Project: MartysRV14A   -  
            Listing for Category : empennage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Martin Guinn   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:1990.5
Total Flight Time:36.1
Total Expense:N/A
Start/Last Date:Aug 30, 2019 - Dec 06, 2021
Engine:Lycoming YIO-390-A3B6 Thunderbolt
Propeller:Hartzell
Panel:G3X Touch/GTN 650xi, SteinAir
 
Friendly URL: https://eaabuilderslog.org?s=MartysRV14A

Home or Last Project Picture

Dec 18, 2019     Empennage Fairings - (10 hours)       Category: Empennage
Completed and installed horizontal and vertical tip fairings. Disassembled empennage from aft fuselage and transported to my hanger for storage.


 
Dec 03, 2019     Aft Fuselage: Fairings - (6.0 hours)       Category: Empennage
Completed rudder top fairing and elevator end fairings.


 
Dec 02, 2019     Aft Fuselage: Fairings - (2.0 hours)       Category: Empennage
Completed tail light installation to rudder fairing. The Molex connection drawing that came with the kit has a mistake. The leads from the light need to have male ends since the wiring cable came with female end pre-installed.


 
Dec 01, 2019     Aft Fuselage: Fairings - (6.0 hours)       Category: Empennage
Completed trim TE riveting and reinstalled. Confirmed rudder/trim tab spacing. Left rudder and v. stab in position on fuselage to install rudder fairing. Fairly tedious work to trim and sand fairing to fit to lower rudder assembly, match drill, dimple, countersink, and rivet nut plates.


 
Nov 30, 2019     Aft Fuselage: Trim Tab and Rudder Attachment - (6.0 hours)       Category: Empennage
Returned to trim tab assembly. Used RTV to glue foam ribs and set aside with weights overnight. Removed v. stab and final drilled two 1/4" h. stab attachment holes. Reattached v. stab and installed rudder assembly. This took some time to get the three eyebolts aligned. Did not final torque any bolts at this time since it will all need to come apart again later.


 
Nov 28, 2019     Aft Fuselage: Control Horn Drilling - (3 hours)       Category: Empennage
Confirmed right and left elevator travel and gaps. Left and right full up deflection measured 31deg and left and right full down deflection 29 deg. Elevator gap is 0.15 in (left) and 0.11 in (right). Measured torque tube to aft spar gap 9/64" greater than min required. Drilled hole through horns for attachment to clevis joint. Needed to turn down e-drill bushing to fit and pre-drilled #30 on drill press. Drilled hole in horns for later attachment of control rod.


 
Nov 27, 2019     Aft Fuselage: Install H. Stab and V. Stab - (3 hours)       Category: Empennage
Bolted H. stab to fuse and match drilled aft spar for attachment bolts. Threaded eye bolts on elevators and temporarily mounted to h. stab.


 
Nov 26, 2019     Aft Fuselage: Top Skin Riveting - (4 hours)       Category: Empennage
Riveted top skin using gun and bucking bar fore and aft as far as my arms would allow. Then turned fuse upside down and back-riveted the remainder. Worked pretty well.


 
Nov 19, 2019     Aft Fuselage: Left Side Skin and Top Skin Attachment       Category: Empennage
Installed clear tubing at intersection of j-stiffener and bulkheads to prevent wire chafing, not called out in plans. Secure tubing with RTV filet. Dimpled and riveted left side skin to aft fuselage. Applied 3M double-stick tape and clecoed top skin to side skins.


 
Nov 18, 2019     Aft Fuselage: Right Side Skin Attachment - (8.0 hours) Category: Empennage
Finished riveting aft deck. Installed and match-drilled vert. stabilizer (10-28). Dimpled and riveted top skin (10-29). Dimpled and riveted right side skin to aft fuselage (10-30,31).
 
Nov 17, 2019     Aft Fuselage: Rudder Cable, Static, UAT and ELT, Phone, and Aft Deck - (8.0 hours)       Category: Empennage
Completed control and electrical installation including rudder cable (10-21), static lines (10-22), UAT antenna (10-23), ELT antenna (10-24), phone cable (10-26) and secured aft harness (10-25). Completed most of the steps on 10-27 to install aft deck.


 
Nov 16, 2019     Aft Fuselage: Skin Riveting, Nutplates, Bushings - (5 hours)       Category: Empennage
Completed side skin riveting (10-19) and installed nutplates (10-20) and snap bushings.


 
Nov 15, 2019     Aft Fuselage: Rivet Side Skins - (10 hours) Category: Empennage
Long day riveting side skins, completing page 10-19, except for rivets securing side skins to bottom skins.
 
Nov 14, 2019     Aft Fuselage: Dimpling and Clecoing Side Skins - (8.0 hours)       Category: Empennage
Completed page 10-14, dimpling side skins, stiffeners, and longerons, feeding control wiring, and clecoing to bulkheads. Cut and finished aft bottom skin (10-15, 16), riveted to aft bulkhead, and installed under and riveted to aft skin (10-17).


