EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Jill's_WaiexB
-
Listing for Category : electrical
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (140)
Research
- (3)
Workshop
- (11)
Tools
- (27)
Fuselage
- (5)
Landing Gear
- (1)
Canopy
- (2)
Wings
- (47)
Tail Feathers
- (13)
Engine
- (1)
Fuel System
Firewall Forward
- (3)
Propeller
- (1)
Controls
- (2)
Lighting
- (10)
Instrument Panel
Avionics
- (7)
Interior Finish
- (1)
Paint / Decals
Inspection
Electrical
- (6)
Builder Name:
Juan Canton
-
Project:
Sonex - Waiex-B
-
VIEW REPORTS
Total Hours:
451.3
Total Flight Time:
Total Expense:
$60367.98
Start/Last Date:
Aug 30, 2019 - No Finish Date
Panel:
Garmin G3X + GNX375
Friendly URL:
https://eaabuilderslog.org?s=Jill's_WaiexB
Home or Last Project Picture
Nov 26, 2023
Right Wing Wiring
- (3.25 hours)
Category: Electrical
Completed Wire Runs and installation of seal all connectors on all necessary junctions.
20231125_174354.jpg
20231125_174357.jpg
20231125_183810.jpg
20231125_183842.jpg
20231125_183921.jpg
20231125_183940.jpg
20231125_184029.jpg
20231125_184129.jpg
20231125_184142.jpg
20231125_184704.jpg
20231125_185353.jpg
20231125_185401.jpg
20231125_185558.jpg
20231125_185616.jpg
20231125_185807.jpg
20231125_185821.jpg
20231125_190426.jpg
20231125_190526.jpg
20231125_192237.jpg
20231125_193622.jpg
Nov 19, 2023
Right Wing Electrical Prep Work
- (4 hours)
Category: Electrical
Ran the 3 conduit lines in the right wing, Wing Tip to Taxi Light Bay, Taxi Light Bay to Pitot Tube Bay, Pitot Tube Bay to Wing Root. This included fabricating mounts from the Pitot bay to the root of the wing, and enlarging tooling holes in other bays.
20231118_201311.jpg
20231118_201319.jpg
20231118_201326.jpg
20231118_201332.jpg
20231118_201750.jpg
20231118_201752.jpg
20231118_201832.jpg
20231118_201908.jpg
20231118_202003.jpg
20231118_202452.jpg
20231118_202500.jpg
20231118_202507.jpg
20231118_202953.jpg
20231118_203029.jpg
20231118_203112.jpg
20231118_204733.jpg
20231118_204735.jpg
20231118_204740.jpg
20231118_214532.jpg
20231118_214537.jpg
20231118_214805.jpg
20231118_215057.jpg
20231118_215440.jpg
20231118_220737.jpg
20231118_221502.jpg
20231118_222548.jpg
20231118_223324.jpg
20231118_223328.jpg
May 14, 2023
Installed wiring In left wing
- (3 hours)
Category: Electrical
installed conduit, and wiring in left doing including seal all connectors
20230513_181439.jpg
20230513_181510.jpg
20230513_181528.jpg
20230513_181531.jpg
20230513_181537.jpg
20230513_181553.jpg
20230513_181600.jpg
20230513_181714.jpg
20230513_182020.jpg
20230513_182023.jpg
20230513_182216.jpg
20230513_182837.jpg
20230513_182901.jpg
20230513_183116.jpg
20230513_183738.jpg
20230513_183937.jpg
20230513_184349.jpg
20230513_184352.jpg
20230513_185537.jpg
20230513_185608.jpg
20230513_185947.jpg
20230513_190038.jpg
20230513_190202.jpg
20230513_192158.jpg
20230513_201738.jpg
20230513_201805.jpg
20230513_201825.jpg
20230513_201838.jpg
20230513_201903.jpg
20230513_201923.jpg
20230513_201939.jpg
20230513_201956.jpg
20230513_202010.jpg
20230513_202014.jpg
20230513_202024.jpg
20230513_202130.jpg
20230513_202338.jpg
20230513_204319.jpg
20230513_204322.jpg
20230513_204327.jpg
20230513_212301.jpg
20230513_212308.jpg
Jan 23, 2023
Wing Wiring Schematic Design
- (2.5 hours)
Category: Electrical
Design of Wing Wiring and Connector Distribution
WIR-FW-001-.png
WIR-LW-001-.png
WIR-RW-001-.png
Jan 11, 2023
Wing Wiring and Connectors
- (.8 hour)
Category: Electrical
Stein Air Cable 73.33 Shipped, Connectors, tubing, and pin kits 165.83 shipped from spruce.
20230128_130003.jpg
20230128_130008.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.