Project:
MartysRV14A
-
Listing for Category : empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (453)
Research
Workshop
- (4)
Empennage
- (54)
Wings
- (84)
Fuselage
- (47)
Avionics
- (31)
Engine
- (40)
Propeller
Firewall Forward
- (41)
Controls
Lighting
- (2)
Instrument Panel
- (3)
Fuel System
- (1)
Finish
- (63)
Painting
- (2)
Inspection
- (3)
Insurance
- (1)
Air Cond
- (35)
Cowling Mod
Interior
- (1)
Transport
- (4)
Training
- (2)
Final Assemb
- (4)
Pre-Flight
- (4)
Flight
- (19)
Maintenance
- (7)
Performance
- (1)
Builder Name:
Martin Guinn
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
1990.5
Total Flight Time:
36.1
Total Expense:
N/A
Start/Last Date:
Aug 30, 2019 - Dec 06, 2021
Engine:
Lycoming YIO-390-A3B6 Thunderbolt
Propeller:
Hartzell
Panel:
G3X Touch/GTN 650xi, SteinAir
Friendly URL:
https://eaabuilderslog.org?s=MartysRV14A
Home or Last Project Picture
Dec 18, 2019
Empennage Fairings
- (10 hours)
Category: Empennage
Completed and installed horizontal and vertical tip fairings. Disassembled empennage from aft fuselage and transported to my hanger for storage.
IMG_6920.jpeg
IMG_6926.jpeg
IMG_6943.jpeg
Dec 03, 2019
Aft Fuselage: Fairings
- (6.0 hours)
Category: Empennage
Completed rudder top fairing and elevator end fairings.
IMG_6915.jpeg
IMG_6916.jpeg
Dec 02, 2019
Aft Fuselage: Fairings
- (2.0 hours)
Category: Empennage
Completed tail light installation to rudder fairing. The Molex connection drawing that came with the kit has a mistake. The leads from the light need to have male ends since the wiring cable came with female end pre-installed.
IMG_6907.jpeg
Dec 01, 2019
Aft Fuselage: Fairings
- (6.0 hours)
Category: Empennage
Completed trim TE riveting and reinstalled. Confirmed rudder/trim tab spacing. Left rudder and v. stab in position on fuselage to install rudder fairing. Fairly tedious work to trim and sand fairing to fit to lower rudder assembly, match drill, dimple, countersink, and rivet nut plates.
IMG_6902.jpeg
IMG_6903 (1).jpeg
Nov 30, 2019
Aft Fuselage: Trim Tab and Rudder Attachment
- (6.0 hours)
Category: Empennage
Returned to trim tab assembly. Used RTV to glue foam ribs and set aside with weights overnight. Removed v. stab and final drilled two 1/4" h. stab attachment holes. Reattached v. stab and installed rudder assembly. This took some time to get the three eyebolts aligned. Did not final torque any bolts at this time since it will all need to come apart again later.
IMG_6875.jpeg
IMG_6882.jpeg
Nov 28, 2019
Aft Fuselage: Control Horn Drilling
- (3 hours)
Category: Empennage
Confirmed right and left elevator travel and gaps. Left and right full up deflection measured 31deg and left and right full down deflection 29 deg. Elevator gap is 0.15 in (left) and 0.11 in (right). Measured torque tube to aft spar gap 9/64" greater than min required. Drilled hole through horns for attachment to clevis joint. Needed to turn down e-drill bushing to fit and pre-drilled #30 on drill press. Drilled hole in horns for later attachment of control rod.
IMG_6867.jpeg
IMG_6868.jpeg
IMG_6870.jpeg
IMG_6871.jpeg
IMG_6873.jpeg
Nov 27, 2019
Aft Fuselage: Install H. Stab and V. Stab
- (3 hours)
Category: Empennage
Bolted H. stab to fuse and match drilled aft spar for attachment bolts. Threaded eye bolts on elevators and temporarily mounted to h. stab.
IMG_6872.jpeg
Nov 26, 2019
Aft Fuselage: Top Skin Riveting
- (4 hours)
Category: Empennage
Riveted top skin using gun and bucking bar fore and aft as far as my arms would allow. Then turned fuse upside down and back-riveted the remainder. Worked pretty well.
IMG_6864.jpeg
Nov 19, 2019
Aft Fuselage: Left Side Skin and Top Skin Attachment
Category: Empennage
Installed clear tubing at intersection of j-stiffener and bulkheads to prevent wire chafing, not called out in plans. Secure tubing with RTV filet. Dimpled and riveted left side skin to aft fuselage. Applied 3M double-stick tape and clecoed top skin to side skins.