 
Nov 13, 2019     Aft Fuselage: Fuselage Assembly - (6.0 hours)       Category: Empennage
Started page 10-14.


 
Nov 12, 2019     Aft Fuselage: Battery Angle, Bellcrank, and Bottom Skin Assembly - (6.0 hours)       Category: Empennage
Completed pages 10-12 and 13. Placing bottom skin upside down on saw horses worked well for riveting. Has to use a slightly longer rivet (3-4 instead of 3-3.5) for the Stiffener Clip and Rudder Cable bracket.


 
Nov 11, 2019     Aft Fuselage: Bulkheads and Battery Angle - (5 hours)       Category: Empennage
Completed bulkheads and battery angle, pages 10-09 and 10-10.


 
Nov 10, 2019     Aft Fuselage: Bulkheads - (5 hours)       Category: Empennage
Completed 10-05,07,08,09. Note that #30 holes just left and right of the tie down bracket should not be dimpled. Primed non-alclad parts and attachment bulkheads.


 
Nov 02, 2019     Aft Fuselage: Part Separation and Preparation - (6.5 hours)       Category: Empennage
Separated and deburred parts (10-02,03). Prepared horiz stab attachment bars and fabricated attachment bar and rudders stops (10-04). Primed parts per instructions.


 
Nov 01, 2019     Elevator: LE Rolling and Close-Out - (6.0 hours)       Category: Empennage
Completed left and right elevator LE rolling, TE riveting, and final close-out riveting. Waiting on more tank sealant to complete trim tab.


 
Oct 31, 2019     Elevator: Pitch Trim Servo - (2.0 hours)       Category: Empennage
Completed pitch trim servo assembly and molex connector (09-24, 25).


 
Oct 30, 2019     Elevator: Hinge Pin - (2.0 hours)       Category: Empennage
Prepared bent hinge pin and secured to rear spar with spare piece of hinge (pg. 09-24).


 
Oct 29, 2019     Left Elevator: Final Assembly - (5 hours)       Category: Empennage
Completed left elevator front spar insertion and riveting (09-20,21,22). Glued TE ribs to both elevators using tank sealant and set aside with weights.


 
Oct 28, 2019     Left Elevator: Assembly - (9 hours)       Category: Empennage
Assembled left elevator. Prepped interior surface for TE rib installation (09-15), assembled front and rear spars (09-16,17), counterbalance skins and elev horns. Riveted rib and spar to skins (09-18,19). Used special bucking bar to rivet rear spar to skin (09-20).


 
Oct 27, 2019     Trim Tab: Initial Assembly - (2.0 hours)       Category: Empennage
Started assembly of trim tab completing 09-13 and starting 09-14


 
Oct 26, 2019     Left Elevator: Initial Trim Tab Assembly - (2.0 hours)       Category: Empennage
Trimmed TE to fit. Countersunk TE and trim tab spar (09-13). Picture shows set-ups used for countersinking.


 
Oct 25, 2019     Left Elevator: Disassembly, Deburring, Dimpling - (8.5 hours)       Category: Empennage
Started left elevator and trim tab beginning with disassembly, deburring, and dimpling, skins and ribs and countersinking and dimpling spars (09-09, 10, 11). Fabricated pushrod and trim tab horns (09-12). Started assembly of trim tab


 
Oct 24, 2019     Right Elevator: Front Spar Riveting and Close-Out - (6.0 hours)       Category: Empennage
Riveted right front spar to ribs and completed inboard and outboard close-out (Page 09-20,21,22). Taped and clecoed TE to bottom skin (09-23). Ordered tank sealant from Van's for TE rib installation.


 
Oct 23, 2019     Right Elevator: Initial Assembly - (6.0 hours) Category: Empennage
Completed initial riveting of right elevator up to insertion of front spar using special bucking bar for riveting skins to rear spar (pages, 09-17,18,19).
 
Oct 22, 2019     Right Elevator: Disassembly, Deburring, and Dimpling - (6.0 hours) Category: Empennage
Decided to complete right elevator first. Disassembled, deburred, dimpled, and countersunk parts as outlined on page 09-09,10, and 11. Scuffed skins for TE rib installation (09-15) and riveted front spar assembly as described on page 09-16
 
Oct 21, 2019     Elevators: Match Drilling and Initial Assembly - (2.0 hours)       Category: Empennage
Clecoed and match drilled horns and close-out tabs. Completed initial assembly of right and left elevators, except for trim tab (09-08,09).


 
Oct 18, 2019     Elevator: Initial Clecoing and Match Drilling - (6.0 hours) Category: Empennage
Initial assembly of elevators and trim tab hinges to permit trimming and match drilling.
 
Oct 17, 2019     Elevator: Parts Preparation - (4 hours) Category: Empennage
Prepared TE ribs, bent close-out tabs, trimmed right rear spar, and drilled and clecoed front spar to skins (09-03,04, and 05).
 
