blocks Tail Feathers 1.5 4   
232     Sep 17, 2023 Starting Elevator prep Tail Feathers 2.5 4   
231     Sep 14, 2023 Laser cut parts inventory Research 2.0 1   
230     Sep 11, 2023 Finishing last rivets of HS Tail Feathers 1.0 3   
229     Sep 10, 2023 Beginning to rivet HS rear spar Tail Feathers 0.5 2   
228     Sep 08, 2023 Riveting lower skin of HS Tail Feathers 3.0 2   
227     Sep 05, 2023 Riveting top skin of HS Tail Feathers 4.5 5   
226     Sep 01, 2023 Offset riveting the HS spar Tail Feathers 2.5 3   
225     Aug 30, 2023 Nose ribs and HS assembly Tail Feathers 2.0 4   
224     Aug 29, 2023 Riveting nose ribs into HS skins Tail Feathers 1.0 1   
223     Aug 28, 2023 Priming the HS skins Tail Feathers 1.0 1   
222     Aug 27, 2023 Riveting the HS ribs and stringers to the spar Tail Feathers 2.5 3   
221     Aug 26, 2023 Counter-sinking HS stringers and priming parts Tail Feathers 2.5 4   
220     Aug 24, 2023 Counter-sinking the HS spars Tail Feathers 2.0 2   
219     Aug 22, 2023 Finish dimpling HS skin Tail Feathers 1.0 1   
218     Aug 21, 2023 Starting dimpling of H-stab skin Tail Feathers 1.5 2   
217     Aug 20, 2023 Dimpling h-stab ribs Tail Feathers 2.0 1   
216     Aug 09, 2023 Deburring H-stab ribs Tail Feathers 1.0 1   
215     Aug 05, 2023 Riveting the H-stab spar Tail Feathers 2.0 3   
214     Aug 04, 2023 Priming H-stab spar Tail Feathers 0.5 1   
213     Aug 03, 2023 Drilling, countersinking, deburring, scuffing H-stab spar Tail Feathers 2.0 2   
212     Aug 02, 2023 Match drilling second spar cap for H-stab finished Tail Feathers 1.5 1   
211     Aug 01, 2023 Match drilling first spar cap for H-stab Tail Feathers 1.5 3   
210     Jul 30, 2023 Cutting spar caps for H-stab Tail Feathers 1.0 1   
209     Jul 29, 2023 Mounting TV in workshop Workshop 2.0 1   
208     Jul 28, 2023 Oshkosh recap Research 1   
207     Jul 15, 2023 H-stab spar Tail Feathers 4.0 8   
206     Jul 13, 2023 Pausing rudder and auditing h-stab Tail Feathers 3.0 2   
205     Jul 06, 2023 Rudder counterweight and top rib Tail Feathers 3.0 8   
204     Jul 04, 2023 Riveting together the rudder Tail Feathers 5.0 6   
203     Jul 03, 2023 Back-riveting the ribs onto the rudder skins Tail Feathers 3.0 6   
202     Jul 02, 2023 Nutplates and dimpling the rudder Tail Feathers 3.0 4   
201     Jun 26, 2023 Starting to assemble rudder ribs Tail Feathers 2.5 1   
200     Jun 24, 2023 Priming rudder parts Tail Feathers 2.0 1   
199     Jun 24, 2023 Moving the wings to the hangar Wings 3.0 5   
198     Jun 22, 2023 Autopilot pushrods and servo wiring Controls 2.5 5   
197     Jun 22, 2023 Skinwork and Drilling the rudder counterweight Tail Feathers 0.5 1   
196     Jun 21, 2023 Prepping internal rudder parts Tail Feathers 2.5 1   
195     Jun 19, 2023 Starting on the rudder Tail Feathers 1.5 2   
194     Jun 18, 2023 Skinning the vertical stablizer Tail Feathers 3.5 7   
193     Jun 16, 2023 Riveting together VS spars and ribs Tail Feathers 2.0 4   
192     Jun 14, 2023 Vertical stab scuffing and priming Tail Feathers 2.5 5   
191     Jun 13, 2023 Vertical stab match drilling, deburring, and scuffing Tail Feathers 2.0 3   
190     Jun 12, 2023 Starting work on vertical stabilizer Tail Feathers 2.0 3   
189     Jun 09, 2023 Prime and wrap up pushrods Controls 3.0 6   
188     May 30, 2023 Drilling pushrods and torque tubes Controls 3.0 4   