IMG_6842.jpeg
IMG_6851.jpeg
IMG_6857.jpeg
Nov 18, 2019
Aft Fuselage: Right Side Skin Attachment
- (8.0 hours)
Category: Empennage
Finished riveting aft deck. Installed and match-drilled vert. stabilizer (10-28). Dimpled and riveted top skin (10-29). Dimpled and riveted right side skin to aft fuselage (10-30,31).
Nov 17, 2019
Aft Fuselage: Rudder Cable, Static, UAT and ELT, Phone, and Aft Deck
- (8.0 hours)
Category: Empennage
Completed control and electrical installation including rudder cable (10-21), static lines (10-22), UAT antenna (10-23), ELT antenna (10-24), phone cable (10-26) and secured aft harness (10-25). Completed most of the steps on 10-27 to install aft deck.
IMG_6840.jpeg
IMG_6841.jpeg
Nov 16, 2019
Aft Fuselage: Skin Riveting, Nutplates, Bushings
- (5 hours)
Category: Empennage
Completed side skin riveting (10-19) and installed nutplates (10-20) and snap bushings.
IMG_6836.jpeg
Nov 15, 2019
Aft Fuselage: Rivet Side Skins
- (10 hours)
Category: Empennage
Long day riveting side skins, completing page 10-19, except for rivets securing side skins to bottom skins.
Nov 14, 2019
Aft Fuselage: Dimpling and Clecoing Side Skins
- (8.0 hours)
Category: Empennage
Completed page 10-14, dimpling side skins, stiffeners, and longerons, feeding control wiring, and clecoing to bulkheads. Cut and finished aft bottom skin (10-15, 16), riveted to aft bulkhead, and installed under and riveted to aft skin (10-17).
IMG_6832.jpeg
IMG_6835.jpeg
Nov 13, 2019
Aft Fuselage: Fuselage Assembly
- (6.0 hours)
Category: Empennage
Started page 10-14.
IMG_6831.jpeg
Nov 12, 2019
Aft Fuselage: Battery Angle, Bellcrank, and Bottom Skin Assembly
- (6.0 hours)
Category: Empennage
Completed pages 10-12 and 13. Placing bottom skin upside down on saw horses worked well for riveting. Has to use a slightly longer rivet (3-4 instead of 3-3.5) for the Stiffener Clip and Rudder Cable bracket.
IMG_6830.jpeg
Nov 11, 2019
Aft Fuselage: Bulkheads and Battery Angle
- (5 hours)
Category: Empennage
Completed bulkheads and battery angle, pages 10-09 and 10-10.
IMG_6828.jpeg
Nov 10, 2019
Aft Fuselage: Bulkheads
- (5 hours)
Category: Empennage
Completed 10-05,07,08,09. Note that #30 holes just left and right of the tie down bracket should not be dimpled. Primed non-alclad parts and attachment bulkheads.
IMG_6823.jpeg
IMG_6824.jpeg
Nov 02, 2019
Aft Fuselage: Part Separation and Preparation
- (6.5 hours)
Category: Empennage
Separated and deburred parts (10-02,03). Prepared horiz stab attachment bars and fabricated attachment bar and rudders stops (10-04). Primed parts per instructions.
IMG_6776.jpeg
IMG_6777.jpeg
Nov 01, 2019
Elevator: LE Rolling and Close-Out
- (6.0 hours)
Category: Empennage
Completed left and right elevator LE rolling, TE riveting, and final close-out riveting. Waiting on more tank sealant to complete trim tab.
IMG_6772.jpeg
IMG_6773.jpeg
IMG_6774.jpeg
Oct 31, 2019
Elevator: Pitch Trim Servo
- (2.0 hours)
Category: Empennage
Completed pitch trim servo assembly and molex connector (09-24, 25).
IMG_6770.jpeg
IMG_6771.jpeg
Oct 30, 2019
Elevator: Hinge Pin
- (2.0 hours)
Category: Empennage
Prepared bent hinge pin and secured to rear spar with spare piece of hinge (pg. 09-24).
IMG_6764.jpeg
Oct 29, 2019
Left Elevator: Final Assembly
- (5 hours)
Category: Empennage
Completed left elevator front spar insertion and riveting (09-20,21,22). Glued TE ribs to both elevators using tank sealant and set aside with weights.
