EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Jill's_WaiexB
-
Listing for Category : workshop
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (139)
Research
- (3)
Workshop
- (11)
Tools
- (27)
Fuselage
- (5)
Landing Gear
- (1)
Canopy
- (2)
Wings
- (46)
Tail Feathers
- (13)
Engine
- (1)
Fuel System
Firewall Forward
- (3)
Propeller
- (1)
Controls
- (2)
Lighting
- (10)
Instrument Panel
Avionics
- (7)
Interior Finish
- (1)
Paint / Decals
Inspection
Electrical
- (6)
Builder Name:
Juan Canton
-
Project:
Sonex - Waiex-B
-
VIEW REPORTS
Total Hours:
447.8
Total Flight Time:
Total Expense:
$60367.98
Start/Last Date:
Aug 30, 2019 - No Finish Date
Panel:
Garmin G3X + GNX375
Friendly URL:
https://eaabuilderslog.org?s=Jill's_WaiexB
Home or Last Project Picture
Jun 24, 2021
Grinder Stand
- (1.2 hours)
Category: Workshop
Grinder stand built and installed grinder on to it.
20210624_215727.jpg
Jun 20, 2021
Added a stand to my workshop
- (1.5 hours)
Category: Workshop
Added a new mix use stand it can hold a grinder or a benchtop drill press. I intend to mount a drill press to this one have a separate one for the grinder.
20210624_220931.jpg
May 29, 2021
Storage Shelving Build
- (1 hour)
Category: Workshop
Built and arranged the workshop with new shelving.
May 28, 2021
Purchased a new Shelving unit to store wing parts.
- (.5 hour)
Category: Workshop
Jun 06, 2020
Second light for the work benches
- (.5 hour)
Category: Workshop
Second light for the work benches
May 30, 2020
Work Light Added
- (.5 hour)
Category: Workshop
Added a light over one of the work benches it works great i think i am going to pick up a second one and hang it over the other work bench next week
20200530_211923.jpg
Apr 25, 2020
Mat for standing fatigue
- (.5 hour)
Category: Workshop
Bought a mat to minimize fatigue while standing in the workshop.
Apr 24, 2020
Storage Shelving
- (5 hours)
Category: Workshop
Bought two separate storage racks one plastic one metal needed the different sizes to fit between the panels in the garage. Set them up in the garage and left space for a second set of racks in the garage.
20200424_220238.jpg
Apr 23, 2020
Table Number 2
- (4 hours)
Category: Workshop
Finished building the second table next thing on the docket is more shelving and doing an inventory of the kit.
20200424_220229.jpg
Apr 18, 2020
First EAA Table
- (4.5 hours)
Category: Workshop
Built the first of two EAA tables I am going to make.
20200418_183135.jpg
20200418_183140.jpg
20200418_183154.jpg
20200418_183159.jpg
20200418_193855.jpg
20200418_200118.jpg
20200418_201319.jpg
Apr 15, 2020
EAA Table Materials Ordered
- (1 hour)
Category: Workshop
Ordered all the lumber and hardware for the EAA tables from Chapter 1000. Plans attached for those that are interested.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.