187     May 25, 2023 More pushrod and torque tube cutting Controls 2.0 5   
186     May 24, 2023 Riveting and priming aileron pushrods Controls 2.0 4   
185     May 23, 2023 Cutting and drilling pushrods for end caps Controls 1.5 3   
184     May 21, 2023 Assembling pushrod bellcrank brackets Controls 2.0 2   
183     May 18, 2023 Prepping and priming right wing lower skins Wings 2.0 5   
182     May 16, 2023 Dimpling and priming left lower skins Wings 3.0 4   
181     May 15, 2023 Cutting wing skin for pitot tube Wings 1.5 3   
180     May 14, 2023 Assembling the ADAHRS mounting tray Wings 2.0 3   
179     May 10, 2023 Right aileron gap seal installed, wiring fixed Wings 2.5 5   
178     May 08, 2023 Right flap gap seal installed Wings 2.0 1   
177     May 06, 2023 Building another worktable Workshop 4.0 2   
176     May 05, 2023 Attaching gap seals on left wing Wings 2.5 3   
175     May 03, 2023 Priming gap seals Wings 1.0 1   
174     May 01, 2023 Attach left OBLE and fuel tank. Wiring. Gap seals. Wings 4.5 7   
173     Apr 28, 2023 Engine and prop ordered Engine 1.0 0   
172     Apr 27, 2023 Attaching left OBLE Wings 2.5 5   
171     Apr 26, 2023 Right OBLE and fuel tank assembled Wings 2.0 4   
170     Apr 10, 2023 Joining OBLE to right wing Wings 2.0 4   
169     Apr 07, 2023 Finished fuselage inventory Fuselage 1.5 0   
168     Apr 04, 2023 Fuselage kit delivered and inventory started Fuselage 4.0 3   
167     Mar 22, 2023 Final bracket and holes in right wing Wings 1.5 3   
166     Mar 21, 2023 Rivet party to finish right top-skin Wings 4.0 2   
165     Mar 20, 2023 Starting to rivet right wingwalk Wings 3.0 1   
164     Mar 19, 2023 Cutting the wingtip lens covers with heat Lighting 0.2 2   
163     Mar 18, 2023 Priming, reassembling, riveting Wings 2.5 3   
162     Mar 16, 2023 Dimpling and scuffing Wings 2.0 4   
161     Mar 10, 2023 Dimpling the wing skins Wings 1.5 1   
160     Mar 09, 2023 Match drilling top wing skin Wings 2.0 2   
159     Mar 07, 2023 Riveting the right rear spar Wings 3.0 5   
158     Mar 05, 2023 Assembling the right rear spar Wings 3.0 2   
157     Mar 03, 2023 Priming rear spar and parts Wings 2.0 2   
156     Mar 01, 2023 Countersinking and dimpling rear spar Wings 1.5 2   
155     Feb 27, 2023 Rear spar doublers Wings 3.0 7   
154     Feb 24, 2023 Riveting the ribs to the main spar Wings 3.5 6   
153     Feb 23, 2023 Assembling inboard aileon bracket Wings 1.0 3   
152     Feb 21, 2023 Assembling rib brackets Wings 2.0 4   
151     Feb 20, 2023 Installing snap bushings on the ribs Wings 1.0 3   
150     Feb 18, 2023 Priming the right wing ribs Wings 1.5 1   
149     Feb 17, 2023 Prepping wing ribs for priming Wings 1.5 4   
148     Feb 15, 2023 Prepping parts for right spar Wings 1.5 2   
147     Feb 12, 2023 Finish countersinking right spar holes Wings 2.0 2   
146     Feb 08, 2023 Nutplate riveting and countersinking Wings 2.5 4   
145     Feb 07, 2023 Nutplate prep for right spar Wings 2.0 2   
144     Feb 06, 2023 Cutting and drilling J-channel for right wing Wings 2.5 3   
143     Jan 31, 2023 Adding mounts for landing lights Lighting 2.5 4   
142     Jan 27, 2023 Installing fittings on right tank Fuel Tanks 0.5 1   
141     Jan 25, 2023 Finishing the right fuel tank Fuel Tanks 1.0 1   
140     Jan 24, 2023 Closing up the right fuel tank Fuel Tanks 3.0 4   