IMG_6759.jpeg
Oct 28, 2019
Left Elevator: Assembly
- (9 hours)
Category: Empennage
Assembled left elevator. Prepped interior surface for TE rib installation (09-15), assembled front and rear spars (09-16,17), counterbalance skins and elev horns. Riveted rib and spar to skins (09-18,19). Used special bucking bar to rivet rear spar to skin (09-20).
IMG_6754.jpeg
Oct 27, 2019
Trim Tab: Initial Assembly
- (2.0 hours)
Category: Empennage
Started assembly of trim tab completing 09-13 and starting 09-14
IMG_6732.jpeg
Oct 26, 2019
Left Elevator: Initial Trim Tab Assembly
- (2.0 hours)
Category: Empennage
Trimmed TE to fit. Countersunk TE and trim tab spar (09-13). Picture shows set-ups used for countersinking.
IMG_6730.jpeg
IMG_6731.jpeg
Oct 25, 2019
Left Elevator: Disassembly, Deburring, Dimpling
- (8.5 hours)
Category: Empennage
Started left elevator and trim tab beginning with disassembly, deburring, and dimpling, skins and ribs and countersinking and dimpling spars (09-09, 10, 11). Fabricated pushrod and trim tab horns (09-12). Started assembly of trim tab
D28A5D4F-A2CE-4645-B97B-F88EA6DBBB4C.jpeg
Oct 24, 2019
Right Elevator: Front Spar Riveting and Close-Out
- (6.0 hours)
Category: Empennage
Riveted right front spar to ribs and completed inboard and outboard close-out (Page 09-20,21,22). Taped and clecoed TE to bottom skin (09-23). Ordered tank sealant from Van's for TE rib installation.
6ECDF840-47A4-4A59-9CE2-3F662F89F8AE.jpeg
Oct 23, 2019
Right Elevator: Initial Assembly
- (6.0 hours)
Category: Empennage
Completed initial riveting of right elevator up to insertion of front spar using special bucking bar for riveting skins to rear spar (pages, 09-17,18,19).
Oct 22, 2019
Right Elevator: Disassembly, Deburring, and Dimpling
- (6.0 hours)
Category: Empennage
Decided to complete right elevator first. Disassembled, deburred, dimpled, and countersunk parts as outlined on page 09-09,10, and 11. Scuffed skins for TE rib installation (09-15) and riveted front spar assembly as described on page 09-16
Oct 21, 2019
Elevators: Match Drilling and Initial Assembly
- (2.0 hours)
Category: Empennage
Clecoed and match drilled horns and close-out tabs. Completed initial assembly of right and left elevators, except for trim tab (09-08,09).
071684B3-7D93-4406-A57C-43A356461207.jpeg
539164DF-A13D-44FA-950C-9AD0B4B25487.jpeg
Oct 18, 2019
Elevator: Initial Clecoing and Match Drilling
- (6.0 hours)
Category: Empennage
Initial assembly of elevators and trim tab hinges to permit trimming and match drilling.
Oct 17, 2019
Elevator: Parts Preparation
- (4 hours)
Category: Empennage
Prepared TE ribs, bent close-out tabs, trimmed right rear spar, and drilled and clecoed front spar to skins (09-03,04, and 05).
Oct 16, 2019
Elevator: Rib and Shear Clip Preparation
- (2.5 hours)
Category: Empennage
Completed separating rib and shear clips (09-02).
A85486A4-E5B0-45DB-821E-8147FD24896B.jpeg
Oct 15, 2019
Horiz Stab: Transport Cradle and Storage
- (2.0 hours)
Category: Empennage
Built transport cradle and placed in temporary storage. Horizontal stabilizer shown next to vertical stabilizer in picture.
IMG_6695.jpeg
Oct 14, 2019
Horiz Stab: Rear Spar Insertion and Final Riveting
- (10 hours)
Category: Empennage
Completed all steps on 08-12 including insertion of rear spar and skin riveting.
IMG_6691.jpeg
IMG_6692.jpeg
Oct 13, 2019
Horiz Stab: Cleco and Rivet Skins
- (2.0 hours)
Category: Empennage
Started clecoing and riveting. Completed page 08-11
IMG_6689.jpeg
IMG_6690.jpeg
Oct 11, 2019
Horz Stab: Dimpling and Countersinking
- (6.0 hours)
Category: Empennage
Completed page 08-08 through 08-10 (2hr). Lots of dimpling and machine countersinking!