Oct 16, 2019     Elevator: Rib and Shear Clip Preparation - (2.5 hours)       Category: Empennage
Completed separating rib and shear clips (09-02).


 
Oct 15, 2019     Horiz Stab: Transport Cradle and Storage - (2.0 hours)       Category: Empennage
Built transport cradle and placed in temporary storage. Horizontal stabilizer shown next to vertical stabilizer in picture.


 
Oct 14, 2019     Horiz Stab: Rear Spar Insertion and Final Riveting - (10 hours)       Category: Empennage
Completed all steps on 08-12 including insertion of rear spar and skin riveting.


 
Oct 13, 2019     Horiz Stab: Cleco and Rivet Skins - (2.0 hours)       Category: Empennage
Started clecoing and riveting. Completed page 08-11


 
Oct 11, 2019     Horz Stab: Dimpling and Countersinking - (6.0 hours)       Category: Empennage
Completed page 08-08 through 08-10 (2hr). Lots of dimpling and machine countersinking!


 
Oct 10, 2019     Horiz Stab: Cradle Fabrication and Initial Assembly - (6.5 hours)       Category: Empennage
Completed page 08-05, 08-06, 08-07, and 08-09


 
Oct 09, 2019     Horiz Stab: Front and Rear Spar Assembly - (4.5 hours)       Category: Empennage
Assembled and installed flange bearing to rear spar. Trimmed and deburred spar caps and stringers. Prepared front spar for riveting, lots of match drilling, deburring, machine countersinking. 3 hrs


 
Oct 08, 2019     Horiz Stab: Match Drill/Debur Rear Spar and Doubler - (4.5 hours) Category: Empennage
Completed page 08-02, match drilling and deburring rear spar and doubler. Riveted hinge brackets.
 
Oct 05, 2019     Rudder: TE Riveting and LE Rolling - (6.0 hours)       Category: Empennage
Finished rudder, riveting TE, rolling LE and riveting. Carlos helped with rolling LE. Rudder secured to vertical stabilizer and mounted on wooden support.


 
Oct 04, 2019     Rudder: Riveting Skins - (4.0 hours) Category: Empennage
Fnished riveting except for TE and LE.
 
Oct 03, 2019     Rudder: Glue and Cleco TE - (10 hours)       Category: Empennage
Back to working on rudder after waiting for 3M double-stick tape to arrive. Glued and clecoed TE to left skin overnight.


 
Sep 29, 2019     Rudder: TE Countersinking - (2.0 hours)       Category: Empennage
Set up jig and countersinking trailing edge. Clecoed TE between skins to check fit and alignment.


 
Sep 28, 2019     Rudder: Install Skin Stiffiners - (8.0 hours)       Category: Empennage
Match drilled, deburred, dimpled, and riveted skin stiffeners of the rudder. Very tedious and easy to make mistake, so went slowly (pages 07-06,07,08). Ordered 3M adhesive for mounting trailing edge and can't proceed until it arrives next week.


 
Sep 27, 2019     Rudder: TE Prep and Initial Assembly - (3 hours)       Category: Empennage
Prepared trailing edge and clecoed and final sizing entire piece (pages 07-06,07). ATS tools arrived.


 
Sep 26, 2019     Rudder: Cleco, Match Drill, and Riveting Skeleton - (5 hours) Category: Empennage
Clecoing, final sizing, and riveting skeleton (pages 07-03, 04, 05)
 
Sep 25, 2019     Rudder: Assembling Parts - (3 hours) Category: Empennage
Located and prepared parts for assembly (pages 07-01,02). Installed new metal-cutting bandsaw blade.
 
Sep 24, 2019     Vert Stab: Finish Riveting - (6.0 hours)       Category: Empennage
Complete riveting vert. stabilizer to finish Section 6. Carlos helped with bucking the front spar and middle rib.


 
Sep 23, 2019     Vert Stab: Dimpling and Countersinking - (6.0 hours)       Category: Empennage
Dimpled and countersunk all parts. Carlos dropped by with countersink kit. Clecoed and riveted spar and ribs and clecoed to skin. Clecoed and riveted rear spar assembly.


 
Sep 21, 2019     Vert Stab: Initial Assembly and Match Drill - (4.0 hours)       Category: Empennage
Completed cleco, final and match drilled all rib, spar, and skin holes


 
Sep 20, 2019     Vert Stab: Forward Spar - (2.0 hours)       Category: Empennage
Completed forward spar mod. Dimpled using DRDT2 and riveted with p-squeezer. Ordered soft metal cutting blade for bandsaw since unit came with wood blade. Ordered remaining tools from ATS.


 
Sep 16, 2019     Empennage: Inventory - (6.0 hours)       Category: Empennage
The empennage kit arrived on 08/30/19, but only now had time to open and inventory. Took 17 days from order to delivery from Oregon, not bad considering the expected impact of AirVentures19 orders. Everything is very nicely packed.


 