139     Jan 20, 2023 Countersinking the attach brackets Fuel Tanks 0.5 1   
138     Jan 19, 2023 Closing up the left tank Fuel Tanks 4.0 11   
137     Jan 17, 2023 Install vent line fittings Fuel Tanks 0.5 2   
136     Jan 16, 2023 Stall warning installation, tie down hook holes Wings 1.0 3   
135     Jan 14, 2023 FlyLEDs control board and cutting wingtips Lighting 2.0 5   
134     Jan 12, 2023 Assembling FlyLEDs lighting Lighting 3.0 9   
133     Jan 10, 2023 Fixing reversed OBLE rib Wings 3.5 4   
132     Jan 09, 2023 Assembling the stall warning switch Wings 1.0 2   
131     Jan 08, 2023 Left OBLE fully riveted Wings 2.5 2   
130     Jan 07, 2023 Starting to rivet the left OBLE Wings 2.0 2   
129     Jan 05, 2023 Priming the left OBLE parts Wings 1.0 3   
128     Jan 04, 2023 Scuffed and dimpled left OBLE Wings 2.5 1   
127     Jan 03, 2023 Right OBLE done Wings 2.0 1   
126     Jan 02, 2023 Resuming riveting on right OBLE Wings 2.0 3   
125     Dec 22, 2022 Nutplates and Riveting the right OBLE Wings 2.5 4   
124     Dec 20, 2022 Priming Right OBLE parts Wings 2.5 4   
123     Dec 17, 2022 Dimpling right OBLE skin Wings 1.5 2   
122     Dec 15, 2022 Drilling and dimpling right OBLE parts Wings 1.5 2   
121     Dec 14, 2022 Assembling left OBLE for match drilling Wings 2.5 6   
120     Dec 13, 2022 More dimpling and rib prep Wings 3.5 4   
119     Dec 09, 2022 More leading-edge rib prep Wings 4.5 1   
118     Dec 05, 2022 Preparing parts for outboard leading edges Wings 4.0 1   
117     Dec 02, 2022 New workshop table Workshop 2.0 1   
116     Nov 30, 2022 Water leak testing the left tank Fuel Tanks 1.0 2   
115     Nov 28, 2022 J-channel, attach bracket, aft rib half, and nutplates for right tank Fuel Tanks 4.0 10   
114     Nov 21, 2022 Last 3 full ribs in right tank done Fuel Tanks 3.5 5   
113     Nov 20, 2022 Two more ribs down on right tank Fuel Tanks 2.5 3   
112     Nov 19, 2022 Starting to rivet ribs on right tank Fuel Tanks 2.0 3   
111     Nov 18, 2022 Bending fuel sender float arms Fuel Tanks 1.0 2   
110     Nov 13, 2022 Riveting last rib of left tank Fuel Tanks 2.0 4   
109     Nov 12, 2022 Bending vent lines and nutplates Fuel Tanks 2.5 5   
108     Nov 11, 2022 Installing J-channel and attach bracket on the left tank Fuel Tanks 4.0 5   
107     Nov 08, 2022 Final ribs of left fuel tank Fuel Tanks 3.0 3   
106     Nov 07, 2022 More fuel tank riveting Fuel Tanks 3.0 2   
105     Oct 27, 2022 Second rib added to left fuel tank Fuel Tanks 1.5 4   
104     Oct 26, 2022 Inventory of emp kit Empennage 2.0 1   
103     Oct 25, 2022 Starting to rivet fuel tank ribs Fuel Tanks 1.5 6   
102     Oct 18, 2022 Riveting and sealing the fuel filler caps Fuel Tanks 1.5 6   
101     Oct 17, 2022 Making replacement tube bracket Fuel Tanks 1.0 3   
100     Oct 14, 2022 Fuel drain flanges and attach bracket prep Fuel Tanks 2.5 5   
99     Oct 13, 2022 Stiffeners on right fuel tank Fuel Tanks 3.0 3   
98     Oct 12, 2022 Installed lower stiffeners on left fuel tank Fuel Tanks 2.0 1   
97     Oct 11, 2022 Starting the fuel tank stiffeners Fuel Tanks 2.5 3   
96     Oct 10, 2022 More alodine treatment of fuel tank parts Fuel Tanks 2.5 2   
95     Oct 06, 2022 Installing fuel tank fittings Fuel Tanks 2.0 6   
94     Oct 05, 2022 Plugging fuel tank hydroforming holes Fuel Tanks 1.5 3   
93     Oct 04, 2022 Alodine of fuel tank skin Fuel Tanks 1.5 1   