IMG_6686.jpeg
Oct 10, 2019
Horiz Stab: Cradle Fabrication and Initial Assembly
- (6.5 hours)
Category: Empennage
Completed page 08-05, 08-06, 08-07, and 08-09
IMG_6681.jpeg
Oct 09, 2019
Horiz Stab: Front and Rear Spar Assembly
- (4.5 hours)
Category: Empennage
Assembled and installed flange bearing to rear spar. Trimmed and deburred spar caps and stringers. Prepared front spar for riveting, lots of match drilling, deburring, machine countersinking. 3 hrs
IMG_6678.jpeg
IMG_6679.jpeg
Oct 08, 2019
Horiz Stab: Match Drill/Debur Rear Spar and Doubler
- (4.5 hours)
Category: Empennage
Completed page 08-02, match drilling and deburring rear spar and doubler. Riveted hinge brackets.
Oct 05, 2019
Rudder: TE Riveting and LE Rolling
- (6.0 hours)
Category: Empennage
Finished rudder, riveting TE, rolling LE and riveting. Carlos helped with rolling LE. Rudder secured to vertical stabilizer and mounted on wooden support.
IMG_6672.jpeg
Oct 04, 2019
Rudder: Riveting Skins
- (4.0 hours)
Category: Empennage
Fnished riveting except for TE and LE.
Oct 03, 2019
Rudder: Glue and Cleco TE
- (10 hours)
Category: Empennage
Back to working on rudder after waiting for 3M double-stick tape to arrive. Glued and clecoed TE to left skin overnight.
IMG_6667.jpeg
Sep 29, 2019
Rudder: TE Countersinking
- (2.0 hours)
Category: Empennage
Set up jig and countersinking trailing edge. Clecoed TE between skins to check fit and alignment.
IMG_6657.jpeg
IMG_6658.jpeg
Sep 28, 2019
Rudder: Install Skin Stiffiners
- (8.0 hours)
Category: Empennage
Match drilled, deburred, dimpled, and riveted skin stiffeners of the rudder. Very tedious and easy to make mistake, so went slowly (pages 07-06,07,08). Ordered 3M adhesive for mounting trailing edge and can't proceed until it arrives next week.
IMG_6653.jpeg
IMG_6656.jpeg
Sep 27, 2019
Rudder: TE Prep and Initial Assembly
- (3 hours)
Category: Empennage
Prepared trailing edge and clecoed and final sizing entire piece (pages 07-06,07). ATS tools arrived.
IMG_6651.jpeg
Sep 26, 2019
Rudder: Cleco, Match Drill, and Riveting Skeleton
- (5 hours)
Category: Empennage
Clecoing, final sizing, and riveting skeleton (pages 07-03, 04, 05)
Sep 25, 2019
Rudder: Assembling Parts
- (3 hours)
Category: Empennage
Located and prepared parts for assembly (pages 07-01,02). Installed new metal-cutting bandsaw blade.
Sep 24, 2019
Vert Stab: Finish Riveting
- (6.0 hours)
Category: Empennage
Complete riveting vert. stabilizer to finish Section 6. Carlos helped with bucking the front spar and middle rib.
IMG_6641.jpeg
Sep 23, 2019
Vert Stab: Dimpling and Countersinking
- (6.0 hours)
Category: Empennage
Dimpled and countersunk all parts. Carlos dropped by with countersink kit. Clecoed and riveted spar and ribs and clecoed to skin. Clecoed and riveted rear spar assembly.
IMG_6636.jpeg
IMG_6639.jpeg
Sep 21, 2019
Vert Stab: Initial Assembly and Match Drill
- (4.0 hours)
Category: Empennage
Completed cleco, final and match drilled all rib, spar, and skin holes
IMG_6618.jpeg
IMG_6619.jpeg
Sep 20, 2019
Vert Stab: Forward Spar
- (2.0 hours)
Category: Empennage
Completed forward spar mod. Dimpled using DRDT2 and riveted with p-squeezer. Ordered soft metal cutting blade for bandsaw since unit came with wood blade. Ordered remaining tools from ATS.
IMG_6615.jpeg
Sep 16, 2019
Empennage: Inventory
- (6.0 hours)
Category: Empennage
The empennage kit arrived on 08/30/19, but only now had time to open and inventory. Took 17 days from order to delivery from Oregon, not bad considering the expected impact of AirVentures19 orders. Everything is very nicely packed.
IMG_6587.jpeg
IMG_6592.jpeg