Project: JodelDH251   -  
            Listing for Category : controls
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:David North   -  
Project:   Jodel DH251   -   VIEW REPORTS
Total Hours:1201
Total Expense:N/A
Start/Last Date:Jun 01, 2012 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=JodelDH251

Home or Last Project Picture

Oct 02, 2022     Autopilot servo mounting - (4 hours)       Category: Controls
Decided to locate the roll servo in the left wing sinilar to the DR400. Fabricated a mounting bracket form .062 6061. Added 12mm spruce to pack out and strengthen the #2 rib.
Located the pitch servo at the rear under the cut out for the tailplane mass balance, similar bracket. Made a mounting panel from 3.5mm ply and 18X18 spruce


 
Oct 19, 2021     Cable Fairings - (6 hours)       Category: Controls
Fabricated 6 cable exit fairings from 2 bid fiberglass over foam plug


 
Jan 27, 2020     Control Sticks - (4 hours)       Category: Controls
Bent steel tubing for control sticks. Used home made tube bender 1020 steel


 
Dec 19, 2016     Refabricated some controls - (10 hours)       Category: Controls
Re-machined the stabilator bearings and remade the trim tab hinges. The spherical bearings were a little loose in the old bearing blocks. The trim tab hinges were mounted too close the the end of the talplane ribs so I made them longer.


 
Apr 17, 2015     Misc elements - (6 hours)       Category: Controls
Pulley bracket Fin brace, Aileron pulley brackets


 
NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.