92     Oct 02, 2022 Alodine treatment of interior tank parts Fuel Tanks 3.0 4   
91     Sep 29, 2022 Cleaning fuel tank parts Fuel Tanks 1.0 0   
90     Sep 28, 2022 Scuffing fuel tank parts Fuel Tanks 2.5 4   
89     Sep 25, 2022 Close quarters dimpling fuel tank skins Fuel Tanks 1.5 3   
88     Sep 23, 2022 Dimpling the fuel tank skins Fuel Tanks 2.5 4   
87     Sep 22, 2022 Countersinking fuel tank skins Fuel Tanks 3.5 5   
86     Sep 21, 2022 Fuel tank countersinking and dimpling Fuel Tanks 4.0 5   
85     Sep 20, 2022 Fuel tank dimpling work Fuel Tanks 1.5 3   
84     Sep 19, 2022 Prepping fuel tank nose ribs Fuel Tanks 3.5 6   
83     Sep 17, 2022 Prepping fuel tank brackets and stiffeners Fuel Tanks 2.5 3   
82     Sep 16, 2022 Fluting the fuel tank ribs, Cutting stiffeners Fuel Tanks 3.5 4   
81     Sep 15, 2022 Finishing the left aileron Ailerons 1.0 3   
80     Sep 14, 2022 Closing up left aileron nose Ailerons 1.5 5   
79     Sep 13, 2022 Finishing up right aileron, Starting on left Ailerons 2.0 4   
78     Sep 12, 2022 Untwisting and closing right aileron Ailerons 3.0 5   
77     Sep 11, 2022 Preparing trailing edge extrusion for right aileron Ailerons 2.5 2   
76     Sep 07, 2022 Finishing right flap Flaps 2.0 3   
75     Sep 06, 2022 Closing up nose of right flap Flaps 3.5 5   
74     Sep 05, 2022 Right flap trailing edge countersinking and dimpling Flaps 1.0 1   
73     Sep 04, 2022 Finishing riveting of the left flap Flaps 2.5 2   
72     Sep 03, 2022 Riveting the nose skin of the left flap Flaps 4.0 9   
71     Sep 01, 2022 Countersink inboard nutplates and flaps AEX Flaps 1.0 2   
70     Aug 31, 2022 J-channel stiffener complete Wings 2.0 2   
69     Aug 30, 2022 Finished the upper skins on left wing, start on J-channels Wings 4.5 5   
68     Aug 29, 2022 Flush riveting the outboard skin Wings 4.0 4   
67     Aug 25, 2022 Safety wire and finishing inboard upper skin Wings 2.5 3   
66     Aug 24, 2022 Aileron hinge bracket attached Wings 2.5 3   
65     Aug 22, 2022 More wing skin riveting and other tasks Wings 2.0 3   
64     Aug 14, 2022 Skin riveting and prepping aileron hinge bracket Wings 4.0 4   
63     Aug 12, 2022 Starting to rivet skins on left wing Wings 3.0 4   
62     Aug 11, 2022 Dimpling outboard upper skin Wings 2.0 2   
61     Aug 10, 2022 New rear spar doubler cut and riveted Wings 2.0 4   
60     Aug 09, 2022 Vans Lightbox Kit Workshop 3.0 5   
59     Aug 07, 2022 Aileron hinge bracket woes Wings 3.0 2   
58     Aug 05, 2022 Dimpling wing-walk and inboard upper skin Wings 2.0 3   
57     Aug 04, 2022 Finish riveting rear wing spar, starting top skin Wings 2.0 6   
56     Aug 03, 2022 Aileron bellcrank and riveting rear spar doublers Wings 3.0 4   
55     Aug 02, 2022 More countersinking and priming Wings 3.5 3   
54     Aug 01, 2022 Countersinking nutplate screwholes in the spar Wings 2.0 2   
53     Jul 31, 2022 Attaching nutplates to left spar Wings 3.0 2   
52     Jul 20, 2022 Rear spar dimpling and prep Wings 2.0 2   
51     Jul 18, 2022 Match drilling doubler fork Wings 1.0 2   
50     Jul 17, 2022 Match drilling rear spar doublers Wings 3.0 4   
49     Jul 16, 2022 Starting on the left rear spar Wings 5.0 5   
48     Jul 14, 2022 Finished riveting ribs to left main spar Wings 3.5 2   
47     Jul 12, 2022 Riveting the ribs to left main spar Wings 4.0 2   
