Project: FloMoSlingTSi   -  
            Listing for Category : Empennage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Aaron Garinger   -  
Project:   The Airplane Factory - Sling TSi
Total Hours:1061
Total Flight Time:
Start/Last Date:Dec 01, 2019 - No Finish Date
Engine:Rotax 915iS
Propeller:Airmaster Constant Speed Prop
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=FloMoSlingTSi

Home or Last Project Picture

Oct 13, 2020     VS Strobe/VOR Cables - (2 hours)       Category: Empennage
Installed strobe and VOR antenna RG-400 cable. Upsized holes need to 9.5mm using step drill. Used rubber grommets provided.

Used adel clamp (Aircraft Spruce - CLAMP MS21919-WDG4) on strobe wire to allow for upsizing existing hole in second rib vs drilling another hole at front of rib. Clamp will prevent wire from falling down into third rib opening where elevator swing arm moves.

Installed edge protection on top hole for strobe wire out to rudder.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.