46     Jul 11, 2022 Bushings, riveting, and bolts for left wing ribs Wings 5.0 4   
45     Jul 10, 2022 Drilling and Priming the left wing ribs Wings 5.5 4   
44     Jul 08, 2022 Left wing ribs clecoed Wings 2.5 1   
43     Jul 07, 2022 Finished wing rib fluting Wings 6.5 2   
42     Jul 05, 2022 Countersinking spar and fluting left wing ribs Wings 5.5 5   
41     Jun 30, 2022 Spar nutplates and countersinking Wings 3.0 1   
40     Jun 28, 2022 Replacement hinge brackets for right aileron Wings 4.5 5   
39     Jun 26, 2022 Drilling holes in my left wing spar Wings 5.5 4   
38     Jun 24, 2022 Right aileron nose skin riveting Ailerons 3 2   
37     Jun 24, 2022 Continue riveting the left aileron Ailerons 4 3   
36     Jun 22, 2022 Flush riveting nose skin of the left aileron Ailerons 2.5 2   
35     Jun 21, 2022 Back riveting the stiffeners to the aileron skins Ailerons 2.5 3   
34     Jun 21, 2022 Primed right aileron skins Ailerons 1.5 2   
33     Jun 17, 2022 Left aileron skin prep Ailerons 4 4   
32     Jun 16, 2022 Right aileron nose caught up and stiffeners cut Ailerons 4.5 3   
31     Jun 15, 2022 Drilling the left aileron counterweight Ailerons 3.0 3   
30     Jun 14, 2022 Riveting aileron nose rib brackets Ailerons 3.0 3   
29     Jun 13, 2022 Continue prepping aileron parts Ailerons 6.5 4   
28     Jun 05, 2022 Starting on the ailerons Ailerons 2 1   
27     Jun 04, 2022 Finish riveting top skin of left flap Flaps 5.5 8   
26     May 31, 2022 Started riveting on left flap Flaps 5.0 2   
25     May 27, 2022 More right flap riveting and priming the left flap Flaps 6.0 4   
24     May 26, 2022 Flush riveting right flap skin Flaps 4 7   
23     May 26, 2022 More riveting of stuff to the right flap spar Flaps 1.5 2   
22     May 24, 2022 Riveting stuff to the right flap spar Flaps 2.5 5   
21     May 23, 2022 Priming and riveting right flap internals Flaps 4 7   
20     May 22, 2022 Dimpling right flap and SB review Flaps 3 2   
19     May 22, 2022 Woodworking building DRDT2 table Workshop 4 1   
18     May 21, 2022 Countersinking the right flap hinge brackets Flaps 2.0 3   
17     May 20, 2022 Dimpling and scuffing right flap Flaps 3.0 3   
16     May 18, 2022 Drilling and dimpling the right flap Flaps 2.5 2   
15     May 17, 2022 Mock assembly of the right flap Flaps 2.5 2   
14     May 16, 2022 Match drilling the left flap nose ribs Flaps 1 1   
13     May 15, 2022 Left flap ribs, hinge brackets, and cleco assembly Flaps 3 3   
12     May 14, 2022 Prepping left flap ribs Flaps 3.5 3   
11     May 13, 2022 Flap hinge brackets Flaps 2.5 1   
10     May 12, 2022 Wing kit inventory complete, starting on the flaps Flaps 3 3   
9     May 11, 2022 Wing kit delivery and inventory Wings 6 5   
8     Apr 26, 2022 Finished casters on second worktable Workshop 1 2   
7     Apr 25, 2022 Finished assembly of second worktable Workshop 2.3 1   
6     Apr 24, 2022 Started assembly of second worktable Workshop 1.5 1   
5     Apr 22, 2022 Finished first worktable Workshop 3 2   
4     Apr 21, 2022 Started assembling workbench 1 Workshop 3 2   
3     Apr 20, 2022 Continued cutting wood for workbenches Workshop 2 0   
2     Apr 16, 2022 Started cutting wood for workbenches Workshop 2 1   
1     Jan 23, 2022 Got a wing cart Workshop 4 4   
------------ -------------
Totals595.5    749   





NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.